ML17263A907

From kanterella
Jump to navigation Jump to search
Responds to NRC Request for Addl Info Re GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Control Assemblies.
ML17263A907
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/11/1995
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
GL-93-04, GL-93-4, TAC-M86848, NUDOCS 9501230212
Download: ML17263A907 (5)


Text

PRIORITY ACCELERATED RIDS Pl<OCESSIiG)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9501230212 DOC.DATE: 95/01/11 NOTARIZED: NO DOCKET N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit '1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas & Electric Corp. P RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3

SUBJECT:

Responds to NRC request for addi info re GL 93-04, "Rod Control Sys Failure & Withdrawal Of Rod Cluster Control Assemblies."

DISTRIBUTION CODE: A030D COPIES RECEIVED:LTR I ENCL TITLE: Generic Ltr-93-04-Rod Control System FaZXure & Wxthdrawa 0 SIZE: 0 o

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JOHNSON,A NRR/DRCH/HICB NRR/DRPW/T.PDI-V-1 NRR/DSSA/SRXB EXTERNAL: NRC PDR

~ P pc'7g 5/5 E4/

D 0

C U

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE IRELP US TO REDUCE KVASTE! CONTACT'I'IIE DOCL i!ENTCONTROL DESK, ROOK! Pl-37 (E>;T. 504-0083 ) TO ELI XIIN,KTE YOL'R iAifL FROif DISTRIBUTION LISTS I:OR DOCI.'NIEN'I'S YOL'ON"I'L'I:.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 6 ENCL

AH@

ROCHESlFR GAS AND ELECTRIC CORPORATION ~ B'rr EAS1 AVENUE, ROCHESlER, N. Y Id6d9-0001 AREA CODE716 5'-2700 ROBERT C. MECREDY Vice President N vcleor Operotione January 11, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Response to NRC Request for Additional Information Regarding Generic Letter 93-04, "Rod Control System Failure and Withdrawal of Rod Cluster Control Assemblies, 10CFR50.54(f)" TAC No. M86848 R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a): Letter from Martin J.'Virgilio (NRC), to Roger A. Newton (WOG), Generic Letter 93-04 Demonstration Plant Testing and Closure of Issuance, dated June 20, 1994 (b): Letter from Gary M. Holahan (NRC) to Roger A. Newton (WOG), WCAP-13864 "Rod Control System Evaluation" Revision 1 and Related Documents (TAC No. M88305), dated November 10, 1994

Dear Mr. Johnson:

By letter dated December 5, 1994 RGGE was requested to provide, within 30 days from receipt, confirmation that the current order timing modification and the new current order surveillance test (to be done each refueling outage) have been implemented.

As background on this issue, RGGE provided the required 45-day and 90-day responses to GL 93-04 in our letters dated August 5, 1993 and September 20, 1993. Pursuant to the Westinghouse Owners Group (WOG) efforts to resolve this issue, Ginna Station modified the current order timing for the rod control system and successfully performed lead plant testing on April 14 and 15, 1994. Test results were submitted to the NRC by the WOG in,a letter dated May 11, 1994 and were approved by NRC on June 20, 1994 (Reference a.).

The safety evaluation for the current order changes was submitted to NRC by the WOG in a letter dated July 22, 1994. NRC approved the safety evaluation as well as the following in their SER (Reference B): WCAP-13864 Rev. 1, "Rod Control System Evaluation Program"; Westinghouse Technical Bulletin NSD-TB-94-05-RO dated May 6 r 1 994 r Rod Contro l-CRDM Timing Change"; and WOG Recommended Rod Control System Surveillance Test (MUHP-6002).

9501230212 940111 PDR, ADGCK 05000244

.. P . PDR PgVI" Zdr9~~ +8/

RG&E confirms that the modification and lead plant surveillance testing was performed in accordance with the documents identified above. The rod control system surveillance test will continue to be conducted during each refueling outage.

Very truly yours, Robert C. Mecredy GAHi360 xc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector