Responds to NRC Re Deviation Noted in IE Insp Rept 50-244/80-04.Corrective Actions:New Training Effort to Cover Emergency Procedure Was Undertaken
ML17250A313
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/01/1980
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17250A312 List:
References
NUDOCS 8006050429
Download: ML17250A313 (4)


Text

. <pj's'rz p~'>>'(i~a";iv

,7~/~ El/(~>VS(,'iiGil~V I i7777JJ7J777 ÃliflKN ROCHESTER GAS AND ELECTRIC CORPORATION Lanai 0'\\< ~ 4Kb g

~

89 EAST AYEMUE, ROCHESTER, N.Y. I4649 LEON O. WHITE. JR VICE PRESIDENT TELEPHONE AREA COOE Tie 546.2700 May 1, 1980 Mr. Eldon J. Brunner, Chief

'eactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Commission Region I 631 Park Avenue.

King of Prussia, Pennsylvania 19406

Subject:

IE Inspection No. 50-244/80-04 R. E. Ginna Nuclear Power Plant, Unit $ 1 Docket No. 50-244

Dear Mr. Brunner:

This letter is in response to your April 11, 1980 letter received April 16, 1980 concerning the inspection conducted at Ginna Station March 3-7, 1980 by Mr. Johnson of your office.

Your letter stated that it appeared that one of our activities was not conducted in full compliance with NRC requirements, as quoted below.

This letter contains information in response to this item.

"In response to NUREG-0578, Section 2.1.9 'Analysis of Design and Off-Normal Transients and Accidents'our letter to the Director of Nuclear Reactor Regulations dated October 17, 1979 stated 'We willdevelop plant specific procedures and train personnel on the new procedures'.

It is intended that the guidelines provided by October 31, 1979 willbe incorpo-rated into plant procedures and training accomplished by the required date of January 1, 1980.

Coritrary to the above, review of records and personnel interviews conducted on March 4-6, 1980 revealed that out of a total of 37 licensed operators, 14 had not attended the prescribed training sessions and 4 others had only partially attended. "

RESPONSE

To insure that the required training was provided to each licensed individual a new-training effort to cover emergency procedures E-1.1 through E-1.4 was undertaken.

This training was presented in the form of discussion and control room walk-through of the procedures.

Allhad participated in this by March 24, 1980 with the exception of one due to illness.

His train-ing was complete by April 24, 1980.

8006050 QZf

ROCHESTER'GAS AND ELECTRIC CORP.

oATE May 1, 1980 Mr. Eldon J. Brunner, Chief SHEET NO.

2 Documentation of completion of use of'elf-study material willbe improved by requiring a signed statement attesting to the completion of study be returned to the Training section by the individual.

The Station Superintendent has issued a letter to each licensed individual emphasizing the necessity of attending the Operator Requalifi-cation Program classroom lectures to maintain their license.

The inspection report contains no information that is considered proprietary.

Very truly yours, L. D. White, Jr.