~:i October 27, 1982 Docket No. 50-244 LS05-82-10-082 Mr. John E. Maier, Vice President Electric and Steam Production Rochester Gas and Electric Corporation 89 East Avenue Rochester, New York 14649
Dear Mr. Maier:
DISTRIBUTION Docket NRC PDR Local PDR ORB Reading NSIC DCrutchfiel d HSmith JLyons OELD ELJordan JMTaylor ACRS (10)
SEPB TIppo1 ito GHolahan DPickett
SUBJECT:
REVISED PEAK CLAD TEMPERATURE CALCULATION - R. E. GINNA NUCLEAR POllER PLANT Your letter of May 20, 1982, submitted a reanalysis of the peak clad temperature following the limiting loss-of-coolant accident for the R. E. Ginna Nuclear Power Plant.
This analysis was required when it was realized that the Hay, 1978 calculation performed by the Exxon Nuclear Company incorrectly took credit for only one of the four containment fan coolers.
A conservative analysis must assume that all post-accident heat removal systems operate at their maximum capacity.
You -documented this error in licensee event report LER 81-022/OIT-O, dated January 4, 1982.
Your reanalysis assuming nominal primary coolant system pressure and temperature resulted in a peak clad temperature of"1928oF.
This analysis accounts for the affects of upper plenum injection.
As you requested, our review did n'ot"'include the analysis at reduced reactor coolant system pressure and temper ature which was included in the submittal.
Me have completed our review of your reanalysis and our Safety Evaluation Report is 'e'n'closed.
The addition of three containment fan coolers in the reanalysis increases the peak clad temperature from 1906oF to 1928oF.
lie find the reanalysis to be acceptable.
~Sincerely, Original signed by Si>S040a>S Saaoa7
'DR ADDCK 05000244 P
- PDR, l
Enclosure:
Safety Evaluation Report Dennis M. Crutchfield, Chief Operating Reactors Branch 85 Di'v.ision of Licensing sm/
gggg caX+f(OI)
OFFICEIW SURNAMEP OATE $
cc w/encl
""'SF6"NUKED'ure:
age 0 ~ ~ ~
~ 0
~
~
~
L: 0 5
Lyo
- cc Cr chfiel d Ik/$1LN........
NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1991~&960
r
~
y.M C
~
~ Q a;A Ct Oil)d 1 ~I '
4 1 (tie>>
il ')>>
%4 ~ hSS ALL Std Nr. John E. Naier October 27, 1982 CC Harry H. Voigt, Esquire
- LeBoeuf, Lamb, Leiby and NacRae 1333 Hew Hampshire Avenue, H. M.
Suite 1100 Mashington, D.
C.
20036 Nr. Nichael Slade 12 Trailwood Circle Rochester, Hew York
,14618 I
Ezra Bialik Assistant Attorney General Environmental Protection Bureau
. Hew York State Department of Law 2 Morld.Trade Center Hew York, Hew York 10047 U. S. Environmental Protection Agency Region II Office ATTH:
Regional Radiation Representative 26 Federal Plaza Hew York, Hew York 10007 Herbert Grossman, Esq.,'Chairman Atomic Safety and Licensing Board U, S. Huclear Regulatory Commission Mashington, D. C.
20555 Ronald C. Haynes, Regional Admini'strator Huclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Penhsylvania 19406
.Resident Inspector-R. E. Ginna Plant c/o U.. S.
HRC 1503 Lake Road
'.Ontario, Hew York
.14519 Director, Bureau of Huclear
- Operations State of Hew York Energy Office
,Agency Building 2 Empire State Plaza
'. Albany, Hew York 12223
'upervisor of the Town
,of Ontario
,.107 Ridge Road West
~
,Ontario, Hew York 14519
,Dr,; Emmeth A. Luebke Atomic Safety and Licensing Board U.
S. Hvclear Regulatory Commission
,'Washington, D.
C.
20555 Dr. Richard F. Cole Atomic Safety and Licensing Board
.U.
S. Huclear Regulatory Commission Mashington, D.
C.
20555