ML17251A986
| ML17251A986 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 02/29/1988 |
| From: | Mcnamara A, Snow B ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC |
| References | |
| NUDOCS 8803210455 | |
| Download: ML17251A986 (15) | |
Text
ACCELERKTED DISIOBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESS10N NBR:8803210455 DOC.DATE: 88/02/29 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear.Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION MCNAMARA,A.E.
Rochester Gas
& Electric Corp.
SNOW,B.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFXLIATXON
SUBJECT:
Monthly operating rept for Feb 1988.W/880311 ltr.
DISTRIBUTXON CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 LA STAHLE,C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB11E NRR/PMAS/ILRB12 RGNl COPIES LTTR ENCL 1
0 1
0 1
1 2
2 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB11B NRR/DREP/RPB10A E
01 COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
EXTERNAL: EG&G GROH,M NRC PDR 1
1 LPDR 1
1 NSIC 1
1 1
1
'A
'TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19 T
88832 8
I
~ OPERATING STATUS
~ fl 8, ~
OPERATING DATA REPORT DOCKET NO.
DATE March 11 1988 COMPLETED BY Andrew E. McNamara TF LF.PHONF 315-524-4446 x-301 Ginna Station I ~ Unit Name:
R.E. 6INNA NUCLEAR POWER PULNT Notes
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Elecuical Rating (Net MWe):
- 6. hfaximum Dependable Capacity (Gross MWe)t
- 7. hfaximum Dependable Capacity (Net MWe):
47 490 470 The unit was shutdown on February 5th for the Annual AX&0 and remained shutdown at month's end.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons.'.
Power Level to Which Restricted, If Any (Net MWc):
- 10. Reasons For Restrictions, lf Any:
This Month Yr.-to-Date Cumulat tvc 696.00 858.9 114.25 125 990 16.42K 59.60K 54.63K ll. Hours In Reporting Period 1 440.00
- 12. Number of Hours Reactor Was Critical 114.9
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 858.25
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (hfWlf) w~ ~2l2la
- 18. Nct Flcctrical Energy Generated (MWH) 369 739
- 19. Unit Service Factor 59.60K
- 20. Unit AvailabilityFactor 16.42K
- 21. Unit Capacity Factor (Using MDC Net) 12.11K d
'23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
160 080.
122 536.63 172 083 453 53 581 023 76.55K 76.55K 72.67K
- 25. IfShut Down At End Of Rcport. Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
- Cummulative total commencing January 1,
1975 8803210455 880229 PDR ADOCK 05000244 R
DCD Forecast Achieved
@4'tv.
4/85 49-88
'I
II l
Ce'I "I
I 4
e e
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE March ll 1988 COMPLETED BY Andrew E.
McNamara MONTH Februar 1988 TELEPHONE 1
315 524-4446 Ext.
301 at, Ginna DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
366 17
~
2 ~
3 ~
4 ~
5 ~
6.
7 ~
8.
9 ~
10.
364 358 353 276*
18.
19.
20 ~
21 ~
22
'3
'4
'5.
26.
27.
12.
28
'3.
29.
14'0.
15.
16.
- Online Net Daily Generator Run Hours:
18.25 INSTRUCTIONS 31 ~
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l ~
I f ~
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH FEBRUARY 1988 DOCKI'.T NO.
~0-244 liN11.NAME R.E. GINNA NUCLEAR POWER PLANT.
DA1'E 1 88 COMP LI'.1 ED BY Andrew E.
Mc amara 1'ELEPllONE
-4446 x-301 Ginna Station No.
Date 00 0
~
0n-e4 00 00 0
0 v0 0
0 n 0 0n Licensee Event Report if Ew 0
0 0
cA Q 00' 0
lJ E IU U
Cause gi Correct>ve Action to Prevent Recurrence The unit was shutdown on February 5th for Annual Refueling and Maintenance.
It remained shutdown at the end of the report period.
F: Forced S:
Scheduled REV. 4/85 4949 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)
H-Ocher (Explain) hie thod:
I-hianual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE March ll 1988 COMPLETED BY Andrew E.
cNamara TELEPHONE 1
315 524-4446 EXT. 301 at Ginna MONTH Februar 1988 The unit was shutdown on February 5, 1988 for Annual Refueling and Mai.ntenance and remained shutdown at the end of the report peri.od.
0
~
1 t
GINNA STATION MAINTENANCE REPORT
SUMMARY
FE BRUARYg 1 9 8 8 During the month of February, routine maintenance and inspections were completed.
Major safety related work included:
a ~
Motor's P.M. Inspection Overhaul; 1-C Charging Pump 1-A Containment Spray Pump 1-B Containment Spray Pump 1-A Safety Injection Pump 1-B Safety Injection Pump 1-A Reactor Cooling Fan 1-B Reactor Cooling Fan 1-A Containment Recirc Fan 1-B Containment Recirc Fan 1-C Containment Recirc Fan 1-D Containment Recirc Fan Control Room Charcoal Recirc Fan Control Room Exhaust Fan Control Room Supply Fan b.
c ~
d.
Pump's P.M. Inspection Overhaul; 1-A Reactor Coolant Pump Seal Inspection 1-A Charging Pump Minor Maintenance and Lubrication 1-B Charging Pump Minor Maintenance and Lubrication 1-C Charging Pump Major Vari Drive Overhaul and Lubrication 1-A Containment Spray Pump Minor Inspection and Lubrication 1-B Containment Spray Pump Minor Inspection and Lubrication 1-B Boric Acid Transfer Pump Major Inspection 1-A Boric Acid Transfer Pump Major Inspection 1-A S.I.
Pump Mechanical Seals Replace and Lubrication 1-B S.I.
Pump Minor Inspection and Lubrication 1-C S.I.
Pump Minor Inspection and Lubrication 1-A Component Cooling Pump Minor Inspection and Lubrication 1-B Component Cooling Pump Minor Inspection and Lubrication 1-A A.F.W.
Pump Minor Inspection and Lubrication 1-B A.F.W.
Pump Minor Inspection and Lubrication Turbine Driven A.F.W.
Pump Minor Inspection and Lubrication Miscellaneous Equipment and Projects; 1-A Rod Drive M/G Set Minor Inspection and Lubrication 1-B Rod Drive M/G Set Minor Inspection and Lubrication 1-A E D/G Annual Inspection Including Aux. Equipment 1-B E D/G Annual Inspection Including Aux. Equipment 1-C S.A.F.W. Cooler Heat Exchanger Repair 30 Valve Motor Operators were tested and Maintenance/Lubri-cation performed as required via our MOVATS Program Equipment and Personnel Air Locks Inspection Repacked Miscellaneous Safety Related Valves Replaced Diaphragms on Safety Related Grinnel Valve per P.M. Schedule
l l,
e.
Safety Relai Valves Maintained and/o0iested; RV-434 RV-435 RV-203 RV-209 All Eight Gasket I A & B MSI V-431-B V-431-C V-827A V-827B V-1816A V-4627 V-4628 V-4641 V-4642 V-890A V-890B l-A, 1-B, (3) and CV-743 HCV-104 MOV-826C AOV-294 AOV-310 AOV-362 AOV-427 AOV-5738 AOV-508 Main Steam Safety had New Flange Studs and nstalled and Tested Vs were Inspected and Repaired and Turbine Driven A.F.W.
Pump Replace Strainer Isolation Valves (6)
Tech Spec Snubbers Tested, Rebuilt During 1988 Outage; MECHANICAL SNUBBERS
, *FWU-39
- FWU-15
- AFW-101
- FWU-40
- FWU-32
- FWU-47
- CCU 43
- RHU-30
- SIU-3
+AFU-3
+RHU-75
- RHU-92
- Scheduled P.M.
Functionally Functionally Functionally Functionally Functionally Functionally Functionally Functionally Functionally Functionally Functionally Functionally Tested Tested Tested Tested Tested Tested Tested Tested Tested Tested Tested Changed Out Tested Changed Out
~
~
f II L
~) 1 u
<<+l
HYDRAULIC-SNUBBERS
- AFW-27
- N615/H8
- PS10 N607/H1 N608/H5 AFW-31 PS-4 PS-2 PS-9 N616/H7 N605/H2 N604/H3 N602/H4 Functionally Tested Functionally Tested - Rebuilt Functionally Tested Functionally Tested Rebuilt Functionally Tested - Rebuilt Functionally Tested Repaired Functionally Tested Functionally Tested Functionally Tested Functionally Tested Repaired Functionally Tested - Rebuilt Functionally Tested Rebuilt Functionally Tested - Rebuilt STEAM GENERATOR SNUBBERS
- SGB-6
- SGB-7
- SGB-8
+Scheduled P.M.
Rebuilt Rebuilt Rebuilt go h.
Fan's P.M. Inspection/Lubrication 1-A Reactor Cooling Fan 1-B Reactor Cooling Fan 1-A Containment. Recirc Fan 1-B Containment Recirc Fan 1-C Containment Recirc Fan 1-D Containment Recirc Fan Charcoal Filter Replacement Spent Fuel Pit Bank Charging Pump Exhaust Bank G-Fan Bank Primary Filter Replacement Control Room Charcoal Recirc Fan Control Room Exhaust Fan Control Room Supply Fan Spent Fuel Pit Spent Fuel Pit Skimmer Reactor Coolant Boric Acid Seal Injection Seal Return Ion Exchange
PIE' g(/////zap'imzm IIIII /lit //u///l/
I
/;,
TORK S,VAN0 Iu.JJ/JJJ lrsuiiz~
ZZ, ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649.0001 TCCKPHONC AREA coDK 7l5 546-2700 GINNA STATION March ll, 1988 Director, Office of Management Information and Program Analysis U.S.
NUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for February, 1988 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1988.
Very truly yours, Bruce A. Snow BAS/eeh Attachments cc:
Mr. William T. Russell NRC (1)