ML17265A616
| ML17265A616 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/06/1999 |
| From: | Bajwa S NRC (Affiliation Not Assigned) |
| To: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| Shared Package | |
| ML17265A617 | List: |
| References | |
| TAC-MA4455, NUDOCS 9904090319 | |
| Download: ML17265A616 (4) | |
Text
Dr. Robert C. Mecredy ~
-'Jice President, Nuclear rations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
APPROVAL OF PROPOSED REVISION 26 TO THE ROCHESTER GAS AND ELECTRIC CORPORATION'S R. E. GINNA NUCLEAR POWER PLANT QUALITY ASSURANCE PROGRAM FOR STATION OPERATION (TAC NO. MA4455)
Dear Dr. Mecredy:
By letter dated December 21, 1998, as supplemented March 1, 1999, you transmitted proposed Revision 26 to the R. E. Ginna Nuclear Power Plant Quality Assurance Program for Station Operation (QAPSO).
Revision 26 to the QAPSO was submitted in accordance with the requirements of 10 CFR 50.54(a)(3) as reflecting changes that reduced commitments in the QAPSO description previously approved by the NRC. However, this submittal also included changes forwhich you were not seeking NRC approval based on your conclusion that they had no impact on commitments in the QAPSO.
As a result of a request for additional information by the NRC staff, you amended your original
'ubmittal via correspondence dated March 1, 1999. This submittal modified certain changes previously identified in the original and provided the additional information requested by the staff.
The enclosed safety evaluation (SE) documents the bases for our conclusion that the reductions in commitments, identified in Revision 26 to the QAPSO continue to satisfy the requirements of Appendix B to 10 CFR Part 50 and are, therefore, acceptable.
'\\
Sincerely,
-ORIGIINL SIGNED BY:
P r
9'F040'P03i'P 99040b PDR ADOCK 05000244 PDR Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl: See next page S. Singh Bajwa, Chief, Section 1
Project Directorate I
Division of Licensing Project Management Office of Nuclear Reactor Regulation
~g MW>1R %V DISTRIBUTION:
~Docket'.Filets PUBLIC J. Zwolinski/S. Black S. Bajwa G. Hill (2)
E. Adensam S. Little G. Vissing G. Shear A. Blough T. Quay OGC J. Peralta ACRS R. Norsworthy (email SE to RCN) ph
'OCUMENT NAME':iGINNAiSEA4455.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N"= No co OFFICE PD I -1/PM E
PD I-1/LA PD I -1/SC NAME DAIE Gvissing/rsl 04/
/99 P "I'1A7'f, SLitll 04/
/99 SBajwa 04/
/99 Official Record Copy 04
/99
~
(p,R RECy(
(4
~o Cy
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 2055&4001 April 6, 1999 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
APPROVAL OF PROPOSED REVISION 26 TO THE ROCHESTER GAS AND ELECTRIC CORPORATION'S R. E. GINNA NUCLEAR POWER PLANT QUALITY ASSURANCE PROGRAM FOR STATION OPERATION (TAC NO. MA4455)
Dear Dr. Mecredy:
By letter dated December 21, 1998, as supplemented March 1, 1999, you transmitted proposed Revision 26 to the R. E. Ginna Nuclear Power Plant Quality Assurance Program for Station Operation (QAPSO).
Revision 26 to the QAPSO was submitted in accordance with the requirements of 10 CFR 50.54(a)(3) as reflecting changes that reduced commitments in the QAPSO description previously approved by the NRC. However, this submittal also included changes forwhich you were not seeking NRC approval based on your conclusion that they had no impact on comniitments in the QAPSO.
As a result of a request for additional information by the NRC staff, you amended your original submittal via correspondence dated March 1, 1999. This submittal modified certain changes previously identified in the original and provided the additional information requested by the staff.
The enclosed safety evaluation (SE) documents the bases for our conclusion that the reductions in commitments identified in Revision 26 to the QAPSO continue to satisfy the requirements of Appendix B to 10 CFR Part 50 and are, therefore, acceptable.
Sincerely, Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl: See next page S. Singh Bajwa, Chief, Section 1
Project Directorate I
Division of Licensing Project Management Office of Nuclear Reactor Regulation
R.E. Ginna Nuclear Power Plant Peter D. Drysdale, Sr. Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road Ontario, NY 14519 Regional Administrator, Region I
U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. F. William Valentino, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Charles Donaldson, Esquire Assistant Attorney General New York Department of Lalw 120 Broadway New York, NY 10271 Nicholas S. Reynolds Winston 8 Strawn 1400 S Street N.W.
Washington, DC 20005-3502 Ms. Thelma Wideman, Director Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31 Lyons, NY 14489 Ms. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness 111 West Falls Road, Room 11 Rochester, NY 14620 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223