ML17229A763

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/98-06 & 50-389/98-06 on 980329-0509 & Nov.Violation Re Equipment Clearance Orders of Concern If Not Implemented Properly
ML17229A763
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/08/1998
From: Plisco L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Plunkett T
CAROLINA POWER & LIGHT CO.
Shared Package
ML17229A764 List:
References
50-335-98-06, 50-335-98-6, 50-389-98-06, 50-389-98-6, NUDOCS 9806160206
Download: ML17229A763 (10)


See also: IR 05000335/1998006

Text

CATEGORY 2

DOCKET

05000335

05000389

2.

T

E

NOTES:

1

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RZDS)

ACCESSION NBR:9806160206

DOC.DATE:'98/06/08

NOTARIZED: NO

~

~

ACIL:50-335 St. Lucie Plant,

Unit. 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME

AUTHOR AFFILIATION

PLISCO,L.R.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATZON

PLUNKETT,T.F.

Carolina Po~er

& Light Co.

SUBJECT:

Forwards insp repts

50-335/98-06

& 50-389/98-06

on

980329-0509

S NOV.Violation re equipment clearance

orders of

concern if not implemented properly.

DISTRIBUTION CODE: IE01F

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

RECIPIENT

ZD CODE/NAME

PD2-3

PD

INTERNAL: ACRS

AEOD T

LE CENT

R" DRPM/PECB

NUDOCS -ABSTRACT

OGC/HDS3

RNAL: LITCO BRYCE,J H

NRC

PDR

COPIES

LTTR ENCL

1,

1

2

'

1

1

1

1

1

1

1

1

1

1

1

1

1

1

,RECIPIENT

ID CODE/NAME

GLEAVES,W

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN2

FILE

01

NOAC

NUDOCS FULLTEZT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

0

THIS DOCUMENT

HAS BEEN SCANNED

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

tDCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

'I

~

June

8,

1998

Florida Power 5 Light Company

ATTN:

T. F. Plunkett

President

- Nuclear Division

P. 0.

Box 14000

Juno Beach,

Florida

33408-0420

SUBJECT:

NRC

INTEGRATED INSPECTION REPORT

NOS. 50-335/98-06.

50-389/98-06

AND NOTICE OF VIOLATION.

Dear Hr. Plunkett:

On May 9,

1998, the

NRC completed

an inspection at your St. Lucie

1 and

2

reactor facilities.

The enclosed

report presents

the results of that

inspection.

Based

on our inspection findings and your completed

and planned actions.

the

NRC staff is closing our review of the Generic Letter 89-10 program.

"Safety-

Related Hotor-Operator Valve Testing

and Surveillance," at St. Lucie.

In addition.

based

on the results of this inspection,

the

NRC has determined

that violations of. NRC requirements

occurred.

The violation regarding

equipment clearance

orders is of concern

because if not implemented properly.

a clearance

challenges

not only the safety of the plant, but the safety of the

personnel

as well.

Additionally, this violation is repetitive and its

recurrence

indicates

inadequate corrective action was taken with a previous

violation.

Repetitive violations are addressed

in the NRC's "Statement of

Policy and Procedure for NRC Enforcement Actions." (Enforcement Policy),

NUREG-1600, Section

IV.B'.

The Enforcement Policy allows the severity level of

a violation to be increased if the violation can be considered repetitive.

For example.

a Severity Level

IV violation could be increased to Severity

Level III with the attending escalated

enforcement action.

However, in this

case.

we have. decided not to increase

the severity level of this violation

based

on the depth

and timeliness of your corrective actions to this violation

and your overall satisfactory

performance in this area.

These violations are cited in the enclosed

Notice of Violation, and the

circumstances

surrounding the violations are described in detai 1 in the

enclosed

report.

Please

note that you are required to respond to this letter

and should follow the instructions specified in the enclosed

Notice when

preparing your response.

The

NRC will use your response,

in part, to

determine whether further enforcement

action is necessary to ensure

compliance

with regulatory requirements.

9806i60206 980608

PDR

ADOCK 05000335

8

PDR

/l

0

FP8L

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room

(PDR).

Sincerely,

(Original signed

by L.

R. Plisco)

Loren R. Plisco, Director

Division of Reactor Projects

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Enclosures:

1.

Notice of Violation

2.

Inspection Report

Nos. 50-335/98-06,

50-389/98-06

cc w/encls:

J.'. Stall

Vice President

St.

Lucie Nuclear Plant

6351 South

Ocean Drive

Jensen

Beach.

FL

34957

H..N.

Paduano,

Manager

Licensing

and 'Speci al

Progr ams

Florida Power and Light Company

P. 0.

Box 14000

Juno Beach,

FL

33408-0420

J. Scarola,

Plant General

Manager

St. Lucie Nuclear Plant

6351 South

Ocean Drive

Jensen

Beach.

FL

34957

E. J.

Weinkam

Licensing Manager

St. Lucie Nuclear Plant

6351 South

Ocean Drive

Jensen

Beach.

FL

34957

M. S. Ross,,Attorney

Florida

Power

8 Light

P. 0.

Box 14000

Juno Beach,

FL

33408-0420

'ohn T. Butler,

Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami. FL

33131-2398

cc w/encls cont'd:

(See

page 3)

lt

FP8L

cc w/encls cont'd:

Bill Passetti

Office of Radiation Control

Department of Health and

Rehabilitative

Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Joe Nyers, Director

Division of Emergency

Preparedness

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

Douglas Anderson

County Administrator

St. Lucie County

2300 Virginia Avenue

Ft. Pierce,

FL

34982

Distribution w/encls:

(See

page 4)

FPSL

Distribution wlencl s I

L. R. Plisco, RII

L. D. Wert, RII

R.

P. Schin, RII

W. C. Gleaves,

NRR

G. T. Hopper, RII

PUBLIC

NRC Resident

Inspector

U.S.

Nuclear

Regulatory Commission

7585 South Highway A1A

Jensen

Beach,

FL

34957-1020

'v~o

c ~1

p f

OFFICE

SIGNATURE

D

IRII

DR/

I

DRP/R I

DRP/RII

D

/RI

~i

D

RII

o< V'RS/RII

ISQ1

DL

GMorm c

CPotterson

EgroMoa

PKe

ogg

DATE

COPY?

OFFICE

/

l

/

YES

DRS/RI I

/ ~ /

S

NO

D

/RI

/

/

S

NO

INEEL

/

/

TES

NO

/

i

/

TES

TES

0

/

/

TES

0

SIGNATURE

Hc '/h

DAT

JYor

/

/

OFFICIAL RECORD COPT

1 SCQQfl

NHo

roo

/

y

I

E

DOCNIENT

AS l/

I

YES

NO

/

I

TES

NO

/

I

YES

NO

/

I

YES

NO

1

a

J

FPSL

Distribution w/encl s:

L. R. Plisco, RII

L. D. Wert. RII

R.

P. Schin, RII

W. C. Gleaves.

NRR

G. T. Hopper, RII

PUBLIC

NRC Resident

Inspector

U.S.

Nuclear

Regulatory Commission

7585 South Highway AlA

Jensen

Beach,

FL

34957-1020

OFFICE

SIGNATURE

DRP/RI I

DRP/R II

DRP/RII

DRP/RII

DRP/RII

DRP/RI I

DRS/RI I

SR

basal

~

JN

DLanys

GMarm c

CPaItcrson

EBroam

PKo

ogg

DATE

COPY?

OFF ICE

SIGNATURE

DAT

/

/

TES

NO

DRS/RII

JYor

/

/

TES

NO

/

/

TES

NO

DRS/RII

GQ>sanan

/

/

TS

NO

/

/

YES

NO

INEEL

NHO

Ioo

/

/

YES

NO

/

/

TES

NO

DRS/RII

RS

sn

NO

/

/

YES

NO

EICS/RII

oh

/

YES

NO

/

/

YES

NO

/

/

YES

NO

/

/

YES

NO

/

/

TES

NO

OFFICIAL RECORD

COPY

DOCINENT RANE.