Forwards Insp Rept 50-331/96-06 on 960906 & Notice of Violation
ML17229B551
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/14/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML17229B552 List:
References
NUDOCS 9611220263
Download: ML17229B551 (5)


See also: IR 05000331/1996006

Text

C'e

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

4 ACCESSION NBR:9611220263

DOC.DATE: 96/11/14

NOTARIZED: NO

DOCKET

FACIL:50-331 Duane Arnold Energy Center,

Iowa Electric Light 6

Pow

05000331

UTH,. NAME

AUTHOR AFFILIATION

DWELL,J.L.

Region

3 (Post

820201)

ECIP.NAME

RECIPIENT AFFILIATION

LIU,L.

IES Utilities Inc., (formerly Iowa Electric Light

S

Power

C

SUBJECT:

Forwards insp rept 50-331/96-06

on 960906

& notice of

violation.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD3-3

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

KELLY,G.

COPIES

LTTR ENCL

1

1

T

E

INTERNAL: ACRS

A

E CEN

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN3

FILE

01

EX ERNAL: LITCO BRYCEgJ

H

NRC PDR

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Y

La

D

0

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

Nov~ 14,

1996

Mr. Lee Liu, Chairman of the Board,

~

President

and Chief Executive Officer

IES Utilities Inc.

200 First Street

S.E.

P.

O.

Box 351

Cedar Rapids,

IA

52406-0351

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-331/96006(DRP)

Dear Mr. Liu:

On September

6,

1996, the

NRC completed

a routine safety inspection at your

Duane Arnold Energy Center

(DAEC) facility.

The enclosed

report presents

the

results of that inspection.

During this 7-week inspection period, your conduct of activities at the

Duane

Arnold Energy Center facility was characterized

by

a safety conscious

approach

to activities.

We are concerned,

however,

about

an emergent

negative trend in

human performance

events.

This report discusses

several

examples

where

human

error contributed to poor exe'cution of safety

system work.

Additionally, this

report also identifies several

areas of weak oversight

and control of

contractor activities.

While the safety consequences

of these

examples

were

minor,

we are concerned

about these

items in light of the large

number of

contractors

anticipated

on site to support your upcoming refuel outage.

Additionally, the

NRC has determined that

2 violations of NRC requirements

occurred.

The violations are cited in the enclosed

Notice of Violation and

the circumstances

surrounding

them are described

in detail in the subject

inspection report.

The first violation is of concern

because

of the

importance of assuring

proper valve line-up configurations

on safety-related

equipment.

The second violation is of concern

because it represents

an

example of weak oversight of contractor activities.

The

NRC has concluded that information regarding the reason for the

violations, the corrective actions

taken

and planned to correct the violations

and prevent recurrence,

and the date

when full compliance

was achieved is

addressed

in the subject inspection report.

Therefore,

you are not required

to respond to this letter unless

the description therein

does not accurately

reflect your corrective actions or your position.

In that case,

or if you

choose to provide additional information, you should follow the instructions

specified in the enclosed

Notice.

Sincerely,

/s/John A. Grobe for

James

L. Caldwell, Acting Director

Division of Reactor Projects

See attached for distribution

DOCUMENT NAME: R:iINSPRPTSiPOWERSiDUANiDUA96006.DRP

To receive

~ copy of thea doceent,

1nd5cate

tn the hox

C"

Copy rithout attach/encl

"E" ~ Copy rtth attach/encl

"N"

No co

OFFICE

NAME

DATE

RIII

Kurth/Ton ue/s

11/8 /96

RIII

Kozak

11/

/96

ll/8'6

11/

6

RIII

RIII

Lanksbury 9

$

Caldwe

obe

OFFICIAL RECORD

COPY

96ii220263 9hiii4

PDR

ADGCK 0500033i

8

PDR

L. Liu

~

~

Docket No. 50-331

License

No.

DPR-49

Enclosure:

Inspection

Report

No. 50-331/96006(DRP)

cc w/encl:

G.

Van Hiddlesworth,

Plant Hanager

K. Peveler,

Hanager,

Licensing

and

Emergency

Planning

Chairperson,

Iowa Utilities Board

Distribution:

Docket File w/encl

PUBLIC IE-Ol w/encl

Project Hgr.,

NRR w/encl

OC/LFDCB w/encl

A. B. Beach,

w/encl

B. L. Burgess,

w/encl

DRP w/encl

RIII PRR w/encl

SRI,

DAEC w/encl

CAA1 w/encl (e-mail)

W. L. Axelson, w/encl

mp,R RECy

~o

A0

~o~

~a*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

801 WARRENVILLEROAD

USLE, ILLINOIS60532-4351

November 14,

1996

Mr. Lee Liu, Chairman of the Board,

President

and Chief Executive Officer

IES Utilities Inc.

200 First Street

S.E.

P. 0.

Box 351

Cedar Rapids,

IA

52406-0351

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-331/96006(DRP)

Dear Mr. Liu:

On September

6,

1996, the

NRC completed

a routine safety inspection at your

Duane Arnold Energy Center

(DAEC) facility.

The enclosed

report presents

the

results of that inspection.

During this 7-week inspection period, your conduct of activities at the Duane

Arnold Energy Center facility was characterized

by a safety conscious

approach

to activities.

We are concerned,

however,

about

an emergent

negative trend in

human performance

events.

This report discusses

several

examples

where

human

error contributed to poor execution of safety system work.

Additionally, this

report also identifies several

areas of weak oversight

and control of

contractor activities.

While the safety consequences

of these

examples

were

minor,

we are concerned

about these

items in light of the large

number of

contractors

anticipated

on site to support'our

upcoming refuel outage.

Additionally, the

NRC has determined that

2 violations of NRC requirements

occurred.

The violations are cited in the enclosed

Notice of Violation and

the circumstances

surrounding

them are described

in detail in the subject

inspection report.

The first violation is of concern

because

of the

importance of assuring

proper valve line-up configurations

on safety-related

equipment.

The second violation is of concern

because it represents

an

example of weak oversight of contractor activities.

The

NRC has

concluded that information regarding the reason for the

violations, the corrective actions

taken

and planned to correct the violations

and prevent recurrence,

and the date

when full compliance

was achieved

is

addressed

in the subject inspection report.

Therefore,

you are not required

to respond to this letter unless

the description therein

does not accurately

reflect your corrective actions or your position.

In that case,

or if you

choose to provide additional

information, you should follow the instructions

specified in the enclosed

Notice.

Sincerely,

See attached

for distribution

ames

L. Caldwell, Acting Director

Division of Reactor Projects

L. Liu

Docket

No. 50-331

License

No.

DPR-49

Enclosure:

Inspection

Report

No. 50-331/96006(DRP)

cc w/encl:

G.

Van Middlesworth, Plant Manager

K. Peveler,

Manager,

Licensing

and

Emergency

Planning

Chairperson,

Iowa Utilities Board