Responds to V Stello 780125 Request for Evaluation of Asymmetric Loads Developed During LOCA & Schedule for Completion.Provides Status of Evaluation Program & Results of Analyses Completed
ML17249A595
Person / Time
Site: Ginna 
Issue date: 02/15/1980
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
TASK-03-08.D, TASK-3-8.D, TASK-RR NUDOCS 8002200449
Download: ML17249A595 (8)


Text

REGULATORY ORNATION DISTRIBUTION SY 9 (RIDS)

ACCESSION NBR:8002200449 DOC ~ DATE: 80/02/15 NOTARIZED:

NO f.SCIL:50 244 Robert Emmet Ginna Nuclear Plant~

Unit 1i Aochester G

STN 50 485 'Sterling Powei f'roject Aucleari Unit ii Rochester AUTH ~ AAHE AUTHOR AFFILlATION WAYl'E,LD, Rocfiester Cas" L Electric Corp,

'b.CIP ~ NAME REC1PIE'.NT AFFILIATION Of f >ce of Nuclear Aeactor Regulation ZIEHANNgD~ L ~

Operating Reactor s Branch 2

SUBJECT!

Responds to V Stel lo 780125 r equest for evaluation of assysmmetric loads deva*loped during LOCA L schedule for completion',Provides. status of evaluatiop progrem L *results of analyses"comple'ted, g

DISTRIBUTION CODE:

A030S COPIES RECEIVED:LTR ENCL SIZEe symmetr c

oca oa s

NOTES>

5 +'MC- ~ ~g% ~W+ CQ- > ~

Do 0

ACTION>>

INTERNAL>>

RECIPIENT Ib COOfiNA~E 05 BC 01 10 HOSf'URDAR S i3 i~8 l/

HEAC SFTY BR 19 EAGA 8R 21 HECH ENGR BR 33 ANALiYb 8R STS bAOUP LEADR 1i 1i 1

1

02. NRC PDR 12 l'ALBEDO i5 OELO ie CORE PERF BR 20 PLANT 878

&R 22 CONTMN'f SYS H"NAUE~eS ~

COPIES RECIPIENT l:7TH EN L

ID CobE/NAtlE COPIES LYDIA ENCL.

EXTERNAL 03 LPDR 24 ACR8 1

16 1

04 NSIC

~Wc~l 'RW~

0 t=

B gg)9 TOTAL NUVBER OF COPIES REaurRED; LTTR ~

ENCl.

f0 g g W ll ~ lt Iff ~ ~

fff

~

~4 o

~

(f

'e s

~

~ II 1

4g P

II

It ~//SEIZE'u1IZli5'a %0ela~I,

~ t uri>>

sz u~zzltis ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. 74649 LEON D. WHITE. JR.

VICE PRESIDENT TcocpHONK AREA COOK 7l6 546-2700 February 15, 1980 Director of Nuclear Reactor Regulation Attn:

Mr. Dennis L. Ziemann, Chief Operating Reactors Branch 42 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Ziemann:

Victor Stello's letter of January 25, 1978 requested that we evaluate asymmetric loads developed during a Loss of Coolant Accident (LOCA) and provide a schedule for completion of the evaluation.

A Westinghouse Owners'roup was formed to complete an evaluation of the type requested and developed a two year schedule for the program.

The purpose of this letter is to review the status of the evaluation program and to provide results of the analyses completed.

The evaluation program was divided into three phases, A, Bf and C.

Phase A included data acquisition from the Utilities, and review of structural and hydraulic parameters for potential grouping among generically similar plants.

Phases B and C separated the evaluations for breaks postulated outside the reactor cavity and inside the reactor cavity.

Phase B involved the actual structural assessments of plant groups and development of specific plant qualification programs as required for breaks outside the reactor cavity area.

Phase C included evaluation of breaks inside the reactor cavity annulus and verification of the structural integrity of the reactor vessel and supports, reactor internal structures, fuel, and ECCS piping attached to the reactor coolant system.

The integrity of the CRDM's and primary equipment supports which may be controlled by these vessel nozzle breaks is also considered in Phase C.

Concurrent with the Phase B and C work, mechanistic pipe break analyses were also undertaken to determine if large through-wall cracks in reactor coolant system piping would propagate to a large LOCA.

Results of this work have previously been submitted by Westinghouse (Westinghouse letter NS-TMA-2200 dated February 6,

1980) for the Owners Group in the form of WCAP 9558, Mechanistic Fracture Evaluation of Reactor Coolant Pipe Containing a Postulated Circumferential Through-Wall Crack.

This report and the NSAC/EPRI

v lf I

ROCHESTER GAS ANP ELECTRIC RP.

pATE February 15, 1980 To Mr. Dennis Ziemann, Chief SHEET NO.

Technical Memorandum submitted to the NRC on October 19, 1979 in a letter from John E. Ward (Chairman, AIF Committee on Reactor Licensing and Safety) to Harold R. Denton, have demonstrated by diverse and independent analyses and experimental results, that the probability of high energy line breaks in reactor piping

systems, both austenitic and ferritic, is extremely small.

The analyses specifically determined that very large cracks are required to initiate ductile fracture in nuclear piping under normal loadings; if ductile fracture does initiate due to a severe

overload, unstable crack extension is unlikely to occur; and the openings of through-wall cracks are small.

Therefore, the consequence of unanticipated, slow crack growth due to fatigue, corrosion fatigue, or stress corrosion cracking is likely to be relatively slow leakage.

These results support the conclusion that a double-ended guillotine break in a reactor system pipe'ithout any prior indication of substantial leakage is unrealistic and need 'not be considered as a basis for plant design or modification.

Nevertheless, Phase B and Phase C asymmetric loads analyses have been continued.

Results have been and will be submitted as described below.

Westinghouse Owners'roup report "Phase B5:

Subcompartment Asymmetric Pressure Loads" authored by D. S. Nixdorf was presented to the NRC Staff in February, 1979.

The remainder of the Phase B work covering steam generator and reactor coolant pump integrity and supports evaluation, is reported in WCAP 9628, Westinghouse Owners'roup Asymmetric LOCA Loads Evaluation Phase B, which was submitted February 6,

1980 by Westinghouse letter NS-TMA-2200 to Mr. Darrel Eisenhut.

Phase C results for verification of the structural integrity of the reactor vessel and supports and ECCS piping attached to the reactor coolant system are being submitted for the Owners Group under separate cover by Westinghouse letter NS-TMA-2206 to Mr. Darrel Eisenhut dated February 14, 1980.

In accordance with an agreement reached with the NRC Staff in

November, 1979 results of evaluations of reactor internal structures,
fuel, and control rod drive mechanisms will be provided by July, 1980.

In addition, the Westinghouse Owners'roup also analyzed two "representative" plants and presented the results to the NRC in a meeting on February 21, 1979.

The "representative" plant analyses used nominal existing plant configurations.

The specific plant analysis for R.

E. Ginna assumed a modified plant configuration, including for example, break limiting devices in the reactor cavity shield wall.

The above analysis results have been compiled because of the NRC staff's expressed desire to gain a better understanding of the asymmetric loads issue.

We continue to believe that the additional mechanistic break work which the Westinghouse Owners'roup undertook presents sufficient justification to eliminate double-ended guillotine breaks as a basis for plant design.

We

H l'1 n

~t

/

C.,

~

ROCHESTER GAS AND ELECTRIC RP.

DATE February 15, 1980 To Mr. Dennis Ziemann, Chief SHEET NO.

urge that review of the mechanistic break topical report, WCAP

9558, be continued and that its conclusions be adopted as a basis for the resolution of this issue.

We do not believe that backfitting the R.E.'inna plant will provide substantial, additional protection for the public health and safety.

To the contrary, modifications will impose additional costs upon our customers and additional radiation exposure upon those installing the modifications with no measurable benefit.

However, should the staff require under Section 50.109 of the Code of Federal Regulations, that the plant be modified to meet the analysis assumptions, despite the evidence presented in the mechanistic break report, the modifications could be installed during the second refueling outage after an agreement is reached on a full resolution of the asymmetric loads issue.

The NRC Staff has stated that asymmetric LOCA loads must be combined with seismic loads.

We feel that this position is not justified as demonstrated by the mechanistic break work. If the staff insists upon seismic and LOCA load combination, the design of modifications must be postponed until after completion of the Systematic Evaluation Program (SEP) seismic review and should be coordinated with potential SEP modifications.

Two refueling cycles are required to install the modifications because detailed measurements must be made of the reactor cavity shield wall/reactor coolant pipe annulus prior to fabrication of break limiting devices.

We agree with, and our analyses support as conservative, the NRC Staff assessment "that the probability of a pipe break resulting in substantial transient loads on the vessel support system or other structures is acceptably small" because

"(1) the break of primary concern must be very large, (2) it must occur at a specific

location, (3) the break must occur essentially instantaneously, and (4) the welds are currently subject to inservice inspection by volumetric and surface techniques in accordance with ASME Code Section XI" (Enclosure 1 to Victor Stello's January 25, 1978 letter to all PWR licenses).

Therefore, continued reactor operation is justified while this matter is being resolved.

Sincerely yours, L. D. Whi e, Jr.