Forwards IE Insp Rept 50-244/78-22 on 781023-25 & Notice of Violation
ML17244A298
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/16/1978
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: White L
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17244A296 List:
References
NUDOCS 7901030105
Download: ML17244A298 (4)


See also: IR 05000244/1978022

Text

40jo~o

~PS R~p

Wp0

~>>*+4'ocket

No. 50-244

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA 19406

NOY 1 6

1978

Rochester

Gas

and Electric Corporation

ATTN:

Mr.. Leon

D. White, Jr.

Vice President

Electric and Steam Production

89 East Avenue

Rochester,

New York

14649

Gentlemen:

Subject:

Inspection

50-244/78-22

This refers to the inspection

conducted

by Dr.

M. Shanbaky of this

office on October 23-25,

1978, at the Robert

E. Ginna Nuclear Plant

Site, Ontario,

New York, of activities authorized

by

NRC License

No.

DPR-18 and to the discussions

of our'findings held by Dr. Shanbaky with

~

~

~

Mr. Snow and other, members of your staff at the conclusion of the in-

.

spection,

and to a subsequent

telephone discussion

between

Dr. Shanbaky

and Mr. Snow on October 30,

1978.

Areas

examined during this inspection are described

in the Office of

Inspection

and Enforcement Inspection

Report which is enclosed with this

letter.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector;

Our inspector also verified the steps

you have taken to correct the item

of noncompliance

brought to your attention in a letter dated

June

29,

1977.

We have

no further questions

regarding your action at this time.

Based

on the results of this inspection, it appears

that one of your

activities

was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed

herewith

as Appendix

A.

This item of noncompliance

has

been .categorized

into the levels

as

described

in our correspondence

to you dated

December

31, 1974.

This

notice is sent to you pursuant to the provisions of Section

2.201 of the

NRC's'"Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations.

Section

2.201 requires

you to submit to this office, within twenty (20)

days of your receipt of this notice,

a written statement

or explanation

in reply including:

(1) corrective steps

which have

been taken

by you

and the results

achieved;

(2) corrective steps

which will be taken to

avoid further items of noncompliance;

and (3) the date

when full compliance

will be achieved;

7901.03C

I o5

fy'~,if'Q4

Rochester

Gas

and Electric

Corporation

In accordance

with Section

2.790 of the

NRC's "Rules of Practice," Part

2, Title 10,

Code of Federal

Regulations,

a copy of this letter and the

enclosures will be placed in the NRC's Public Document

Room. 'f this

report contains

any information that you (or your contractor)

believe to

be proprietary, it is necessary

that you make

a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must

be accompanied

by an affidavit

executed

by the owner of the information, which identifies the document

or part sought to be withheld,

and which contains

a statement of reasons

which addresses

with specificity the items which will be considered

by

the Commission

as listed in subparagraph

(b)(4) of Section 2.790.

The

information sought to be withheld shall

be incorporated

as far as possible

into a separate

part of the affidavit. If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

pleased

to discuss

them with you.

'incerely,

George

H. Smith, Chief

Fuel Facility and Materials

afet

Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection

and Enforcement

Inspection

Report

Number 50-244/78-22

cc w/encls:

B. A. Snow, Plant Superintendent

S. Bullock, gC Engineer

Lex K. Larson,

Esquire