EOP:

FR-H.3

RESPONSE

TO STEAM GENERATOR HIGH LEVEL REV:

3 PAGE 1 of 7 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE 5 IL'"4~

P T SUPERINTENDENT EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

9307080223 930628 PDR ADQCK 05000244

'~P PDR

EOP:

FR-H.3 TITLE:

RESPONSE

TO STEAM GENERATOR HIGH LEVEL REV:

3 PAGE 2 of 7 A.

PURPOSE This procedure provides actions to respond to a S/G high level condition and to address the S/G overfill concern.

B.

ENTRY CONDITIONS/SYMPTOMS l.

ENTRY CONDITIONS This procedure is entered from:

a.

'F-0.3, HEAT SINK Critical Safety Function Status Tree on a YELLOW condition, and FR H 2 g

RESPONSE

TO STEAM GENERATOR OVERPRESSURE g

if the affected S/G narrow range level is high.

I 0

EOP:

FR-H.3 T1TLE:

RESPONSE

TO STEAM GENERATOR HIGH LEVEL REV:

3 PAGE 3 of 7 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION o

IF S/G NARROW RANGE LEVEL HAS INCREASED TO GREATER THAN 90%

[85% ADVERSE CNMT), THEN AN EVALUATION SHOULD BE MADE FOR S/G OVERFILL CONSIDERATIONS.

STEAM SHOULD NOT BE RELEASED FROM ANY S/G WITH LEVEL GREATER THAN 90$

[85%

ADVERSE CNMT] PRIOR TO OVERFILL EVALUATION.

IF S/G OVERFILL IS EXPECTED AN ATTEMPT SHOULD BE MADE TO DISPATCH PERSONNEL TO PIN MAIN STEAMLINES.

NOTE:

o Throughout this procedure, "affected" refers to any S/G in which narrow range level is greater than 67%.

o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+

R/hr.

1 Check Affected S/G(s)

Narrow Range Level GREATER THAN 674 IF less than 67% in all S/Gs, THEN return'o procedure and step in effect.

2 Verify FW Isolation To Affected S/G(s):

a.

MFW pumps

- TRIPPED b.

MFW flow control valve(s)

CLOSED

,a. Trip MFW pumps.

b. Manually close valves.

~ MFW regulating valve(s)

~ MFW bypass valve(s)

c. Verify both S/G pressures GREATER THAN CONDENSATE HEADER PRESSURE c.

Stop any running condensate pumps.

0

~

EOP:

FR-H.3

RESPONSE

TO STEAM GENERATOR HIGH LEVEL REV' PAGE 4 of 7 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 3 Close AFW And SAFW Flow Control Valves To Affected S/G (s):

o S/G A

~ MOV-4007 and AOV-4480, MDAFW pump

~ AOV-4297, TDAFW pump

~ MOV-9701A, SAFW pump o

S/G B

~ MOV-4008 and AOV-4481, MDAFW pump

~ AOV-4298, TDAFW pump

~ MOV-9701B, SAFW pump Stop pumps feeding affected S/G(s).

0

EOP:

FR-H.3

RESPONSE

TO STEAN GENERATOR HIGH LEVEL REV:

3 PAGE 5 of 7 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 4 Check Affected S/G(s)

Level:

a.

Narrow range level

- LESS THAN 90%

[85% adverse CNMT]

b. Narrow range level - DECREASING a.

Go to Step 5.

b. IF affected S/G level continues to increase, THEN perform the following:
1) Dispatch AO to locally isolate affected S/G:

o For S/G A, close MFW regulating and bypass valve outlet isolation

valves, V-3987 and V-3991

-OR-o For S/G B, close MFW regulating and bypass valve outlet isolation

valves, V-3986 and V-3990
c. Control AFW flow to maintain narrow range level between 17%

[25% adverse CNMT] and 39%

d. Return to procedure and step in effect 2)

Go to Step 5.

EOP:

FR-H.3 RESP9NSE TO STEAM GENERATOR HIGH LEVEL REV:

3 PAGE 6 of 7 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 5 Adjust Affected S/G(s)

ARV Setpoint To 1050 PSIG 6 Close Affected S/G TDAFW Pump Steam Supply Valve And Place In PULL STOP

~ S/G A, MOV-3505A

~ S/G B, MOV-3504A 7 Close Affected S/G(s)

MSIV And Bypass Valves 8

Check Affected S/G(s)

Radiation Levels - NORMAL

~ S/G blowdown, R-19

~ S/G A, R-31

~ S/G B, R-32 IF an E-3 or ECA-3 series procedure is in effect, THEN return to procedure and step in effect.

IF

NOT, THEN go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 1.

9 Establish Blowdown From Affected S/G(s):

a. Reset SI and CI
b. Reset XY relays for affected S/G blowdown valves
c. Place blowdown key switch for affected S/G to defeat
d. Verify S/G blowdown valves OPEN
e. Dispatch AO to establish blowdown to condenser or flash
tank, as desired (Refer to T-14F, STEAM GENERATOR BLOWDOWN SYSTEM STARTUP)

EOP:

FR-H.3

RESPONSE

TO STEAM GENERATOR HIGH LEVEL REV:

3 PAGE 7 of 7 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 10 Return To Procedure And Step In Effect

-END-