September 21, 2017 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
FINAL SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-551, REVISION 3, REVISE SECONDARY CONTAINMENT SURVEILLANCE REQUIREMENTS " (CAC NO. MF5125)
Dear Members of the Technical Specifications Task Force:
By letter dated October 3, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16277A226), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements.
By letter dated July 3, 2017 (ADAMS Package Accession No. ML17080A409), an NRC draft safety evaluation (SE) and draft model SE of traveler TSTF-551 were provided for your review and comments. By letter dated August 2, 2017 (ADAMS Accession No. ML17214A804), you commented on the SEs. The NRC staffs final SE and final model SE are enclosed with this letter.
The traveler was submitted as part of the consolidated line item improvement process (CLIIP).
During the review of TSTF-551, NRC staff determined that plant-specific information is necessary for adoption of the traveler. Therefore, TSTF-551, Revision 3, is not approved as a CLIIP traveler.
The traveler TSTF-551, Revision 3, is applicable to boiling water reactor (BWR) nuclear power plants. The proposed change revises Revision 4 of the Standard Technical Specifications (STS), Volumes 1 and 2 of NUREG-1433, Standard Technical Specifications General Electric BWR/4 Plants, and NUREG-1434, Standard Technical Specifications General Electric BWR/6 Plants. Volume 1 of these NUREGs can be accessed in ADAMS under Accession Nos. ML12104A192 and ML12104A195, respectively. Volume 2 of these NUREGs can be accessed in ADAMS under Accession Nos. ML12104A193 and ML12104A196, respectively.
Our SE applies only to material provided in the subject traveler. When a licensee submits a license amendment request (LAR) to adopt the traveler, the NRC staff review will ensure that the material presented applies to the specific plant involved. We do not intend to repeat a technical review of the material provided in the traveler. Licensees are responsible for reviewing the NRC staffs SEs and the applicable technical justifications, providing any necessary plant-specific information, and assessing the completeness and accuracy of their LAR. The NRC will process each LAR to adopt this traveler according to applicable NRC rules and procedures.
The traveler TSTF-551, Revision 3, does not prevent licensees from requesting an alternate approach or proposing changes other than those in TSTF-551, Revision 3. However, significant changes from the approach recommended or the inclusion of additional changes in the LAR will
TSTF require additional NRC staff review, increase the time and resources needed for the review, and/or result in non-acceptance of the LAR. Licensees desiring significant or additional changes should instead submit an LAR that does not claim to adopt TSTF-551, Revision 3.
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.
Sincerely,
/RA/
Jennifer M. Whitman, Acting Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753
Enclosures:
- 1. Final Safety Evaluation of the Traveler
- 2. Final Model Safety Evaluation cc: See next page
TSTF Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James R. Morris Diablo Canyon Power Plant Building 104/5/21A P.O. Box 56 Avila Beach, CA 93424 E-mail: james.morris@pge.com Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com Otto W. Gustafson Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Jason P. Redd Southern Nuclear Operating Company 42 Inverness Center Parkway Bin B234 Birmingham, AL 35242-4809 E-mail: jpredd@southernco.com
Package: ML17236A365 Cover Letter: ML17236A367 Final Traveler SE: ML17236A366 Final Model SE: ML17236A368
- concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/SBPB*
DRA/ARCB*
DORL/BC*
NAME MHoncharik RDennig KHsueh JDanna DATE 8/24/2017 8/28/2017 8/24/2017 9/6/2017 OFFICE OGC*
DSS/STSB DSS/STSB*
NAME BHarris MHoncharik JMWhitman DATE 9/12/2017 9/12/2017 9/21/2017