Notice of Violation for Insp on 781024-27
ML17272A260
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/21/1978
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML17272A253 List:
References
50-397-78-10, NUDOCS 7901240335
Download: ML17272A260 (2)


Text

APPENDIX A Washington Public Power Supply 'System P. 0.

Box 968

Richland, Washington 99352 Docket No. 50-397 Construction Permit No.

CPPR-93 Notice of Violation Based on the results of NRC inspections conducted on October 24-27, 1978, it appears that one of your activities was not conducted in full compliance with conditions of your NRC facility License No.

CPPR-93 as indicated below.

This item is an infraction.

10 CFR 50, Appendix B, Criterion V, states, in part, that, "Activities affecting quality...shall be accomplished in accordance with these instructions, procedures or drawings...."

Paragraph D.2.5 of the guality Assurance Program documented in the PSAR states, in part, that, "...all project contractors for the nuclear related portions of the plant will'be required to have a guality Assurance Program...The program shall'nclude the following items as...applicable to the...construction for which the contractor is responsible.

Paragraph D.2.5.5 which follows states, in part, that, "Activities affecting quality...

shall be accomplished in accordance with...drawings...."

Contrary to the above, on October 25, 1978, lock nuts were not installed on three anchor bolts of a safety related vertical steel structural column at the 606 foot elevation of the Reactor Building.

Installation of, lock nuts on the anchor bolts, an activity affecting the quality of the structural

column, was specified by the applicable Burns 5 Roe Drawing Nos.
S727, Revision 13, and S650, Revision 27.

This construction activity was considered to be complete by the project contractor install-ing the column and its bolting.