REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8006090326 DOC ~ DATE: 80/06/02 NOTARIZED:

NO DOCKET FACIL:50 244 Robert Emmet Ginna Nuclear Planti Unit ii Rochester G

05000244 AUTH'AME AUTHOR AFFILIATION HHITEiL ~ DE Rochester Gas L Electric Corp.

REC IP ~ NAME RECIPIENT AFFILIATION Office of Nuclear Reactor Regulation CRUTCHF IELD e D e Operating Reactors Branch 5

SUBJECT:

Submits verification of compliance w/short term Lessons Learned Task. Force requirements re RCS venting. Provisions made for venting reactor vessel head 8 pressurizer 8 for sweeping noncondensible gases from steam generator U tubes.,

DISTRIBUTION CODE:

A042S COPIES RECEIVED:LTR ENCL ~

SIZE; TITLE: Resp to Lesson Lear n Task For ce Comb Eng 8

50 267 NOTES: ~

C-X 'WPq~~~O. a~~i~~

~ew&eeOeWeOeOe RECIPIENT ID CODE/NAME ACTION:

08 BC OA.8~~

INTERNAL: 01 05 zCr 07 CATALINAi G, 18 CORE PERF BR 20 REAC SFTY BR 22 EEB IMBROtG ~

TEI FORDgJ AT ~

EXTERNAL: 03 LPDR 24 ACRS COPIES LTTR ENCL 1

16 1

RECIPIENT ID CODE/NAME 02 NRC PDR 06 ANDERSONiC ~

15 I LE 19 ENG BR 21 PLANT SYS BR 23 EFLT TRT SYS OELD 04 NSIC COPIES LTTR ENCL JLIN 1p lSCC tf~

TOTAL NUMBER OF COPIES REQUIRED'TTR ~

ENCL

'll t1 kl

)

p'2 ))

~ y,zrusvu r rIrIIz r'isjgjzi rnzziiviz ROCHESTER GAS AND ELECTRIC CORPORATION J'

er ~

Lazar OeII*hll

.II

'gy roar'.

I O'IAIC o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR.

VICE PRESIDENT TELEPHONE AREA COOE yld 546.2700 June 2,

1980 Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Projects Branch 55 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Short Term Iessons

Learned, Reactor Coolant System Venting R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

Item 2.1.9 of the Short Term Iessons Learned required that a reactor coolant system high point vent system be installed on all reactors.

Specific requirements for the system were detailed in Harold Denton's letter of October 30, 1979.

RG8E supplied details of the system the company planned to install on December 28, 1979 and requested approval from the NRC of those plans.

In a letter dated February 29, 1980 Dennis Ziemann stated that our proposal appeared to fulfillthe requirements and found the system acceptable provided that we verified that the system satisfied certain re-quirements.

The purpose of this letter is to verify compliance with the requirements and to confirm conversations we have had with the NRC staff in the intervening period.

Eleven design considerations for PWR's were established in the October 30, 1979 letter.

We comply with the design require-ments as follows:

Provisions have been made for venting the reactor vessel head and the pressurizer and for sweeping non-condensible gasses from the steam generator U-tubes.

The reactor vessel head vent system (RVHVS) is capable of venting the reactor head, the entire lengths of the hot legs and the cold legs.

The cold legs communicate with the head region through small openings. designed to distribute cold leg water to the upper portion of the vessel.

Gases can be swept from the steam generator tubes by starting a reactor coolant pump(s) for brief periods'of time.

'Specific procedures will be im-plemented by January,1, 1981.

The pressurizer is vented through the PORV'e which are normally operated

I

,I I'I, I'

ROCHESTER GAS ANP ELECTRIC CORP.

pATE June 2,

1980 To Mr. Dennis M. Crutchfield SHEET NO.

2 by a nonseismic air system.

In the event of loss of instrument air, or on containment isolation which results in isolation of the air system, a seismically qualified nitrogen system is used for motive power.

Additional information was supplied in our December 28, 1979 letter.

2.

The RVHVS has been sized to relieve a quantity of gas equal to at least one-half the reactor coolant system volume in one hour.

3.

The RVHVS pipes have been orificed to a size smaller than that corresponding to the definition of a LOCA.

In addition, even'though two charging pumps could make up the loss from an open vent, two vent valves in series have been provided in each of the two vent lines to provide a redundant means of stopping flow.

The position of each of the four RVHVS vent valves is indicated in the control room.

5.

6.

7.

The RVHVS-is remotely operable from the control room.

The RVHVS is seismically qualified.

As a minimum, the RVHVS meets the same qualifications which were accepted for the reactor protection system when the plant was licensed.

Except for some piping analysis which is done to ANSI B 31.1 criteria, the RVHVS meets current. day safety grade standards.

Re-dundant series valves have been provided on both vent paths.

Each vent path is powered from separate emergency busses.

8.

9.

10.

No block valves are required because of the restrictions in the vent paths.

Nevertheless, redundant qualified series valves are provided in each vent path.

The probability of an inadvertent opening of a vent has been reduced by providing two series valves, both normally closed, in each vent path.

Power will also be removed from the fail-closed solenoid valves during power operation.

The RVHVS piping discharges into the refueling cavity, an open area of the containment which will provide for good mixing and cooling of the vented gas.

The inadvertent opening of a vent path has been reduced in probability as discussed in 9 above.

Leakage detection is provided in accordance with Technical Specification

ROCHESTER GAS AND ELECTRiC CORP.

DATE June 2,

1980 To Mr. Dennis M. Crutchfield SHEET NO.

3 3.1.5.

In addition, redundant sump level instruments have been installed in the normal containment sump and will be operational by January 1, 1981.

Dennis Ziemann's February 29 letter also requested. results of analyses for (1) loss of coolant accidents initiated by a break in the vent pipe and (2) venting noncondensible gases with perhaps high hydrogen content into containment.

Discussions with the staff have indicated that. the LOCA analysis concern is that.

the analyses be performed using methodology which meets Appendix K to 10 CFR Part 50 requirements.

Westinghouse has performed numerous small break LOCA analyses and documented the results in WCAP 9600.

The sizes of the breaks analyzed ranged from less than 3/8 inch equivalent diameter to greater than 2 inches equivalent diameter and enveloped the break size which would result from guillotine rupture of the 3/4 inch pipe to which the RVHVS vent. valves are attached.

The models used in these

analyses, and referenced in Section 1.0, of WCAP
9600, are the Westinghouse small break models which meet the requirements of Appendix K.

They are described in WCAP 8261, Revision 1, "WFLASH A FORTRAN-IV Computer Program for Simu-lation of Transients in a Multi-Loop PWR" and WCAP 8970, "Westinghouse Emergency Core Cooling System Small'Break October 1975 Model".

We realize that the staff may ask for refinements to these models in the future but revisions to the models may take place during an extended period of development and review.

The current models remain appropriate for these analyses.

Analysis assumptions which were used are also in conformance with Appendix K criteria as described in Section 3.1 of WCAP 9600.

Mr. Chris Nelson of the NRC staff discussed these models and assumptions with Paul Wilkens of RGSE and it was agreed that they were acceptable.

Results of the WCAP 9600 analyses show that a 3/4 inch cold leg break is more severe than a hot leg break, a break which would be similar to a

RVHVS break.

Breaks less than 1 inch diameter will result in stable reactor coolant system pressures above the steam generator safety valve pressure for removal of decay heat.

Further, the core will remain covered.

Therefore, conditions which result from a break in the RVHVS will meet. the LOCA acceptance criteria of 10 CFR 50.46.

The hydrogen concentration in containment can be adequately controlled when venting noncondensible gases with potentially high hydrogen concentrations.

The RVHVS has been orificed so that even if the vented gas is pure hydrogen the containment hydrogen concentration will increase by no more than 0.4% per minute.

The venting process will require direct operator action and will be closely controlled.

No controls have been installed with the RVHVS to automatically initiate venting.

Administrative

r 0

0 I

ROCHESTER GAS AND ELECTRIC CORP.

DATE June 2,

1980 To Nr. Dennis N. Crutchfield SHEET NO.

controls to limit the venting period time will be established to assure that the hydrogen concentration in containment is main-tained at acceptable levels.

Sampling procedures have been implemented to determine containment hydrogen concentrations under accident conditions.

Containment. hydrogen monitors will also be installed by January 1,

1981 to give a continuous indica-tion of containment hydrogen concentration in the control room.

Therefore, administrative controls will be effective in limiting the hydrogen concentrations in containment and no further analyses are required.

This letter is intended to demonstrate compliance with all the requirements of Short Term Lessons Learned item 2.1.9, Reactor Coolant System Venting. If any question remains unanswered please contact, us as soon as possible.

Sincerely yours, L.D. White, Jr.