Submits Comments on NRC 810727 Draft Evaluation of SEP Topic IX-4 Re Boron Addition Sys.Listed Addl Documents Should Be Referenced
ML17257A528
Person / Time
Site: Ginna 
Issue date: 08/06/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-09-04, TASK-9-4, TASK-RR NUDOCS 8108130185
Download: ML17257A528 (4)


Text

REGULATORY ORMATION DISTRIBUTION SYS 8

(RIDS)

ACCESSION NBR: 8108130185 DOC. DATE.: 81/08/06 NOTARIZED: No DOCKET 0

FACIL~:50-244 Robert Emmet Ginna Nuclear Plant~

Unit ii Rocheste'r G

05000244 AUTH',NAME AUTHOR AFFILIATION MAIERpJ.E'.

Rochester Gas 8 Electric Corp.

RECIPe NAME~

RECIPIENT AFFILIATION CRUTCHF IELDg D ~

Operating Reactors Branch 5

SUBJECT:

Submits comments on NRC 810727 draft evaluation of SEP. Topic IX-4 re boron addition sys,L>>isted addi documents should be refer enced.

DISTRIBUTION CODE,:

A035S COPIES RECEIVED: LTR Q ENCL' SIZE:

J.

TITLE".

SEP Topics NOTES: 1 copy;SEP

Sect, Ldr.

050.00244 RECIPIENT ID CODE/NAME)

ACTION:

ORB 05 BC 04 INTERNALto A/D MATLEQUALi13>>

HYD/GEO BR 10, NRC PDR 02 01 COPIES LTTR ENCL RECIPIENT ID CODE/NAME CONT SYS A

07 I8E 06 OR ASSESS BR 11.

SEP BR 12 COPIES LTTR ENCL'XTERNALS:

ACRS NSIC 14 05 16 1

1 LPDR NTIS 03 Q

TOTAL NUQBER OF COPIES R'EQUIRED:

LTTR ENCL

l K~ &% Ik

.1 t

ll H

)l l

II

///////////////

ml/F p

I( s>> YORK.'

l////","ill'OCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.

MAIER VICE PRESIDENT August 6, 1981 Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U.

S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

SEP Topic IX-4, Boron Addition System R. E. Ginna Nuclear Power Plant Docket. No. 50-244 TEL N~

AREA C e CA

~ 1$Q pUG 12198>

I

-9' E(DO(ATOLL MI~ INmISSO<

~o (4

Dear Mr. Crutchfield:

We have reviewed the draft evaluation of SEP Topic IX-4, provided by your letter dated July 27, 1981 and agree with the assessment and conclusions.

We also offer the following comments:

We suggest that the second and third sentences of the Intro-duction be rewritten as follows:

"In this initial injection mode, borated water is provided from the boric acid tanks, the refueling water storage tank, and the accumulators.

After this initial period, which will last at least'.

20 minutes for a large break LOCA, and longer for smaller

breaks, the Emergency Core Cooling System (ECCS) 2.

The following additional documents should be referenced, although they do not change the conclusions of the assessment.

a.

Letter to B. C. Rusche, NRC, from L. D. White, Jr.,

RGK, dated April 1, 1975.

b.

Letter to T.

M. Novak, NRC, from C. L. Caso, Westinghouse, CLC-NS-309, dated April 1, 1975.

c.

Letter to B.

C. Rusche, NRC, from L. D. White, Jr.,

RGSE, dat:ed April 30, 1975.

d.

Letter to B.

C. Rusche, NRC, from L. D. White, Jr.,

RG6E, dated May 13, 1975.

In addition, we have not, previously obtained a copy of Reference 1 and would appreciate receiving a copy.

Very truly yours, 8i08i30185 8i080b PDR ADGCK 05000244 P