2017004_Radiation Safety Inspection RFI Public
ML17236A416
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/23/2017
From: Jonathan Rivera
NRC/RGN-II/DRS/PSB1
To: Mihalakea S
Florida Power & Light Co
References
IR 2017004
Download: ML17236A416 (7)


Text

Turkey Point Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2017004 During the weeks of October 2 - 6, 2017 and October 16 - 20, 2017, the NRC will perform a baseline Radiation Safety Inspection at Turkey Point Nuclear Plant, Units 3 and 4 (NRC Inspection Procedures 71124.01, 71124.02, 71124.03, 71124.04, 71124.05, and 71151).

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than September 25, 2017.

If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Rivera at 404-997-4508, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html.

PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Document Request List Inspection Dates: October 2 - 6 and October 16 - 20, 2017 Documents Due to Region II by: September 22, 2017 Inspection Procedures (IPs): 71124.01 Radiological Hazard Assessment and Exposure Controls 71124.02 Occupational ALARA Planning and Controls 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124.04 Occupational Dose Assessment 71124.05 Radiation Monitoring Instrumentation 71151 Performance Indicator Verification (Radiation Safety cornerstones only)

Lead Inspector: Jonathan Rivera Health Physicist U.S. NRC Region II 404-997-4646 Jonathan.Rivera@nrc.gov Note: The current version of these documents is expected unless specified otherwise.

Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. Experience has shown that a poorly organized CD leads to a less efficient inspection, and places additional burden on licensee staff.

Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.

General Information

  • List of primary site contact(s) for each inspection area below, including name(s) and telephone numbers.
  • List of radiation protection procedures, including title and number.
  • Corrective Action Program (CAP) procedures.
  • Outage schedule of major activities (Gantt chart if available), including work activities to be conducted during the weeks of the inspection.
  • Most recent audits and self-assessments performed that encompass each inspection area below.

- Radiological Hazard Assessment and Exposure Controls (Last inspected April 2016)

1. List of upcoming Unit 4 (U4) outage Radiation Work Permits (RWPs).
2. List of locations, or plant maps indicating the location, of all locked high radiation areas (LHRAs) and very high radiation areas (VHRAs). Include areas with the potential to become a LHRA during routine operations or outages.
3. Independent Spent Fuel Storage Installation (ISFSI) information to include surveys, exposure data, and as low as reasonably achievable (ALARA) planning and reviews conducted for the last two moves, as well as last two routine surveys of the facility and Thermoluminescent Dosimeter (TLD) area monitoring results of the facility.
4. Site and corporate procedures related to health physics (HP) controls (e.g., posting, labeling, surveys, RWPs, contamination control, high radiation area (HRA)/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots).
5. List of the 10 most exposure significant work areas within radiation areas (RAs), HRAs, or airborne radioactivity areas in the plant. This may include areas with low dose rates, but high collective dose. Identify any HRAs with significant dose gradients (factor of five or more), including underwater diving activities.
6. Procedures related to the release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm follow-up).
7. List of Nationally Tracked Sources, and copies of any National Source Tracking System (NSTS) transaction documentation (e.g., annual reconciliation).
8. Most recent sealed source inventory record.
9. List of all non-fuel items stored in spent fuel pool (SFP).
10. List of CAP nonconformance reports (NCRs), action requests (ARs), condition reports (CRs),

etc. related to HP controls (e.g., radworker error, HP technician error, posting issues, Nationally Tracked Sources, HRA/LHRA/VHRA issues, survey problems) issued since April 2016. This should be a list of corrective action documents containing NCR, AR, CR, etc.

numbers and brief descriptions, not full documents.

- ALARA Planning and Controls (Last inspected November 2015)

1. Site and corporate procedures associated with maintaining exposure ALARA, including those involving ALARA work activities. These procedures should include ALARA program implementation, RWP preparation and worker compliance, estimating and tracking specific exposures for work activities, making changes to dose estimates during task performance, work controls, engineering controls, exposure mitigation requirements, and source term reduction.
2. List of top five dose jobs for the upcoming U4 refueling outage and associated ALARA planning packages (including dose estimates, work-hour estimates, special HP controls, and dose reduction initiatives).
3. Most recent annual ALARA report and most recent refueling outage report.
4. Annual ALARA goals for 2016 and 2017, and the methodology utilized to make the projections.
5. Current status/characterization of plant source term, as well as any relevant plans or actions to reduce it.
6. Summaries of the last four ALARA Committee Meetings (e.g., meeting minutes).
7. Completed ALARA packages (including post-job reviews) for the five work activities that had the greatest collective dose and were completed during the previous outage.
8. ALARA packages for the five work activities expected to have the greatest collective dose, and are scheduled for completion during the upcoming U4 outage.
9. List of shielding packages for the upcoming outage.
10. Shutdown survey results for the last two outages.
11. List of NCRs, ARs, CRs, etc. related to the ALARA program issued since November 2015.

This should be a list of corrective action documents containing NCR, AR, CR, etc. numbers and brief descriptions, not full documents.

- In-Plant Airborne Radioactivity Control and Mitigation (Last inspected November 2015)

1. Site and corporate procedures related to airborne monitoring and control. These procedures should include operation, calibration, maintenance, and set-point determination of air sampling equipment; issuance, use, training, fit-testing, storage, maintenance, and quality assurance (QA) of respiratory protective equipment, including Self-Contained Breathing Apparatus (SCBA) and air-supplied respirators; SCBA maintenance of vital components (i.e., regulators); determination and verification of Grade D air for SCBAs; use of containment purge; use of portable High Efficiency Particulate Air (HEPA) / charcoal units; Total Effective Dose Equivalent (TEDE)-ALARA determinations; and alpha air sampling.
2. Two most recent HEPA filter Dioctyl phthalate (DOP) and charcoal test results for the following ventilation systems:
  • Control Room Ventilation
  • Radwaste Processing Building Ventilation
  • Auxiliary Building Ventilation
  • U4 Containment Ventilation
3. All records of grade D air quality certification for breathing air supply systems for SCBAs and air-supplied respirators filling equipment since November 2015.
4. Last two surveillances performed on SCBAs stored for emergency use.
5. Available for onsite review during inspection:
a. Vendor training certificates for all individuals qualified to repair SCBA vital components.
b. List of all licensed operators, maintenance personnel, and HP personnel qualified to use SCBAs.
c. Inventory, inspection, and maintenance records for SCBA equipment.
6. List of NCRs, ARs, CRs, etc. related to airborne controls and respiratory protection since November 2015. This should be a list of corrective action documents containing NCR, AR, CR, etc. numbers and brief descriptions, not full documents.

- Occupational Dose Assessment (Last inspected November 2015)

1. Site and corporate procedures related to internal and external dose monitoring (i.e., dosimetry issuance and use). These procedures should include guidance for multi-badging; monitoring in steep/highly variable dose rate gradients; personnel contamination

events; storage/care of personal dosimeters; use of electronic dosimeters (EDs) including evaluation of any biases identified relative to TLD monitoring; internal dose assessment (i.e.,

both in-vivo and in-vitro bioassay and air sampling capabilities); guidance for calibration, QC, and use of whole body counter (WBC); release of contaminated individuals; use of passive monitoring as screening method for evaluations; special in-vitro sample collection and analysis; and actions for declared pregnant workers (DPW).

2. National Voluntary Laboratory Accreditation Program (NVLAP) accreditation documentation for current dosimetry used by the site.
3. List of all positive WBCs results, in-vitro or air sampling analyses that resulted in an assigned committed effective dose equivalent (CEDE) equal to or exceeding 10 millirem since November 2015. [Note: Only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
4. List of all personnel contamination events identified since November 2015. [Note: Only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
5. A list of personnel who have received approved dose extensions since November 2015.
6. List of NCRs, ARs, CRs, etc. related to internal and external dosimetry since November 2015. This should be a list of corrective action documents containing NCR, AR, CR, etc.

numbers and brief descriptions, not full documents.

Radiation Monitoring Instrumentation (Last inspected November 2015)

1. Site and corporate procedures related to radiation monitoring instrumentation. These procedures should include use of portable instrument calibrators (e.g., Shepherd calibrator);

calibration and functional test/source checks of portable radiation detection instrumentation; calibration and functional tests of small article monitors (SAMs), personnel contamination monitors (PCMs), portal monitor (PMs), WBC equipment, and continuous air monitors (CAMs); determination of set-points for Area Radiation Monitors (ARMs), CAMs, PCMs, PMs and SAMs; and QA program for count room instruments (e.g., laboratory inter- comparison data).

2. Last two calibration records for the Unit 3 (U3) and U4 containment high-range post-LOCA radiation monitors.
3. List of the following monitors currently in service (including serial number, location, and model information; specific calibration records will be selected for review during the onsite inspection):
  • All SAMs at radiological controlled area (RCA) exit points
  • All PMs at RCA exit points and the protected area (PA) exit
  • All count room High-Purity Germanium and Liquid Scintillation counters
  • All in service portable radiation survey instruments available for use (including air samplers, friskers, telepoles/teletectors, and dose rate measuring instruments)
4. Documentation for the sources used to calibrate the monitors in bullet no. 2 above, showing traceability to the National Institute of Standards & Technology/National Bureau of Standards (NIST/NBS), and to the primary calibration, as applicable.
5. Last two calibration records of the portable instrument calibrator (e.g., Shepherd validation testing/dose rate curves).
6. Last two calibration records for the WBC (and PM if passive monitoring used).
7. List of any Emergency Action Level (EAL) value(s) associated with installed or portable radiation monitoring instrument indication(s). Last two system health reports for the Radiation Monitoring System(s).
8. Last two surveillances performed on the post-accident sampling system, as applicable.
9. Discussion of any modification(s), upgrade(s), or replacement(s) performed on installed radiation monitoring instrumentation (e.g., area radiation monitors, CAMs, RCA release point monitors, WBCs, and count room instruments) since November 2015.
10. List of NCRs, ARs, CRs, etc. related to radiation monitoring instrumentation since November 2015. This should be a list of corrective action documents containing NCR, AR, CR, etc.

numbers and brief descriptions, not full documents.

71151 - Performance Indicator Verification (Last inspected December 2016)

1. Site and corporate procedures for gathering and reporting performance indicator (PI) data.
2. Monthly/Quarterly PI reports since December 2016, and copies of associated corrective action reports for any Occupational Exposure or Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent PI events occurrences.
3. Most recent gaseous and liquid effluent release permits showing year-to-date curies released by isotope and associated public dose assessments, and the last calendar year (CY) 2016 gaseous and liquid effluent release permits showing year-to-date curies released by isotope and associated public dose assessments
4. List of all corrective action documents since December 2016, using keywords such as:

HRA, LHRA, VHRA, unintended dose, unlocked LHRA door, etc.

5. List of all corrective action documents since December 2016, using keywords such as:

abnormal/ unmonitored effluent release, etc.

6. List of all ED dose and dose rate alarms (including setpoints and the dose / dose rate received), since December 2016.

Inspector Information Jonathan Rivera Health Physicist U.S. NRC Region II 404-997-4646 Mailing Address U.S. Nuclear Regulatory Commission, Region II Attn: Jonathan Rivera 245 Peachtree Center Ave., NE Suite 1200 Atlanta GA, 30303