MONTHYEARML17265A1361997-12-23023 December 1997 Rev 2 to RCS Pressure & Temp Limits Rept (Ptlr). ML17264B1011997-08-29029 August 1997 Rev 0 to Leak-Before-Break Evaluation of Portions of RHR Sys at Re Ginna Nuclear Power Station. ML17264A8681997-04-23023 April 1997 Rev 0 to Evaluation of Ginna RCS Coolant Temp to Support LTOPs Requirements. ML17264A8511997-03-19019 March 1997 Rg&E Re Ginna Nuclear Power Plant Spent Fuel Pool Re-racking Licensing Rept. ML17264A7931997-01-31031 January 1997 Rev 1 to Final Rept, Re Ginna Nuclear Power Plant Probabilistic Safety Assessment. ML17264A6101996-09-23023 September 1996 Rev 0 to Design Analysis Operability Evaluation for 857 A/B/C Ginna Station. ML17264A6121996-09-23023 September 1996 Rev 2 to Design Analysis Ginna Station Pressure Locking Evaluation for MOVs 852 A&B. ML17309A6051996-09-13013 September 1996 Rev 2 to RCS Pressure & Temp Limits Rept (Ptlr). ML17264A6791996-05-24024 May 1996 Rev 1 to RCS Pressure & Temperature Limits Rept (Ptlr). ML17264A4001996-02-24024 February 1996 Rev 0 to RCS Pressure & Temp Limits Rept. ML17264A2791995-12-0808 December 1995 Re Ginna NPP RCS Pressure & Temp Limits Rept Cycle 25, Draft B ML17264A1051995-05-0404 May 1995 Rev 0 to Final Exam Rept for 1995 SG Eddy Current Insp at Ginna Nuclear Power Station, Dtd 950503 ML17263B0391995-04-18018 April 1995 Summary Exam Rept for 1995 SG Eddy Current Insp,Rev 0. ML17264A3411995-03-15015 March 1995 Low Temp Overpressure Analysis Summary Rept. ML17263A8351994-11-0707 November 1994 Rev 1 to Fission Product Barrier Evaluation. ML17263A8331994-10-11011 October 1994 Rev 1 to Re Ginna EALs Technical Bases. ML17263A8311994-09-26026 September 1994 Draft Rev C to Design Criteria Ginna Station Containment Structural Mods Wbs 4. ML17263A7941994-09-15015 September 1994 Safety Evaluation of Ginna SG Replacement. ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17263B0481994-06-30030 June 1994 Criticality Analysis of Plant Fresh & Spent Fuel Racks & Consolidated Rod Storage Canisters. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML17263A8291994-03-30030 March 1994 Draft Rev a to Safety Evaluation SEV-1019, Containment Structural Mods Wbs 4. ML17263A4651993-05-17017 May 1993 Radial Displacement & Rebar Strain Measurements for EWR #5181,Rev A. ML17262B1201992-11-30030 November 1992 Re Ginna Boric Acid Storage Tank Boron Concentration Reduction Study. ML17262B0831992-07-31031 July 1992 Recommended Info for Inclusion in Section 15.6.4 of FSAR for Re Ginna Nuclear Plant. ML17262A8391992-04-30030 April 1992 Rev 0 to Summary Exam Rept for 1992 SG Eddy Current Insp at Re Ginna Nuclear Power Station. ML17262A5601991-06-18018 June 1991 Rev 1 to Design Verification Ginna Station Containment Foundation Mat Analysis. ML17262A4691991-04-25025 April 1991 Rev 0 Summary Exam Rept for 1991 Steam Generator Eddy Current Insp. ML17262A4521991-04-22022 April 1991 Control Room Heatup Analysis. ML17262A3781991-02-28028 February 1991 Nonproprietary Re Ginna Low Temp Overpressure Protection Sys Setpoint Phase II Evaluation, Final Rept ML17262A4141991-02-26026 February 1991 Safety Analysis,Ginna Station Updated FSAR Section 6.2.4 & Tables 6.2-13,6.2-14 & 6.2-15 Changes. ML17262A3681991-02-15015 February 1991 Simulation Facility Certification Rept. ML17262A4431990-10-0404 October 1990 Rev 0 to Design Analysis Ginna Station Containment Mat Design Water Level Elevation 265 ft,0 Inches. ML17262A4401990-10-0404 October 1990 Rev 0 to Design Verification Ginna Station Containment Foundation Mat Analysis. ML17262A1931990-10-0303 October 1990 Rev 1 to Safety Analysis Ginna Station Updated FSAR Table 6.2-13 Changes. ML17262A1761990-08-30030 August 1990 Voltage Simulation for Case EOF LOC4 LOCA Simulation for 50/50 Mode - Circuit 767 Details 12B Transformer Feeding Bus 12B. ML17262A1771990-07-27027 July 1990 Rev 1 to Design Analysis EWR 4525-1, Fault Current Analysis of Power Distribution Sys. ML17262A1781990-07-24024 July 1990 Rev 1 to Design Analysis EWR 4525-2, Adequacy of Electric Sys Voltages. ML17250B1761990-05-0808 May 1990 Rev 1 Summary Exam Rept for 1990 Steam Generator Eddy Current Insp. ML17261B0201990-03-14014 March 1990 Design Criteria Ginna Station Steam Generator Containment Penetration. ML17251A4811989-02-28028 February 1989 Ultrasonic Indication Sizing Technique Development. Related Info Encl ML17251A4771988-06-17017 June 1988 Rev 0 to Differential Pressure Thrust Calculation Methodology. ML17261A6571987-10-31031 October 1987 Steam Generator Tube Plugging Increase Licensing Rept for Ginna Nuclear Power Station. ML17261A5521987-07-14014 July 1987 Supplemental Rept to Dcrdr Final Summary Rept for Re Ginna Station. ML17251A4741987-04-0101 April 1987 Rev 0 to Safety Analysis,Ginna Station PORV Block Valves. ML17251A4721987-03-10010 March 1987 Rev 0 to Design Criteria,Ginna Station PORV Block Valves Replacement. ML17251A9191986-12-18018 December 1986 Rev 0 to Implementation Rept EWR 2799, Reactor Vessel Level Monitoring Sys. ML17251A6171986-03-0101 March 1986 1986 Steam Generator Eddy Current Exam Summary Rept. ML17254A7031985-12-31031 December 1985 Vols 1 & 2 to Dcrdr Final Summary Rept Program Implementation,Re Ginna Nuclear Power Plant. ML17254A6911985-12-16016 December 1985 Reinforced Masonry Wall Evaluation,Evaluation of Control Bldg Reinforced Walls. 1997-08-29
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17265A7601999-10-0505 October 1999 Part 21 Rept Re W2 Switch Supplied by W Drawn from Stock, Did Not Operate Properly After Being Installed on 990409. Switch Returned to W on 990514 for Evaluation & Root Cause Analysis ML17265A7621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Re Ginna Npp.With 991008 Ltr ML17265A7531999-09-23023 September 1999 Part 21 Rept Re Corrective Action & Closeout of 10CFR21 Rept of Noncompliance Re Unacceptable Part for 30-4 Connector. Unacceptable Parts Removed from Stock & Scrapped ML17265A7541999-09-22022 September 1999 LER 99-011-00:on 990823,small Tears Were Discovered in Flexible Duct Work Connector at Inlet of CR HVAC Sys Return Air Fan (AKF08).Caused by in-leakage Greater than That Assumed.Implemented Temporary Mod 99-029.With 990922 Ltr ML17265A7471999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Re Ginna Npp.With 990909 Ltr ML17265A7431999-08-24024 August 1999 LER 99-004-01:on 990412,discovered That Containment Recirculation Fan Chevron Separator Vanes Were Installed Backwards.Caused by Improper Assembly by Mfg.Moisture Separator Vanes Were Dismantled & Correctly re-installed ML17265A7341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Re Ginna Npp.With 990806 Ltr ML17265A7291999-07-29029 July 1999 Interim Part 21 Rept Re safety-related DB-25 Breaker Mechanism Procured from W Did Not Pas Degradatin Checks When Drawn from Stock to Be Installed Into BUS15/03A.Holes Did Not line-up & Tripper Pan Bent ML17265A7181999-07-23023 July 1999 LER 99-007-01:on 990423,reactor Trip Occurred Due to Instrument & Control Technicians Inadvertently Pulling Fuses from Wrong Nuclear Instrument Channel.Setpoint Adjustments Were Completed by Different Crew of Technicians ML17265A7081999-07-22022 July 1999 LER 98-003-02:on 980904,actuations of CR Emergency Air Treatment Sys Was Noted Due to Invalid Causes.Caused by Various Degraded Components in CR RM Sys.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored ML17265A7131999-07-22022 July 1999 Special Rept:On 990407,radiation Monitor RM-14A Was Declared Inoperable.Caused by Failed Communication Link from TSC to Plant Process Computer Sys.Communication Link Was re-established & RM-14A Was Declaed Operable on 990521 ML17265A7031999-07-19019 July 1999 LER 99-S01-00:on 990617,determined That Temporary Unescorted Access Had Been Granted to Contractor Employee.Caused by Incomplete Info Re Circumstances of Individual Military Separation.Individual Access Was Revoked.With 990719 Ltr ML17265A7211999-07-19019 July 1999 ISI Rept for Third Interval (1990-1999) Third Period, Second Outage (1999) at Re Ginna Npp. ML17265A7021999-07-15015 July 1999 LER 99-010-00:on 990615,ventilation Isolation of Auxiliary Bldg Occurred When Auxiliary Bldg Gas Radiation Monitor R-14 Reached High Alarm Setpoint.Cr Operators Rest Auxiliary Bldg Ventilation Isolation Signal.With 990715 Ltr ML17265A7661999-06-30030 June 1999 1999 Rept of Facility Changes,Tests & Experiments Conducted Without Prior NRC Approval for Jan 1998 Through June 1999, Per 10CFR50.59.With 991020 Ltr ML17265A7011999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Re Ginna Npp.With 990712 Ltr ML17265A6851999-06-21021 June 1999 LER 99-001-01:on 990222,deficiencies in NSSS Vendor steam- Line Brake Mass & Energy Release Analysis Results in Plant Being Outside Design Bases Occurred.Caused by Deficiencies in W.Temporary Administrative Replaced.With 990621 Ltr ML17265A6761999-06-16016 June 1999 Part 21 Rept Re Defects & noncompliances,10CFR21(d)(3)(ii), Which Requires Written Notification to NRC on Identification of Defect or Failure to Comply. Relays Were Returned to Eaton for Evaluation & Root Cause Analysis ML17265A6661999-06-0202 June 1999 LER 99-009-00:on 990503,instrumentation Declared Inoperable in Multiple Channels Resulted in Condition Prohibited by Ts. Caused by Unanticipated High Frequency AC Voltage Ripple. Entered TS LCO 3.0.3.With 990602 Ltr ML17265A6681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Re Ginna Nuclear Power Plant.With 990608 Ltr ML17265A6651999-05-27027 May 1999 Interim Rept Re W2 Control Switch,Procured from W,Did Not Operate Satisfactorily When Drawn from Stock to Be Installed in Main Control Board for 1C2 Safety Injection Pump. Estimated That Evaluation Will Be Completed by 991001 ML17309A6541999-05-27027 May 1999 LER 99-008-00:on 990427,overtemperature Delta T Reactor Trip Occurred Due to Faulted Bistable During Calibr of Redundant Channel.Plant Was Stabilized in Mode 3 & Faulted Bistable Was Subsequently Replaced.With 990527 Ltr ML17265A6631999-05-24024 May 1999 LER 99-007-00:on 990423,technicians Inadvertently Pulled Fuses from Wrong Nuclear Instrument Cahnnel,Causing Reactor Trip,Due to High Range Flux Trip.Caused by Personnel Error. Labeling Scheme Improved ML17265A6601999-05-21021 May 1999 LER 99-006-00:on 990421,start of turbine-driven Auxiliary Feedwater Pump Was Noted.Caused by MOV Being Left in Open Position.Closed Manual Isolation Valve to Secure Steam to Pump.With 990521 Ltr ML17265A6591999-05-17017 May 1999 Part 21 Rept Re Relay Deficiency Detected During pre-installation Testing.Caused by Incorrectly Wired Relay Coil.Relays Were Returned to Eaton Corp for Investigation. Relays Were Repaired & Retested ML17265A6441999-05-13013 May 1999 LER 99-005-00:on 990413,undervoltage Signal of Safeguards Bus During Testing Resulted in Automatic Start of B Edg. Caused by Personnel Error.Blown Fuse Was Replaced & Offsite Power Was Restored to Safeguards Bus 17.With 990513 Ltr ML17265A6431999-05-12012 May 1999 LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installed ML17265A6381999-05-0707 May 1999 Part 21 Rept Re Replacement Turbocharger Exhaust Turbine Side Drain Port Not Functioning as Design Intended.Caused by Manufacturing Deficiency.Turbocharger Was Reaasembled & Reinstalled on B EDG ML17265A6391999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Re Ginna Nuclear Power Plant.With 990510 Ltr ML17265A6361999-04-23023 April 1999 Part 21 Rept Re Power Supply That Did Not Work Properly When Drawn from Stock & Installed in -25 Vdc Slot.Power Supply Will Be Sent to Vendor to Perform Failure Mode Assessment.Evaluation Will Be Completed by 991001 ML17265A6301999-04-18018 April 1999 Rev 1 to Cycle 28 COLR for Re Ginna Npp. ML17265A6251999-04-15015 April 1999 Special Rept:On 990309,halon Systems Were Removed from Svc & Fire Door F502 Was Blocked Open.Caused by Mods Being Made to CR Emergency Air Treatment Sys.Continuous Fire Watch Was Established with Backup Fire Suppression Equipment ML17265A6551999-04-0909 April 1999 Initial Part 21 Rept Re Mfg Deficiency in Replacement Turbocharger for B EDG Supplied by Coltec Industries. Deficiency Consisted of Missing Drain Port in Intermediate Casing.Required Oil Drain Port Machined Open ML17265A6291999-03-31031 March 1999 Rev 0 to Cycle 28 COLR for Re Ginna Npp. ML17265A6241999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ginna Station.With 990409 Ltr ML17265A6141999-03-31031 March 1999 LER 99-003-00:on 990301,two Main Steam non-return Check Valves Were Declared Inoperable Due to Exceedance of Acceptance Criteria.Caused by Changes in Methodology & Matls.Packing Gland Torque Will Be Adjusted.With 990331 Ltr ML17265A6131999-03-29029 March 1999 LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 Ltr ML17265A6061999-03-24024 March 1999 LER 99-001-00:on 990222,plant Was Noted Outside Design Basis.Caused by Deficiencies in NSSS Vendor Slb Mass & Energy Release.Placed Temporary Administrative Restriction 40 Degrees F Max on Screenhouse Bay Temp ML17265A5661999-03-0101 March 1999 Rev 26 to QA Program for Station Operation. ML17265A5961999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ginna Nuclear Power Plant.With 990310 Ltr ML17265A5371999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Re Ginna Nuclear Power Plant.With 990205 Ltr ML17265A5951998-12-31031 December 1998 Rg&E 1998 Annual Rept. ML17265A5001998-12-21021 December 1998 Rev 26 to QA Program for Station Operation. ML17265A4951998-12-21021 December 1998 LER 98-005-00:on 981120,loss of 34.5 Kv Offsite Power Circuit 751,resulted in Automatic Start of B Edg.Caused by Faulted Cable Splice.Performed Appropriate Actions of Abnormal Procedure AP-ELEC.1.With 981221 Ltr ML17265A4931998-12-17017 December 1998 LER 98-004-00:on 971030,determined That Improperly Performed Surveillance Resulted in Condition Prohibited by Ts.Caused by Procedure non-adherence.Appropriate Calibr Procedures Were Properly Performed with 24 H of Condition Discovery ML17265A4761998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Re Ginna Nuclear Power Plant.With 981210 Ltr ML17265A4691998-11-25025 November 1998 LER 98-003-01:on 980904,actuations of CR Emergency Air Treatment Systems (Creats) Occurred.Caused by Radon build-up During Temp Inversion.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored to CR ML17265A4531998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Re Ginna Nuclear Power Plant.With 981110 Ltr ML17265A4271998-10-0505 October 1998 LER 98-003-00:on 980904,actuations of CR Emergency Air Treatment Sys Occurred.Caused by Radon build-up During Temp Inversion.Air Samples Were Taken & Determined That Source of Radiation Was Naturally Occurring Radon.With 981005 Ltr ML17265A4291998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Re Ginna Nuclear Power Plant.With 981009 Ltr 1999-09-30
[Table view] |
Text
Attachment 1 60 Day Response to IE Bulletin No. 79-14 Seismic Analysis for As-Built. Safety Related Piping Systems R.E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244 Ginna Station Piping and Piping Analysis Drawing List Rochester Gas and Electric Corporation 89 East Avenue Rochester, N.Y. 14649 EWR 2512 Revision 1 August 31, 1979
~qfO Page i ~go<~
'E<;,
4',
CONTENTS Section Pacae 1.0 Pi in ualified b Ori inal Plant Desi Reactor Coolant System 1.2 Main Steam 1.3 Main Feedwater 1.4 Safety Injection 1.5 Residual Heat; Removal 1.6 Containment Spray 1.7 Chemical and Volume Control 1.8 Component Cooling 1.9 Service Water 1.10 Steam Generator Blowdown 10 1.11 Auxiliary Feedwater 1.12 Boric Acid 12 2.0 Pi in uglified b D amic Anal sis 2.1 Standby Auxiliary Feedwater 13 2.2 Chemical and Volume Control 2.3 Service Water 2.4 Steam Generator Blowdown 16 2.5 Auxiliary Feedwater 2.6 Boric Acid 18 2.7 RCS Overpressure Protection 19 2.8 Demineralized Water 20 2.9 Charcoal Filter Dousing 21 Page ii
REACTOR COOLANT SYSTEM Pi in 8 Instrumentation Drawin RGE 33013-424 Rev. D Pi in Drawin s GAI-D-304-601 Rev. VIII Plans & Sects.
GAI-D-304-602 Rev. VIII Press Relief S Spray Piping Plans GAI-D-304-603 Rev. IX Press Relief S Spray Piping Sections
MAIN STEAM SYSTEM Pi in & Instrumentation Drawin RGE 33013-534 Rev. 1 Pi in Drawin s-GAI-D-304-014 Rev. V Plan GAI-D-304-015 Rev. VII Plan & Sections GAI-D-304-016 Rev. VII Sections GAI-D-304-023 Rev. III Relief Valves
MAIN FEEDWATER Pi in & Instrumentation Drawin RGE 33013-544 Rev. 4 Pi in Drawin s GAI-D-304-083 Rev. Vill F.W. Pump Suet. & Disch. Plan GAI-D-304-084 Rev. V F.W. Pump Suet. & Disch. Sections
SAFETY INJECTION Pi in 8 Instrumentation Drawin RGE 33013-424 Rev. D RGE 33013-425 Rev. C RGE 33013-432 Rev. B Pi in Drawin s GAI-D-304-642 Rev VIII Plans Inside Cont.
GAI-D-304-643 Rev VII Sections Inside Cont.
GAI-D-304-644 Rev. XII Plans & Sects. (Aux Bldg)
RESIDUAL HEAT REMOVAL Pi in E Instrumentation Drawin RGE 33013-425 Rev. C RGE 33013-432 Rev. B RGE 33013-436 Rev. D Pi in Drawin s GAI-D-304-611 Rev. VI Plan (Inside Cont)
GAI-D-304-612 Rev. IV Sections (Inside Cont)
GA1-D-304-615 Rev. VIII Plan (Aux Bldg)
GAI-D-304-616 Rev. IZ Sections (Aux Bldg)
CONTAINMENT SPRAY Pi in 8 Instrumentation Drawin RGE 33013-425 Rev. C RGE 33013-432 Rev. B Pi in Drawin s GAI-D-304-641 Rev. VIII Plans S Sections in Containment GAI-D-304-642 Rev. VIII Plan In Containment GAI-D-304-643 Rev. VII Sections In Containment GAI-D-304-644 Rev. XII Plans and Sections, Aux. Bldg.
CHEMICAL AND VOLUME CONTROL Pi in 8 Instrumentation Drawin RGE 33013-426 Rev. 2 RGE 33013-427 Rev." B RGE 33013-428 Rev. 1 RGE 33013-433 Rev. D RGE 33013-434 Rev. 1 Pi in Drawin s GAI-D-304-630 Rev. V Plan S Sect. (Misc."in Cont.)
GAI-D-304-631 Rev. VIII Plan (Mics. in Cont.)
GAI-D-304-632 Rev. VI Sect. (Misc. in Cont.)
GAI-D-304-633 Rev. XI Seal Water 8 Charging Line Plan S Sect. (In Cont..)
\
COMPONENT COOLING Pi in 5 Instrumentation Drawin RGE 33013-435 Rev. B RGE 33013-436 Rev. D Pi in Drawin s GAI-D-304-618 Rev. X Clg. to RV Supports/RCP's GAI-D-304-619 Rev. IX Clg. to RV Supports/RCP's GAI-D-304-621 Rev. VIII Plans, Auz. Bldg. 235-8 GAI-D-304-622 Rev. VII Plans, Aux. Bldg. 253-0 GAI-D-304-623 Rev. III Plans, Auz. Bldg. 271-0 GAI-D-304-625 Rev. II To Sample Coolers
/.
('
I SERVICE WATER Pi in 8 Instrumentation Drawin RGE 33013-529 Rev. F Pi in Drawin s GAI-D-304-691 Rev VI Cooling to Cont Recirc Cooling Units Plan GAI-D-304-692 Rev III Cooling to Cont Recirc Cooling Units Sect.
GAI-D-304-693 Rev IX Plans (Int. Bldg.)
GAI-D-304-694 Rey IX Sections (Int. Bldg. )
GAI-D-304-695 Rev VIII Plans (Aux Bldg.)
GAI-D-304-696 Rev VII Sections (Aux. Bldg.)
GAI-D-304-697 Rev II Plan Above El. 253-8 S Sections Misc. (Aux Bldg.)
GAI-D-304-698 Rev IV Cooling Water to Air Recirc.
Motors Plan 6 Sect. (Cont.)
I
(
STEAM GENERATOR BLOWDOWN Pi in & Instrumentation Drawin GAI D-302-121 Rev. IX Pi in Drawin s GAI-D-302-121 Rev. XVI Plans, Containment GAI-D-381-050 Rev. 3 Piping Reroute, Int. Bldg.
10
AUXILIARY FEEDNATER Pi in 6 Instrumentation Drawin RGE 33013-544 Rev. 4 Pi in Drawin s GAI-D-304-085 Rev. Cond. To Pump Suctions GAI-D-304-086 Rev. Plans and Sections, Int. Bldg.
GAI-D-381-046 Rev. 4 New crossover, Int. Bldg.
11
BORIC ACID Pi in 8 Instrumentation Drawin RGE 33013-425 Rev. C RGE 33013-426 Rev. 2 Pi in Drawin s RGE-33013-627 Rev. 5 Plans and Sections, Aux. Bldg.
GAI-D-304-644 Rev. Plans and Sections, Aux. Bldg.
12
STANDBY AUZIZIARY FEEDWATER Pi in & Instrumentation Drawin GAI D-302-071 Rev. E Pi in Drawin s GAI-D-381-023 Rev. 1 Cond. Suction to Pump GAI-D-381-033 Rev. 4 Plans in Containment GAI-D-381-034 Rev. 2 Plans in Aux. Bldg. (253-0)
GAI-D-381-035 Rev. 3 Plans in Aux. Bldg. (271-0)
GAI-D-381-036 Rev. 4 Plans in Auz. Bldg. Add.
GAI-D-381-038 Rev. 0 Misc. Sections, Auz. Bldg. Add.
GAI-D-381-039 Rev. 2 Details, Auxl. Bldg. Add.
Anal sis Isometric Drawin s GAI-C-381-026 Rev. 1 Cond. Tk to Pump Suctions GAI-C-381-040 Rev. D Pen. 119 to SGA GAI-C-381-041 Rev. A Pen. 123 to SGB GAI-C-381-042-1 Rev. A Pen. 119 to Pump GAI-C-381-042-2 ,Rev. A Pen. 119 to Pump GAI-C-381-042-3 Rev. A Pen..119 to Pump GAI-C-381-042-4 Rev. A Pen. 119 to Pump GAI-C-381-042-5 Rev. A Pen. 119 to Pump GAI-C-381-043-1 Rev. A Pen. 123 to Pump GAI-C-381-043-2 Rev. A Pen. 123 to Pump GAI-C-381-043-3 Rev. A Pen. 123 to Pump GAI-C-381-043-4 Rev. A Pen. 123 to Pump GAI-C-381-043-5 Rev. A Pen. 123 to Pump 13
2.2 CHEMICAL AND VOLUME CONTROL Pi in & Instrumentation Drawin RGE 33013-426 Rev. 2 RGE 33013-427 Rev.. B RGE 33013-428 Rev. 1 RGE 33013-433 Rev. D RGE 33013-434 Rev. 1 Pi in Drawin s GAI-D-304-630 Rev. V Plan & Sect. (Misc. in Cont.)
GAI-D-304-631 Rev. VIII Plan (Mics. in Cont.)
GAI-D-304-632 Rev. VI Sect. (Misc. in Cont.)
GAI-D-304-633 Rev. XI Seal Water & Charging Line Plan & Sect. (In Cont.)
RGE 33013-708 Rev. 2 A RCP 51 Seal Bypass RGE 33013-709 Rev. 2 B RCP 51 Seal Bypass Anal sis Isometric Drawin s GAI-C-381-076 Rev. 0 From 10" AC to Pen 112 GAI-C-381-077 Rev. 0 Valves 200 A, B and 202 GAI-C-381-078 Rev. 0 Regen. Hx. to Isolation GAI-C-381-079 Rev. 0 8" R.C. Line to Isolation RGE SK447-201 Rev. 0 A RCP Seal Bypass RGE SK447-202 Rev. 0 B RCP Seal Bypass
2.3 SERVICE WATER Pi in 8 Instrumentation Drawin RGE 33013-529 Rev. F Pi in Drawin s GAI-D-304-691 Rev VI Cooling to Cont, Recirc Cooling Units Plan GAI-D-304-692 Rev III Cooling to Cont Recirc Cooling Units Sect.
GAI-D-304-693 Rev IX Plans (Int. Bldg.)
GAI-D-304-694 Rev IX Sections (Int. Bldg.)
GAI-D-304-695 Rev VIII Plans (Aux Bldg.)
GAI-D-304-696 ,Rev VII Sections (Aux. Bldg.)
GAI-D-304-697 Rev II Plan Above El. 253-8 6 Sections Nisc. (Aux Bldg.)
GAI-D-304-698 Rev IV Cooling Water to Air Recirc.
Notors Plan Sc Sect. (Cont.)
Anal sis Isometric Drawin s GAI-C-381-024-1 Rev. B SW suction to SAFW Pump A GAI-C-381-024-2 Rev. B SW suction to SAFW Pump A GAI-C-381-024-3 Rev. B SW suction to SAFW Pump A GAI-C-381-025-1 Rev. A SW suction to SAFw Pump B GAI-C-381-025-2 Rev. B SW suction to SAFW Pump B GAI-C-381-025-3 Rev. B SW suction to SAFW Pump B GAI-C-381-025-4 Rev. B SW suction to SAFW Pump B 15
2.4 - STEAM GENERATOR BLOWDOWN'i in S Instrumentation Drawin GAI D-302-121 Rev. IX Pi in Drawin s GAI-D-302-121 Rev. XVI Plans, Containment GAI-D-381-050 Rev. 3 Piping Reroute, Int. Bldg.
Anal sis Isometric Drawin s GAI-C-381-086 Rev. 1 Pen. 322 to Iso. Valve 16
2.5 AUXIjIARYFEEDWATER Pi. in S Instrumentation Drawin RGE 33013-544 Rev. 4 Pi in Drawin s GAI-D-304-085 Rev. Cond. To Pump Suctions GAI-D-304-086 Rev. Plans and Sections, Int. Bldg.
GAI-D-381-046 Rev. 4 New crossover, Int. Bldg.
Anal sis Isometric Drawin s GAI-D-381-044 Rev. D New crossover, Int. Bldg.
17
'i 2.6 BORIC ACID Pi in & Instrumentation Drawin RGE 33013-425 Rev. C RGE 33013-426 Rev. 2 Pi in Drawin s RGE-33013-627 Rev. 5 Plans and Sections, Aux. Bldg.
GAI-D-304-644 Rev. Plans and Sections, Aux. Bldg.
Anal sis Isometric Drawin RGE-33013-625 Rev. 0 B.A. Tanks to M.O.V's 18
2.7 RCS OVERPRESSURE PROTECTION Pi in S Instrumentation Drawin s Catalytic A-202 Rev. 0 RGE 21489-253 Rev. 1 Pi in Drawin s Catalytic A-13501 Rev. 3 Plan Catalytic A-13502 Rev. 3 Details Anal sis Isometric Drawin s Catalytic SK 725-501-00 Rev. 0 Catalytic SK 725-502-01 Rev. 1 Catalytic SK 725-502A-00 Rev. 0 Catalytic SK 725-506-01 Rev. 1 Catalytic SK 725-507-01 Rev. 2 Catalytic SK 725-505-02 Rev. 2
2.8 DEMINERAZIZED WATER Pi in S Instrumentation Drawin s RGE 03021-62 Rev. 2 Pi in Drawin s Catalytic A-13201 Rev. 2 Pen. 324 Anal sis Isometric Drawin s Catalytic SK 722-101-00 Rev. 0 Catalytic SK 722-102-00 Rev. 0 20
2.9 CHARCOAL FILTER DOUSING Pi in S Instrumentation Drawin s RGE 33013-432 Rev. B Pi in Drawin s Catalytic B-13210 Rev. 2 Anal sis Isometric Drawin s Catalytic SK 272-001-02 Rev. 2 Catalytic SK 272-002-02 Rev. 2 21
Attachment 2 60 Day Response to IE Bulletin No. 79-14 Seismic Analysis for As-Built Safety Related Piping Systems R.E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244 Methods Used for Inspection, Evaluation, and Nonconformance Control for Seismic Category I Piping Systems Inside Containment Introduction a) The inspection of piping systems inside containment was completed prior to the August 15, 1979 issuance of the Supplement IE Bulletin 79-14. This attachment describes the inspection and evaluation methods used at Ginna Station.
b) Different inspection and evaluation methods were used for piping which was originally qualified by equivalent static analyses and for piping which has been qualified by dynamic analysis. These are presented separately.
- 2. Reactor Coolant S stem and Cate or I Pi in 24 Inch Nominal Pi e Size and Lar er Seismicall uglified b E uivalent Static Anal ses 2.1 Methods a) Data and dimensions were obtained by field teams to prepare as-built piping and support drawings. The information obtained by field teams included pipe size and geometry; insulation thickness; valve locations, type and orienta-tion; support locations; and penetration clearances.
Detailed as-built. pipe support sketches were prepared noting support geometry, component, sizes and lengths, and weld sizes and, lengths.
b) The dimensions, data and the as-built sketches were com-pared to the original design drawing by engineers per-forming the evaluations. Field inspection by the engineers was also performed as necessary.
c) Discrepancies were compared to established acceptance criteria and appropriate action taken for discrepancies which did not meet the criteria. Discrepancies which could not be compared to the established criteria were handled on a case-by-case basis.
d) Discrepancies requiring action were handled in three ways.
For minor deficiencies in support construction which did not affect the function of the support, e.g. loose nuts, missing lock nuts, etc. main-tenance trouble cards were issued and repairs made.
- 2. For significant deficiencies, e.g., missing supports, immediate evaluation or repair was made during the outage controlled by nonconformance reports.
- 3. For other deficiencies which were judged by the engineer not to affect, operability, but requiring additional evaluation, the deficiency was noted and further evaluated after the outage. These are documented on nonconformance reports as appropriate'.
e) As-built piping and support drawings are being prepared.
2.2 Acceptance Criteria a) Pipe geometry, valve location and support location*
Pi e Size Tolerance to 6" 2 8" 8" to 18" 2 12" 20" to 36" 18"
- For supports, this tolerance may not be projected through or around fittings.
b) Angular Tolerance I
For linear type hangers or valve orientations, the acceptable deviation is 2 4'rom the as designed "
position.
c) Pipe Support Configuration When the as-built configuration of a support differs from the design drawing, e.g. a box guide replacing a U-bolt, a nonconformance is not recorded if the as-built support performs the same function and is built of equal or better materials than those required by the design drawing.
F Support Materials Material sizes listed on the design drawings are con-sidered as design minimums. Material size increases are acceptable except in the case of engineered components, i.e. springs, constant supports and snubbers. Where information plates are illegible or missing on standard components, i.e. snubbers, springs, constants, dimensions of the component are made. lf the physical dimensions agree with the catalog dimensions of the design drawing component, it is assumed the installed component is correct. No deviation is acceptable on standard com-ponents.
e) Pipe to Support Clearance The sum of the gaps on both sides of a pipe may deviate
+ 1/16" from design. For pipes having a temperature less than 120 F, a tight fit is permissible. For pipes of temperatures greater than 120'F, the sum may deviate 1/16" from design.
Any deviations which exceed the tolerances listed above are recorded.
Pi in S stems, or Portions of S stems, Seismicall uglified B D amic Anal sos a) Recent piping modifications and additions at, Ginna Station have in general been qualified by dynamic analysis. The control and authorization of changes to the installation drawings is significantly improved from original plant construction. For this reason, a general inspection of piping and pipe supports was performed since detailed inspections were recently performed.
A comparison of the installation drawings and as-built piping and supports was made.
c) A comparison between the original analysis isometric input data and the installation drawings was made and discrepancies noted.
Discrepancies were controlled in the same manner as described in item 2.1 c) above.
e) Drawing changes wil'l be made as required.
'I
/
/ (
I