CATEGORY j REGULA, Y INFORMATION DISTRI BUTIOI. SYSTEM
( RIDS )
ACCESSION NBR: 9609050 248 DOC ~ DATE: 96/08/26 NOTARIZED:
NO DOCKET FACIL:50.-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester.
G 05000244 AU'I'H. SAME AUTHOR AFFILIATION MECREDY, R ~ C ~
Rochester Gas
& Electric Corp.
RECIP
~ NAME RECIPIENT AFFILIATION-VISSING, G ~ V ~
Document Control Branch
( Document Control Desk)
SUBJECT:
Provides anticipated completion dates re SQUG/IPEEE commitments
~
DISTRIBUTION CODE:
AO 1 1D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Generic Ltr 88-20 re Individual Plant Evaluations NOTES: License Exp date in accordance with 1 OCFR2, 2. 1 09 ( 9/1 9/72 ).
05000 244 RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AC ON, M FILE CEN 01 NRR DRPM/PECB RES/DST/I PEEE RGN 1
RGN 3
EXTERNAL: LITCO-BRYCE,J
~
NRC PDR pEog B!a! '/6GG6 oz &-~6 g ply~6
~g/!IRON FFEC5 gag t pSSA)SR<5 COPIES LTTR ENCL 1
1 1
1 1
7 1
1 1
1 1
I I
I I
I RECIPIENT ID CODE/NAME VIS SING F G
~
AEOD/S P D/RRAB NRR/DRPE/PD 1-3 NRR/DS SA/S P S B RES/PRAB RGN 2
RGN 4
NOAC COPIES
.LTTR ENCL D
U NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE I CONTACT THE DOCUMENT CONTROL DESK g ROOM OWFN SD-5 (EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON' NEED!
s2.
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCI,.
AND ROCHESTER GASANDELECTRICCORPORATION ~ 89 EASTAYENLIE,ROCHESTER, N.Y 16&9-00m AREA CODE716 546-27M ROBERT C. MECREDY Vice President Nucteor Operotions August 26, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Guy Vissing Project Directorate I-1 Washington, D.C.
20555
Subject:
Generic Letter 88-20 Supplement 4
Generic Letter 87-02 Supplement 1
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a):
Letter from R.C.
- Mecredy, RG&E, to A.R.
- Johnson, NRC,
Subject:
Generic Letter 88-20 Supplement 4
(TAC No.
M83624)
Generic Letter 87-02 Supplement 1
(TAC No.
M69449), dated May 22, 1995 (b)-
Letter from R.C.
- Mecredy, RG&E, to G.S. Vissing,
- NRC,
Subject:
Generic Letter 88-20, Updated
Response
to Request for Additional Information (TAC No.
M74414),
dated July 31, 1996
Dear Mr. Vissing:
In Reference (a),
RG&E noted that our anticipated completion date for SQUG/IPEEE commitments was July 1996.
- However, as a result of numerous changes at Ginna Station since that time (e.g. conversion to Improved Technical Specifications, Steam Generator Replacement, 18-month fuel cycle),
our PSA success criteria and fault tree models have all been extensively revised.
As documented in Reference (b), the Ginna Station PSA is expected to be resubmitted by November 15, 1996.
Since we are integrating our SQUG and IPEEE efforts, with input based on the PSA this delay has affected both programs.
We have completed all SQUG walkdowns, and data is now being evaluated.
Our projected schedules for completion are:
SQUG/IPEEE-seismic:
November 15, 1996 IPEEE-Fire PRA:
September 30, 1997.
Very ruly yours, Robert C. Mecred GJW5433 9609050248
'760826 PDR ADOCK 05000244 P
PDR PArL/Dp/g=Cg~
"n>'/DE /~mug Iong./D<~1>/
I'>eg /AaCtI
~M/ossa ~g.q~
Mr. Guy Vissing (Mail Stop 14C7)
Project Directorate I-1 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector
~s5,