ML17252A665

From kanterella
Jump to navigation Jump to search
Forwards Revised Environ Qualification Testing Schedules & Locations for Facilities,Per NRC Request.Updated Info Provided to Facilitate NRC Review of Licensee Testing Program
ML17252A665
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 05/28/1981
From: Rausch T
COMMONWEALTH EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8106020296
Download: ML17252A665 (3)


Text

/

e e

Commonwealth Edison One First National Plaza. Chicago, Illinois Address Reply to: Post Office Box 767 Chicago. Illinois 60690 May 28, 1981 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Dresden Station Units 1, 2 and 3 Q u.a d Cities St at ion Un i ts 1 and 2 Zion Station Units l and 2 La£alle County Station Units 1 and 2 Byron Station Units l and 2 Rraidwood Station Units l and 2 Update of EQEE Testi*ng Schedules and Lo£ at ions NRC Docket No.s. 50-10/237/249, 50-254'/265,.

50.-295/304, 50-373/374, 50-454/455, and 50*456/457*..... -.... -

Reference (a):

D.

G~ Eisenhut letter to All Licensees and Ap.pl icants dated October l, 1980.

(b).:

J.. S. Abel letter to D. G. Eisenhut dated November 26, 1980 Dear Mr.

Eisen~ut:

In response to your Reference (a) request,. Commonwealth Edison provided in Reference.(b) pertinent information concerning environmental q.ualification testing programs being c~rrducted on equipment used or to b.e u.sed in our facilities.

At the telephone request of Mr. J. R. Agee (NRC R-IV, Arlington, Texas), we have agreed to update this information to f a c i 1 i t ate h i s re v i e w of l f c ens e e ' s t e st i n g p r o g r a m.s

  • E n c 1 o s.e d are the revised Commonwealth Edison environmental qu.alificat.ion testing
  • schedules and' locations for Dresden, Quad Cities, Zion, LaSalle County, Byron a-n.d* Bracidwood s.tat.ions.

p*1eas.e* address any. q*u.es.tion.s you ma*y have. in this re*gard to this office.

  • Very trulj yours,
f~~,Cl If~

f Thomas J. Rausch Nuclear Licensing Administrator cc:

Directorate of Inspe~tion and Enforcement - Region III Region III Inspector - Dresden Region III Inspettor - Quad Cities Region III Inspector - Zion Region I I I In s.p ec tor - La Sa 11 e 2074N

Item l Eguipment Limit.Switch Namco type E740 Terminal Block Marathon Conduit-Seals 0-Z Gedney Pressure Transmitters Rosemount l 153D Foxboro N-ElO Diesel Generator Cooper Energy Serv.ices Control Panel System Control Corp.

Control Panel Harlo Corp Heating and Ventilating Panels Johnson Controls Diesel Drives and DG Stewart and Stevenson Cable Simplex Flow Transmitter General Electric

. type GEMAC 551,

553 Pre'ssure Transmitter General Electric type GEMAC 551 ATTACHMENT A MSIV Item 2 System General Use

  • Electrical Equipment General Use Electrical Equipment (for use with*

Namco limit switches)

Various Standby DG Main Control Board Safeguard Sequencing and Remote Shutdown Panels HVAC Contro.l s Aux. Feedwater, EssentiaJ Service W:ater and Standby DG General Us.e Electrical Equipment Core Spray RHR Core Spray RHR Item 3 Test Location and*Schedule*

Wyle-Norco October 1981 Wyle-Huntsvil le 2nd quarter, 1981 Wyle-Huntsville 2nd quarter, 1981 Wyle-Huntsville lst quarter, 1981 completed (phase l) 4th quarter, 1981 (phase 2)

Wyle-Huntsville 4th quarter, 1981 Acton -

lst quarter, 1981 Wyle Acton -

3rd quarter, 1982 So.uthwest Rese:arch 2nd quarter, 1981

  • out for Bids. to Test

. Test Labs II II*

May 28, 1981 Item 4 Plant

  • LaSalle County Zion Zion Zion Byron/Braidwood Byron/Braidwood Byron/Braidwood Byron/Braidwood Byron/Braidwood, Dresden 1,. LaSa 1 le County Dre.sden 2/3, Quad Cities Quad Cities Quad Cities

~-. Item l Item 2 Item 3

. Item 4 Equipment System Test Location Plant

  • and*Schedule*

Cable General Use Out for Bids to Dresden 2/3, General Electric Electric Equipment Test Labs Quad Cities Motor Core Spray II Quad Cities General Electric RHR.

Pressure Switch RHR II Quad Cities Mercoi.d GN-L-3 Battery HPCI 4th quarter, 1981 Dresden 1 Gould Control Panel Control and lst quarter, 1982 Dresden Systems Control Logic Panel Motor Control Center HPCI '

Dresden Cutler Hammer RPS