~~8 RE00 Cy
~c Cl0 II/l
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 December 5,
1994 Dr. Robert C. Hecredy Vice President, Nuclear Production Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649 SUBJECT'EQUEST FOR ADDITIONAL INFORHATION (RAI) REGARDING GENERIC LETTER 93-04, "ROD CONTROL SYSTEH FAILURE AND WITHDRAWAL OF ROD CLUSTER CONTROL ASSEHBLIES, 10 CFR 50.54(f)" TAC NO. H86848
Dear Dr. Hecredy:
By letters dated August 5 and September 20,
- 1993, you responded to Generic Letter (GL) 93-04.
In your response, you discussed the possibility of conducting a new current order surveillance test and a current order timing modification.
The staff, by letter dated November 10, 1994, to the Westinghouse Owners Group (WOG), approved the following documents:
(1) WCAP-13864, Rev.
1, "Rod 7 Control System Evaluation Program,"
(2) Westinghouse Technical Bulletin NSD-TB-94-05-RO, "Rod Control CRDH Timing Change,"
and (3)
"WOG Recommended Rod Control System Surveillance Test."
The current order timing modification does not affect normal rod motion, but prevents asymmetric rod withdrawal should a Salem-type failure occur.
This modification was successfully tested at the Ginna Station on April 15, 1994.
The new current order surveillance test (to be done each refueling outage) verifies that no failures exist in the Rod Control System current order circuits.
The staff finds that the WOG's
- response, as discussed in the above Westinghouse documents, is an acceptable long-term resolution to GL 93-04.
The staff requests that you confirm that the current order timing modification and the new current order surveillance test (to be done each refueling outage),
as described in the above Westinghouse documents, have been implemented.
We request your response within 30 days from receipt of this letter.
The information collection contained in this request is covered by the Office bf Management and Budget clearance number 3150-0011, which expires July 31, 1997.
The public reporting burden for this collection of information is covered by the original estimate, which was estimated to average 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data
- needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Hanagement Branch (T-6 F33), U.S. Nuclear Regulatory 0". v 08 94i21200b2 94i205 PDR ADQCK 05000244, P
R.
C. Hecredy December 5,
1994 Commission, Washington, DC 20555-0001, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0011),
Office of Management and Budget, Washington, DC 20503.
Sincerely, Docket No. 50-244 cc:
See next page
'ISTRIBUTION:
~Docket File~
PUBLIC PDOI-3 R/F SVarga JZwolinski WButler SLittle AJohnson RJones OGC ACRS (4)
JLinville, RI TAlexion HChatterton HGarg Original signed by:
Allen R. Johnson, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation DOCUMENT NAME:
A:GIH86848 To receive a copy of this document, indicate In the bord "C
~ Copy without attachment/enclosure "E" ~ Copy with attachment/enclosure N" ~ No copy OFFICE LA:PDI-3
+ PH:PDI-3 D: PDI-3 NAME DATE SLittl 8/ /94 AJohnso 4/
/94 WButler X/ S/94
Dr. Robert C. Hecredy R.E.
Ginna Nuclear Power Plant CC; Thomas A. Hoslak, Senior Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road
- Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Hs.
Donna Ross Division of Policy Analysis R Planning New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, NY 12223 Charlie Donaldson, Esq.
Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Nicholas S.
Reynolds Winston 8 Strawn 1400 L St.
N.M.
Washington, DC 20005-3502 Hs. Thelma Wideman
- Director, Wayne County Emergency Hanagement Office Mayne County Emergency Operations Center 7370 Route 31
- Lyons, NY 14489 Hs. Hary Louise Heisenzahl Administrator, Honroe County Office of Emergency Preparedness 111 West Fall Road, Room ll Rochester, NY 14620