OPERATING DATA REPORT DOCKET NO.

DATE Se tember 12 1979 COMPLETED BY S.

Andrew E. McNamara TELEPHONE 1-716-546-2700

~ OPERATING STATUS Ext. 291-205, at"Ginna

l. Unit Name: GINNA STATION The Unit Reactor Power
2. Reporting Period: Au ust 1979 Level averaged ~100% for

, . 3~ Licensed Thermal Power (hIWt): the majority of the month,

4. Nameplate Rating (Gross hfWe):

490 after start-up on 8/4.

Design Electrical Rating (Net MWe): One reactor trip followed 5~

6. hfaximum Dependable Capacity (Gross hfWe):

by a turbine trip occurred.

470

7. hlaximum Dependable Capacity (Net hlWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This hlonth Yr.-to-Date Cumulative 5 831 85 583 12 ~ Number of Hours Reactor Was Critical 663.73 52 '5 65 155 F 07 2 60 1 579.11

  • 13 ~ Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 654 3 878 63 456 '3 8 '
  • 15 ~ Unit Reserve Shutdown Hours 952 248 5 625 000 84 554 914
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 312 686 1 884 731 27,457,971
18. Net Electrical Energy Generated (MWH) 297 035 1 792 159 25,993,197 87 '0% 66 '% 74 '5%
19. Unit Service Factor 87 '% 66 '% 74 '6%
20. Unit Availability Factor 84 '4% 65 '9% 66,'.98%

21 ~ Unit Capacity Factor (Using MDC Net) 84 '4% 65 '9% 66 '8%

22. Unit Capacity Factor (Using,DMR Nct)
23. Unit Forced Outage Rate 1 ~ 54% 0 '6% 9.
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): 72'5.

If Shut Down At End Of Report. Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation): ~ Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMhlERCIAL OPERATION
  • Cumulative Data Commencing January 1, 1975 49.88 LREVe 1/16) q 909'19 $ (Q

I 4.

1 II 0

i I

"4a '~

'C

~ ~

ff 1

'P 4 I

e

(,

S

AVERAGE DAILY UNIT POWER UNIT DOCKET NO. ~0 244

¹I @irma Statio DATE September 12, 1979 COMPLETED BY Andrew E. McNamara TELEPHONE 1-716-546-2700 xt. 5, at Ginna August, 1979 hION TH DAY AVERAGE DAILYPOWER LEVEL DAYAVERAGE DAILY POWER LEVEL (M We-N et) (MWe-Net) 476 11 18 477'78 58.7 478 20 116 21 478 358 479 22 466 480 23 469 481 24 472 25 476 10 472 475 26 472 477 2t 477 477 12 28 13 478 29 476 477 30 473 478 31 471 16 476 INSTRUCTIONS On this format, list the average daily unit power level in hIWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

40 87 (REVo 1/78i

0 P

1 1 P

~ l

~

S DOCKET NO.

Nl Ginna Station Ug)T 5HUTpo'gg 4Np po'gER REpU(:T)QQ5 DATE Se ember 12 COhfPLETED BY Andrew E. McNamara REPORT MONTH TEI.EPIION(:. 1-716-546-2700 Ext. 291-205, at Ginna I

tlt 0 4 o 4ol o- v Licensee C

ln Cause & Corrective 0

I 4

0 4 Ew.

0 0 Cl C

No. Date 4 0 0 Event 0 Action to

~ 4 > lO 4 0 0 n.'wn Report 0 0 E Prevent Recurrence 4 I/0 0

O CL 790706 S 89.75* H LER 879-13 ZZ To comply.-with inspection require-ments of NRC I&E Bulletin 79-13 (F.W. Steam Generator Nozzle Weld Inspection).

790805 .75 B ZZ During Turbine Overspeed Trip. Test, loss of condenser vacuum caused a reactor trip followed by a turbine trip o 3 4 F: Forced Reason: hfethod: Exhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hfanual for Preparation of Data B-hfaintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 40.dd (Rav 1/7dl H-Other (Explain) Exhibit 1 - Same Source

  • Outage No. 6 shutdown hours in Report Month only.

t 1,

II I

1 J r J

ll e m ~

4 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT Ginna Station Unit //I DATE September 12, 1979 COMPLETED BY Andrew E. McNamara TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna MONTH August, 1979 The Unit remained shutdown until 0700 on 8/4/79, to comply with requirements in NRC IGE Bulletin 79-13.

The Unit maintained ~ 100% Reactor Power Level during the Report Month, with the following exceptions:

On 8/5, during performance of the Turbine Overspeed Trip Test, the Reactor tripped due to loss of condenser vacuum;- causing a Turbine Trip.

On 8/27, the Reactor Power Level was reduced to w97% to perform a periodic test on the Auxiliary Feedwater System Flow.

On 8/31, a Reactor Power Level reduction was initiated due to the Boric Acid Tanks concentration being out of specifications. The Reactor Power Level was restored to 100% when the Boric Acid Tank concentrations were retest/d and found within specifications..

49 $ 23 <1/781

/q I

GINNA STATION MAINTENANCE REPORT FOR AUGUST 1979 During August, normal inspection and minor maintenance was performed.

Major safety related maintenance included:

1. Replacement of the starter, batteries, battery cables and lugs on the diesel fire pump after the failed starter damaged these components.
2. An inspection of the diesel fire pump and right angle drive.
3. Installation of a spare limitorque operator on valve 3505, main steam to the turbine driven auxiliary feedwater pump.
4. Installed a spare relief valve in the 1B charging pump to replace 284.
5. Installed a spare pressurizer master controller PC 431K after operator problems were notetl with the existing controller.