Proposed Tech Specs Allowing Containment Fire Detection Instruments to Be Made Inoperable During Containment Leak Rate Test
ML17256A852
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/23/1982
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17256A851 List:
References
NUDOCS 8204280223
Download: ML17256A852 (4)


Text

INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE HEAT SMOKE

9. Screen House Area Detection Serv.

Water Pump and Bus Area Cable Trays Basement N/A N/A 10.

Standby Auxiliary Feedwater Bldg.

N/A

11. Cable Tunnel
12. Auxiliary Building General Area Area Basement East Area Basement West and RHR Pit Cable Trays/SI Pumps Basement Penetration Area Cable Traysi Mezz.

Cable Trays, Elec.

Cab.

Mezz.

Center Cable Trays Mezz. East Area Operating Floor 10 N/A N/A N/A N/A N/A N/A N/A N/A 8

59, 5

4 13

  • Resistance Temperature Detectors (RTD) Only

+* Line Type Detectors

      • The fire detection instruments located within the containment are not required to be operable during the performance of Type A containment leakage rate

~

tests.

880488c awe

3. 14-8 Amendment No. ~~i >9 Proposed
TABLE 3. 14-1 FIRE DETECTION INSTRUMENTS ZNSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE***
1. Containment "A" Post-Accident Charcoal Bank "B" Post-Accident Charcoal Bank "A" Aux. Filter Charcoal Bank "B" Aux. Filter Charcoal Bank Cable Trays Basement Elev.

Cable Trays Intermed: Elev.

Cable Trays Operating Floor "A" RCP Intermediate Floor "B" RCP Intermediate Floor Area Detection Operating Floor

2. Control Room Area and Cabinet Control Room/Turb. Bldg. Wall
3. Relay Room
4. Comouter Room Under Floor Ceiling
5. Battery Roons "A" Battery Room "B" Battery Roon
6. Control Building Air Handling Room
7. Diesel Generator "A" Generator Room "A" Generator Vault "B" Generator Room "B" Generator Vault HEAT 3*

3*

1*

1*

1**

2**

1**

1**

1**

N/A N/A 4

N/A N/A N/A N/A N/A 2

N/A 2

N/A SMOKE N/A N/A N/A N/A N/A N/A N/A N/A N/A 7

19 N/A 16 N/A 1

N/A 1

8. Intermediate Building Motor Driven Aux. Fd.

Pump Area Turb. Driven Aux. Fd.

Pump

& Res.

Cable Trays Basement North "A" Purge Filter Elev.

315 '-4" "B" Purge Filter Elev. 315'-4" N/A 1

N/A N/A N/A 9

N/A 14 1

1 3.14-7 Amendment No. ~, gA, 39 Proposed

Attachment B

Fire detectors at Ginna have been demonstrated to be sensitive to dust and particulates which are stirred up during maintenance activities.

Pressurization and depressurization of the containment during an integrated leak rate test may cause dust and particulates to give spurious fire alarms from the containment.

During integrated leak rate tests, no maintenance activities will be taking place in the containment.

A final inspection of the containment is made after maintenance activities have

ceased, prior to commencing the integrated leak rate test.

Thus, the risk of fires caused by welding, burning or grinding or other personnel activities does not exist.

During the test the plant is at cold shutdown with the reactor coolant pumps turned off.

The risk of fires caused by oil leaks onto hot equipment is significantly reduced from the risk at power operation.

The only significant fire hazards in the containment during the test are the operating containment fan coolers.

Monitoring containment temperature during the test will provide an indication of fire.

In addition, fan cooler bearing vibration and air plenum temperature instruments in the control room will provide an indication of fan cooler trouble.

This change conforms with the Standard Technical Specifications for Westinghouse plants in accordance with NUREG-0542, Revision 4 ~

Therefore, making the fire detectors inoperable during integrated leak rate tests will not result in a significant increase'in fire risk.

1