Text
Febr y 15, 1995 Dr. Robert C. Hecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
SAFETY EVALUATION OF ROCHESTER GAS AND ELECTRIC'S PROPOSED EMERGENCY ACTION LEVEL CHANGES FOR THE R.E.
GINNA NUCLEAR POWER PLANT (TAC NO. H89506)
Dear Dr. Hecredy:
By letter dated Hay 13,
- 1994, as supplemented by letters dated November 7,
- 1994, and January 23,
- 1995, Rochester Gas and Electric Corporation submitted proposed changes to the R.E.
Ginna Nuclear Power Plant emergency action levels (EALs).
The proposed EALs incorporate the guidance in NUMARC/NESP-007, Revision 2 uHethodology for Development of Emergency Action Levels."
NUMARC/NESP-007 was endorsed by the NRC staff in Regulatory Guide 1. 101, Revision 3, "Emergency Planning and Preparedness for Nuclear Power Reactors,"
as an acceptable method for meeting the requirements of 10 CFR 50.47(b)(4) and Appendix E to 10 CFR Part 50.
The NRC staff has completed its review of the proposed changes and their supporting documentation.
As a result of that review, the staff concludes that the changes, as written, meet the requirements of 10 CFR 50.47(b)(4) and Appendix E to 10 CFR Part 50.
Conclusions are summarized in the enclosed safety evaluation.
Sincerely, Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl:
See next page DOCUMENT NAME:
A:GINNA.SE Original signed by Allen R. Johnson, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation To receive e copy of this document, Indicete in the boxu C"
as Copy without ettechmentlencloeure E
~ Copy with ettechmentlencloeure "N
~ No copy NAME DATE SLittl OFFICE LA:PDI-3 PH: PDI-3 AJohns
- mw V
/95 D: PDI-3 WButler
/, /95 95022i0287 950215 i
~
'q gy,a AE00 (4
~o 0O IVl0 qO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 February 15, 1995 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
SAFETY EVALUATION OF ROCHESTER GAS AND ELECTRIC'S PROPOSED EMERGENCY ACTION LEVEL CHANGES FOR THE R.E.
GINNA NUCLEAR POWER PLANT (TAC NO. M89506)
Dear Dr. Mecredy:
By letter dated May 13,
- 1994, as supplemented by letters dated November 7,
- 1994, and January 23,
- 1995, Rochester Gas and Electric Corporation submitted proposed changes.to the R.E.
Ginna Nuclear Power Plant emergency action levels (EALs).
The proposed EALs incorporate the guidance in NUMARC/NESP-007, Revision 2 "Methodology for Development of Emergency Action Levels."
NUMARC/NESP-007 was endorsed by the NRC staff in Regulatory Guide 1.101, Revision 3, "Emergency Planning and Preparedness for Nuclear Power Reactors,"-
as an acceptable method for meeting the requirements of 10 CFR 50.47(b)(4) and Appendix E to 10 CFR Part 50.
The NRC staff has completed its review of the proposed changes and their supporting documentation.
As a result of that review, the staff concludes that the changes, as written, meet the requirements of 10 CFR 50.47(b)(4) and Appendix E to 10 CFR Part 50.
Conclusions are summarized in the enclosed safety evaluation.
Sincerely, Docket No, 50-244
'nclosure:,
Safety Evaluation cc w/encl:
See next page Allen R. Johnson, Pr ject Manager Proj't Directorat I-3 Divi 'on of R r Projects - I/II Office o uclear Reactor Regulation
Dr. Robert C. Hecredy R.E. Ginna Nuclear Power Plant CC:
Thomas A. Hoslak, Senior Resident Inspector R.E.
Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road
- Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Hs.
Donna Ross Division of Policy Analysis E Planning New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, NY 12223 Charlie Donaldson, Esq.
Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Nicholas S.
Reynolds Winston
& Strawn 1400 L St.
N.W.
Washington, DC 20005-3502 Hs. Thelma Wideman
- Director, Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31
- Lyons, NY 14489 Hs. Mary Louise Heisenzahl Administrator-, Monroe County Office of Emergency Preparedness ill West Fall
- Road, Room 11 Rochester, NY 14620