Qaps 102-07551-MDD/MSC August 31 2017 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.55a Michael D. DiLorenzo Department Leader Nuclear Regulatory Affairs Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7605 Tel 623.393.6491 Reference 1: Arizona Public Service Company (APS) Letter Number 102-05831, Third Ten-Year Interval Inservice Inspection Program Update and Relief Request 38, dated March 14, 2008 [Agencywide Documents Access and Management System (ADAMS) Accession Number ML080920639]
Reference 2: APS Letter Number 102-06420, Revised Third 10 Year Interval Inservice Inspection Plans, dated October 4, 2011 (ADAMS Accession Number ML11287A014)
Subject:
Palo Verde Nuclear Generating Station Units 1, 2, and 3 Renewed License Nos. NPF-41, NPF-51, NPF-74 Docket Nos. STN 50-528/529/530 Third 10-Year Interval Inservice Inspection Program Update
Dear Sirs:
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50.55a(g)(5),
APS is required to update the Palo Verde Nuclear Generating Station (PVNGS) Inservice Inspection (ISI) program once every 120-months. APS submitted the third interval ISI programs for PVNGS Units 1, 2, and 3 in Reference 1, and subsequently submitted the revised programs in Reference 2. APS recently revised the PVNGS Units 1, 2, and 3 ISI program documents. These are being submitted pursuant to paragraph IWA-1400(c) of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and are enclosed for information.
The ISI program complies with the latest edition and addenda of the ASME Section XI Code incorporated by reference in 10 CFR 50.55a 12-months prior to the start of the interval per 10 CFR 50.55a(g)(4)(ii). The 2001 Edition with the 2003 Addenda of ASME Section XI is the Code that is used for the third 10-year ISI programs.
At PVNGS, each unit has a separate program that has been implemented prior to its first required examination of the third interval. Notable changes in this revision to each unit's program include the addition of approved Code Cases, additional inspection scope related to installed Fukushima modifications, revised sections to maintain consistency with the updated plant design basis, and various administrative clarifications. The changes have been reviewed, consistent with Code requirement IWA-2110, by the Authorized Nuclear Inservice Inspector (Hartford Steam Boiler, Global Inspection and Engineering Services) and considered satisfactory.
A member of the STARS Alliance LLC Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
102-07551-MDD/MSC ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Third 10-Year Interval Inservice Inspection Program Update Page 2 Enclosures 1, 2, and 3 contain the revised third interval 10-year ISI program for PVNGS Units 1, 2, and 3, respectively.
No new commitments are being made in this submittal.
If you have any questions about this submittal, please contact Matthew S. Cox at (623) 393-5753.
Sincerely,
-
MDD/MSC/maw : Third Inspection Interval, Inservice Inspection Program Summary Manual, PVNGS Unit 1, 3INT-ISI-1, Revision 5 : Third Inspection Interval, Inservice Inspection Program Summary Manual, PVNGS Unit 2, 3INT-ISI-2, Revision 6 : Third Inspection Interval, Inservice Inspection Program Summary Manual, PVNGS Unit 3, 3INT-ISI-3, Revision 4 cc:
K. M. Kennedy S. P. Lingam M. M. Watford O'Banion C. A. Peabody NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS