Notice of Violation from Insp on 960719-0906.Violation Noted:Valve V-32-170 Was in Open Position & Fire Door 111 Blocked Open W/O Fire Protection Impairment Request Initiated & Posted on Door
ML17229B553
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/14/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17229B552 List:
References
50-331-96-06, 50-331-96-6, NUDOCS 9611220268
Download: ML17229B553 (1)


Text

NOTICE OF VIOLATION IES Utilities Inc.

Duane Arnold Energy Center Docket No. 50-331 License No.

DPR-49 During an NRC inspection conducted on July 19 through September 6,

1996, two violations of NRC requirements were identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," the violations are listed below:

Technical Specification (TS) 6.8. 1 requires that written procedures covering areas such as normal startup, operation, and shutdown of systems and components of the facility be implemented.

Operating Instruction (OI) 324, "Standby Diesel Generator System" requires that valve V-32-170 (standby diesel generator engine driven air cooling water pump suction drain) be closed.

Contrary to the above, on July 23, 1996, the inspectors identified that valve V-32-170 was in the open position.

This is a Severity Level IV violation (Supplement 1).

2.

Technical Specification (TS) 6.8. 1 requires that written procedures covering areas such as the Fire Protection Program be implemented.

Administrative Control Procedure (ACP) 1412.4, "Impairments to Fire Protection Systems" requires that fire doors that will be blocked open will require a Fire Door Impairment Permit be placed on the fire door.

Contrary to the above, on August 9, 1996, the inspectors identified that fire door 111 was blocked open without a fire protection impairment request initiated and posted on the door.

This is a Severity Level IV violation (Supplement 1).

The NRC has concluded that information regarding the reasons for the violations, the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance was achieved is already adequately addressed on the docket in the subject inspection report.

However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or your position.

In that case, or if you choose to respond, clearly mark your response as a "Reply to a Notice of Violation," and send it to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control

Desk, Washington, D.C.

20555 with a copy to the Regional Administrator, Region III, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

Dated at Lisle, Illinois this 14 day of November 1996 96ii220268 96iii4 PDR ADOCK 0500033i 8