ML17261A512
| ML17261A512 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 06/10/1987 |
| From: | Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kober R ROCHESTER GAS & ELECTRIC CORP. |
| Shared Package | |
| ML17261A514 | List: |
| References | |
| NUDOCS 8706170195 | |
| Download: ML17261A512 (6) | |
See also: IR 05000244/1987003
Text
~g>>
.
f
. ACCESS1GN
NBR
~
~
~
FAC IL: 50-244
AUT'H. NAh'fE
OHNBTON> N. V
PECIP. hfANE
ROBER> R. N.
P~QULATOP Y Ih'FGR!A >TION DiSTP IBUTIGN BYST 8
< R IDB)
8706170195
DGC. DATE: 87/06/i0
NOTARIZED:
NG
Robert
Emmet Qinna Nuclear
Plant>
Unit
1>
Rochester
Q
AUTHOR AFFILIATI O>N
Region l. Office
oR Director
RECIPIENT AFFILIATION
Poches
er
Qas
~. Electric
Co> p.
DOCKET
N
05000244
SUB JECT:
Foreard s Insp
Rep t 50-244/87-03
on 870209-13
Pi notice
o-.
violation. Insp demonstrates
implementation
o~ util prog< am
to meet
"GCFR50. 49 requirements> save listed viola
~ ions.
DISTRIBUTION CODE:
IE01D
CGPiES
RECEiVED: LTP. J
ENCL +
SiZE: +
+'ITLE:
General
(50 Dkt)-Insp Rept/Notice
oF Violation Response
NOTES: License
Exp date in accoraance
xith
iGCFR2> =. 109<9/19/72).
05G00244
RECIPIFNT
ID CODE/NAME
PD'1-3
LA
STAHLE> C
CGP IES
LTTR ENCL
0
2
2
RFC IP 1ENT
ID CODE/NAKE
PDi-3 PD
COP IES
LTTR ENCL
1
i
INTERNAL:
ENF LIEBERhfAN
NRR/DGEA DIR
NRR/DREP/PPB
NR
hf S/iLRB
FILE
ILF
Ol
1li
2
1
1
DEDRO
ROE> N. L
NRR/DREP/EPB
NRR/DR i8
DIR
GQC/HDS2
PES
DEPY Qi
1
i
1
ETERNAL:
LPDR
NRC
TOTAL NUNBER
OF
CGP IEB REQUIRED:
LT; P.
2l
ENCL
20
Oocket
No. 50-244
JlN 10 1S87
Rochester
Gas
and Electric Corporation
ATTN:
Mr. Roger
W. Kober
Vice President
Electric and
Steam Production
49 East Avenue
Rochester,
14649
Gentlemen:
Subject;
Inspection
Report
No. 50-244/87-03
Enclosed is the report of the team inspection
conducted
by Mr. R. J. Paolino
and other
NRC inspectors
and representatives
on February 9-13,
1987 at the
Rochester
Gas
and Electric Corporation offices in Rochester,
New York and the
Ginna Station in Ontario,
New York of activities authorized
by
NRC License
No.
OPR-18.
The team's findings were discussed
with you and
members of your staff
at the conclusion of the inspection.
The inspection
reviewed your implementation
of a program for establishing
and maintaining the qualification of electric
equipment within the
scope of 10 CFR 50.49.
Within these
areas
the inspection
consi sted of examination of selected
procedures
and records,
interviews with
personnel,
observations
and
a physical
walkdown verification of specific electrical
equipment.
Based
on the results of this inspection, it appears
that
some of your activities
were not conducted
in full compliance with NRC requirements,
as setforth in the
Notice of Violation, enclosed
herewith
as Appendix A.
These violations
have
been categorized
by severity level in accordance
with the "General
Statement of
Policy and Procedure
for NRC Enforcement Actions,
10 CFR Part 2, Appendix
C
(Enforcement Policy 1987)."
You are required to respond
to this letter and in
preparing your response,
you should follow the instructions
in Appendix A.
The inspection
determined that you have
implemented
a program to meet the
requirements
of 10 CFR 50.49 except for the violations identified in the
enclosed
inspection report.
These violations involve 1) failure to demonstrate
qualification of Crouse-Hinds
(Eg File No. 8); 2) failure to
demonstrate
qualification of PVC cable
(Eg File No. 44); 3) failure to
demonstrate
qualification of Coleman
Cable
(Eg File No. 13); 4) failure to
demonstrate
qualification of Victoreen High Range Radiation'Wonitor (Eg File
No. 36); 5) failure to demonstrate
qualification for installed
Raychem splice
bend radius
and seal
lengths
less
than
two inches.
The response
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required
by the Paperwork
Reduction Act of 1980,
PL-96-511.
87061T01S'5
870610
ADQCK 05000244
8
OFFICIAL RECORO
COPY
IR GINNA 87-03 - 0001.0.0
06/09/87
o~
)
Your cooperation with us in this matter is appreciated.
We are available to
discuss
any questions
you have concerning this inspection.
Sincerely,
prfginal Signeh By'.
William V. Johnston,
Acting Director
Division of Reactor Safety
cc w/encl:
Harry H. Voigt, Esquire
Central
Records
(4 copies)
Director,
Power Division
Public Document
Room
(POR)
Local Public Document
Room ( LPOR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
w York
State of Ne
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
DRP Section Chief
Uldis Potapovs,
D. Holody, RI
Enclosure:
1.
Appendix A, Notice of Violation
2.
NRC Region
1 Inspection
Report
No. 50-244/87-03
RI:DRS
Paolino/ca
6/7 /87
RI:
RS
Anderson
P/ < /87
g ~
~ +H5
Pv A/Z
c/a'T
OFFICIAL RECORD
COPY
IR GINNA 87"03 " 0002.0.0
06/09/87