Responds to NRC Re Violations Noted in IE Insp Rept 50-244/81-03.Corrective Actions:Training Section Complement at Facility Increased by Addition of Assistant Training Coordinator to Prevent Recurrence of Violation
ML17258B016
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/10/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17258B015 List:
References
NUDOCS 8105070499
Download: ML17258B016 (4)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION

'll 4%i 0

89 EAST AVENUE, ROCHESTER, H.Y. /4649 JOHN E.

!VAIE'9 VICE PRESIDENT Tet.EPHO'NE iRe*cocc-ie 5~6 2700 April 10, 1981 Mr. Eldon J. Brunner, Chief Reactor Operations and Nuclear Support Branch Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Inspection 50-244/81-03 Notice of Violation, Failure to Perform SC-1 Drillwithin Specified Frequency R. E. Ginna Nuclear Power Plant, Unit No.

1 Docket No. 50-244

Dear Mr. Brunner:

In accordance with the above subject which stated:

"As a result of the inspection conducted on December 1, 1980 through January 31, 1981, and in accordance with the Interim Enforcement Policy, 45 CFR 66754 (October 7, 1980), the following violation was identified:

10 CFR 50, Appendix E, IV. Content of Emergency Plans, states in part, 'The emergency plans shall contain... the following elements

... I. Provisions for testing by periodic drills, of radiation emer-gency plans

...'ite Contingency (SC)-1, Radiation Emergency Plan, Revisions 12 through 14, issued between May 2, 1979 and January 8, 1981, state in paragraph 7.1.5,

'A planned Radiation Emergency drill shall be held annually.'ontrary to the above, as of January 31, 1981, a radiation emergency drill was last held October 26, 1979."

the following is submitted in response.

ay 050VDIIIP

r

~~

r ROC8aST=R OPS ANO LFCTRIC CORP.

ATc April 10, 1981 To Mr. Eldon J. Brunner, Chief Sr'=

7.YO.

2 The cause for failure to perform this drill was sufficient manpower and plant work load.

During the fall of 1980, the time that the drill was to be performed, Ginna Station was shut down for a Steam Generator Eddy Current Inspection Program.

During this time period, the training section was actively involved in the following:

Training required to support the outage needs New NRC Cperator License Program with the NRC exam occurring during the fall A training program designed to improve.the technical background of the operator in conjunction with the Rochester Institute of Technology Other normal Requalification and Administrative training Additionally, the plant personnel necessary for the drill and associated

.training were actively involved in the outage.

This lack of training was additionally identified by the NRC Radio-logical Assessment Team which was also on site at the end of last year and an agreed upon training schedule was established.

This is documented in Mr. Boyce H. Grier's letter dated December 19, 1980 to John E. Maier regarding radiation protection and emergency planning, specifically item 2C.

To prevent recurrence the Training section complement at Ginna has been increased by the addition of an Assistant Training Coordinator with expertise in the Health Physics area.

In further efforts to meet increased training demands, management has approved requisitions for an additional two persons in Ginna's training section.

These requisitions are actively being pursued.

The appropriate training as mentioned above was performed by the agreed upon date and the drill was completed on February 18, 1981.

Very truly yours, Jo n E. Maier Subscribed and sworn to me on this 10th day of April 1981.

SHARON G. CAVALERI IIOTARY PUBLIC, Sta!e of N.Y., Monroe County My Commission Expires March 30, 19..++