Forwards Modified Relief Request 14 & Addl Info Re ISI Plan Second 10-yr Interval
ML17228B328
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/20/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-310, NUDOCS 9511280071
Download: ML17228B328 (47)


Text

P R.ICDR.IMY'CCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9511280071 DOC. DATE: 95/11/20 NOTARIZED: NO FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.

AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET N

05000389

SUBJECT:

Forwards modified relief request 14

& addi info re ISI Plan second 10-yr interval.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 NOTES RECIPIENT ID CODE/NAME PD2-1 LA NORRIS,J INTERNAL: ACRS C ~

1 NRR/DE/EMCB NUDOCS-ABSTRACT RES/DET/EMMEB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1

1 1

1 6

0 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/SPD/RAB NRR/DE/ECGB NRR/DE/EMEB OGC/HDS3 RES/DSIR/EIB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 1

1 NOTE TOALL "RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOKI Pl-37 (EXT. 504-2083 ) TO ELIlXIINATEYOUR NAME PRO%I DISTRIBUTIONLISTS I:OR DOCUMENTS YOU DON"I'LEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 14

Florida Power & Light Company, P.O. Box 128, Fort Pierce. FL 34954-0128 November 20, 1995 L-95-310 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555 RE:

St. Lucie Unit 2 Docket No. 50-389 In-Service-Inspection Plan Second Ten-Year Interval Relief Re uest 14 Su lement By letter dated May 4,

1995, NRC transmitted the safety evaluation approving the Second-Ten-Year Interval In-Service Inspection (ISI)

Plan for St. Lucie Unit 2. Relief request 14 was identified as an open item in that evaluation and was to be resolved by separate correspondence.

Subsequent conference calls with the NRC Project Manager identified the need for FPL to provide additional justification on the rescheduling of examinations in the relief request.

The modified relief request 14 including the additional information is Attachment 1.

Each request is specifically addressed in Attachment 2.

This additional information supports the FPL determination pursuant to 10 CFR 50.55a (a)(3) that the proposed alternatives would provide an acceptable level of quality and

safety, and that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

Please contact us if there are any questions about this submittal.

Very truly yours, D. A.

er Vice r sident St.

Luc e Plant DAS/GRM cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant OgnOQ 95ii28007i 95ii20 PDR ADOCK 05000389 an FPL Group company 9

pDR

St. Lucie Unit 2 Docket No. 50-389 In-Service-Inspection Plan Second Ten-Year Ihterval Relief Re uest 14 Su lement ATTACHMENT 1

ST.

LUCIE UNIT 2 SECOND INSPECTION INTERVAL RELIEF REQUEST NUMBER 14 A.

COMPONENT IDENTIFICATION:

Class:

Component Identification:

Reactor Pressure Vessel and Closure Head Steam Generator Primary Side Pressurizer Steam Generator Secondary Side Shutdown Cooling Water Heat Exchanger Regenerative Heat Exchanger B.

EXAMINATIONREQUIREMENTS:

1.

Quality Group A, ASME Code Class 1

Exam Cate or Exam Item No:

Exam Descri tion:

B-A B1.40 RPV Head-Flange Weld B-D B-B B-F B-G-2 B-H B-J B3.90 B3.100 B3.110 B3.120 B3.130 B3.140 B2.11 B2.12 B2.31 B2.32 B2.40 B5.40 B5.130 B7.20 B7.30 B7.50 B7.60 B7.70 B8.20 B8.30 B9.11 B9.12 B9.21 RPV Nozzle Vessel Weld RPV Nozzle Inside Radius Pressurizer Nozzle Vessel Weld Pressurizer Nozzle Inside Radius Steam Generator Nozzle Vessel Weld Steam Generator Nozzle Inside Radius Pressurizer Shell Head Welds Pressurizer Long Welds Steam Generator Circ Head Welds Steam Generator Meridional Welds Steam Generator Tubesheet Head Welds Pressurizer Nozzle Safe End Piping - Safe End Pressurizer Bolts, Studs, Nuts Steam Generator Bolts, Studs, Nuts Pressurizer Bolts, Studs, Nuts Pump Bolts, Studs, Nuts Valve Bolts, Studs, Nuts Pressurizer Integral Attachments Steam Generator Integral Attachments Circumferential Pipe Welds Longitudinal Pipe Welds Circumferential Pipe Welds 2.

Quality Group B, ASME Code Class 2

Exam Cate or Exam Item No:

Exam Descri tion:

C-A C-B C-C Cl. 10 C1.20 C1.30 C2.21 C2.22 C2.31 C2.33 C3.10 Shell Circumferential Welds Head Circumferential Welds Tubesheet to Shell Welds Nozzle to Shell (or Head)

Welds Nozzle Inner Radius Section Nozzle Reinforcing Plate Welds Nozzle to Shell Weld Vessel Welded Attachments File RR-14.R10 Page 14 1

x +

C 7W

t ST.

LUCIE UNIT 2 SECOND INSPECTION INTERVAL RELIEF REQUEST NUMBER 14 C3.20 C3.30 Piping Welded Attachments Pump Welded Attachments 3.

Table IWB-2412-1 and IWC-2412-1 With the exception of the examinations that may be deferred until the end of an inspection interval as specified in Table IWB-2500-1, the required examinations in each examination category shall be completed during successive inspection interval in accordance with Table IWB-2412-1 and IWC-2412-1.

ns ection 8+8C '

r'iod am pa~ on eted Ma%a Exam.

"red o e 2nd.

13 1996 17 2000 20 2003 16 50 100 67 100 Note:

(1) Except as noted in Table IWB-2500-1, Bl.30 C.

D.

Successive Inspections IWB-2420(a) and IWC-2420(a)

The sequence of component examinations established during the first inspection interval shall be repeated during each successive inspection interval, to the extent practical.

RELIEF REQUESTED:

Florida Power and Light Company (FPL) requests relief from repeating, the sequence of component examinations established during the first in-service inspection interval, allow an alternative to the requirements contained within Tables IWB-2412-1, IWC-2412-1, and to substitute like examinations on the same or similar lines when radiation dose rates can be lowered significantly. Substitutions to the extent practical will be in accordance with normal scheduling criteria.

BASIS FOR RELIEF:

Since FPL began performing in-service examinations, the rules for radiation

exposure, safety, and the selection and scheduling of in-service examinations have changed significantly.

Examinations in the first in-service inspection interval on Class 1 and 2 components and systems were performed in accordance with the 1980 Edition through the Winter 1980 Addenda of Section XI prorated for the interval.

Vessels, unlike piping systems are unique in that examination areas include several Examination Categories, Examination Item Numbers, and in the case of steam generators cover two Code Classes (Class 1

and Class 2

respectively).

Equal distribution of examinations over three inspection periods on individual vessels (Steam Generators, Pressurizer, etc.),

are complicated due to their unique size, reduction in required examination items and multiple Examination Categories.

Equal distribution imposes an undue hardship in the areas of radiation

exposure, personnel
access, multiple job interference, and adds additional cost without providing a

significant increase in the quality and safety of the plant.

File RR-14.R10 Page 14 2

n V

I ST.

LUCIE UNIT 2 SECOND INSPECTION INTERVAL RELIEF REQUEST NUMBER 14 Previous Examination Results The St. Lucie previous nondestructive (NDE) examination results performed on these same components during the first inspection interval have not identified any flaws that exceeded the acceptance criteria of Section XI, or identify results that would warrant considerati'on of not adjusting the sequence of the examinations, therefore modifying the ISI schedule would have no effect on the safe operation of the plant.

Radiation 10 CFR 20.1101(b) mandates FPL to reduce radiation exposure to as low as reasonably achievable.

In order to satisfy this requirement and other new regulations, FPL must re-evaluate every aspect of every job. Adjusting the sequence of examinations will allow FPL to minimize the amount of work being conducted in radiation areas, meet safety requirements, ALARA requirements, and still meet the intent of Section XI.

Adjusting the sequence of examinations reduce the need for personnel to prepare and examine components in essentially the same areas several times.

The radiation exposure, time, and manpower required to perform these tasks can be significantly reduced by changing the sequence of examinations and the areas to be examined.

St. Lucie has gone through one outage with this altered scheduling criteria.

Insulation Vessel insulation is of a size and shape that the removal process of examination area insulation usually requires a

substantial amount of additional insulation to be removed.

Adhering to the sequence of examinations established during the first interval would require FPL to remove and reinstall the same insulation and scaffolding on two or more occasions.

Removal, storage and reinstallation of the insulation greatly increases the chances of insulation damage and includes additional man-rem and costs associated with the need for personnel to prepare and examine components in essentially the same area several times.

The radiation

exposure, time, and manpower required to perform these tasks can be significantly reduced by changing the sequence of examinations and changing the areas to be examined.

Cost Reduction The cost associated with preparing vessels for selected examinations on the same component, within each inspection period in order to specifically satisfy the percentage requirements of Section XI, is an economic

hardship, without a substantial compensating increase in the quality or safety of the unit.

('xamination Schedules While it is desirable to have examination schedules move forward in the interval (less than 10 years between successive examinations),

the wording of Inspection Program B makes this difficult. A review of Inspection Program B requirements show that it is weighted toward moving examinations to the end of the interval (opposite from USNRC desires.)

The maximum examinations allowed for credit during the 1st period is 34%. If the minimum examinations were performed during the 1st period (16%) and the maximum examined during the 2nd period (67%), then 51% of the interval exams could be performed during the 2nd period. This same thought process can be applied to the 3rd period.

When a sample size in a category is small, Inspection Program B requires examinations to be scheduled later in the interval. Since St. Lucie ISI examinations were originally scheduled one-third each period, it is not possible to move examination schedules forward without scheduling others later in the interval.

File RR-14.R10 Page 14 3

0 I

\\

I

ST.

LUCIE UNIT 2 SECOND INSPECTION INTERVAL RELIEF REQUEST NUMBER 14 Inspection Program B allows up to 50% of the 10 year examinations to be performed during the 2nd or 3rd periods. Allowing this same latitude during the 1st period would enable FPL to perform examinations with a

more efficient schedule, reduce radiation exposure and costs, and meet USNRC desires to have the time frame between successive examinations not exceed 10 year intervals.

Substitutions - examination items scheduled may be substituted for items not previously scheduled in order to reduce the radiation levels.

All substitutions willmeet the selection criteria of the applicable Examination Category, (i.e. terminal ends, high stress welds, etc.),

and shall meet the percentage requirements of inspection program "B". Such changes will be noted in the summary report submittal.

Tables 14-1 through 14-10 provide listings of items'selected for adjustment by Examination Category and provides specific percentages to be achieved during the inspection interval and within each inspection period.

Table 14-11 provides a Category summary for all Code Categories.

ALTERNATIVE EXAMINATIONS OR TESTS:

FPL proposes to adjust the sequence of examinations established within the first inspection interval on the Reactor Pressure

Vessel, Steam Generator and Pressurizer, such that all major examinations are performed at one time within a specified inspection period.

Where practical, FPL has adjusted the sequence of examinations, (additional items) within the same examination categoryg (Shutdown Cooling Water Heat Exchanger, Regenerative Heat Exchanger, etc.)

in order to minimize the variation in the percentage requirements of Inspection Program B.

FPL proposes the following alternatives:

Reactor Pressure Vessel All required examinations will be deferred to the 3rd inspection period, as allowed by IWB-2500-1, in conjunction with the 10-year automated examination activity, with the exception of the shell to flange weld from the seal side and the threads in base material which will be conducted in the First period.

Reactor Pressure Vessel Closure Head All required examinations will be performed in the First inspection period, which willminimize the percentage requirements over the inspection interval.

Steam Generator (primary and secondary sides)

- All required examinations will be performed in the 2nd inspection Period, and with the exception of those areas requiring examination on both generators, performed on steam generator 2A.

Pressurizer

- All required examinations will be performed in the 1st inspection Period.

Shutdown Cooling Water Heat Exchanger All required examinations will be performed in the 3rd inspection Period.

Regenerative Heat Exchanger - All required examinations will be performed in the 2nd inspection period.

The readjusted schedule proposed and the system pressure test will provide continued assurance of an acceptable level of quality and safety.

File RR-14.R10 Page 14 4

+i I

(Q t

ST.

LUCIE UNIT 2 SECOND INSPECTION INTERVAL RELIEF REQUEST NUMBER 14 In lieu of the percentage requirements of IWB-2412-1 and IWC-2412-1, FPL proposes the following variations.

The minor variations between Inspection Program B and the percentages defined below will not significantly affect the health and safety of the general public.

a a'o

.a, ory B-A

  • B-B B-D B-F B J **

B-G-2 C-A C-B C-C ls eLAO 6$

,'4, 6 - 23%

12 - 33%

10 32%

56 31%

I 508 9 298 6

30'h

,nd erj.o

."0 6)l 0

23%

5 12

66%

ll 67%

65

678

,O,0S 8

54%

6 53'h 4

50%

11

85%

rd; Per od f0,0,%

1~00 20 100%

0 100%

12 100%

10 100%

58 100%

0 100%

10 - 100%

7 - 100%

4 100%

3 100%

G.

Note:

Shaded blocks identifies variations to the percentage requirements of Section XI.

Deferral of inspection to the end of interval permissible by IWB-2500-1 The number identified above reflect circumferential weld examinations

only, see Table 14-5 for additional longitudinal weld numbers and overall B-J Category percentages.

Later Editions of XI allows less than 3

items in a

category to be examined in any two periods.

IMPLEMENTATION SCHEDULE The Second In-service Inspection Interval August 8, 1993 to August 8, 2003 ATTACHMENTS TO THE RELIEF:

14-1 Examination Category B-A 14-2 Examination Category B-B 14-3 Examination Category B-D 14-4 Examination Category B-F lIIHIhu'Su'IIIIIG Ku'IQ File RR-14.R10 Page 14 5

0 1

k

e ST.

LUCIE UNIT 2 SECOND INSPECTION INTERVAL RELIEF REQUEST NUMBER 14 14-5 Examination Category B-J 14-6 Examination Category B-H 14-7 Examination Category B-G-2 14-8 Examination Category C-A 14-9 Examination Category C-B 14 10 Examination Category C-C 14-11 Category Summaries File RR-14.R10 Page 14 6

0 P

l C l'

101-101 Flange-Torus 101-171 Lower Shell-Interm. Shell 106-121 Interm Shell-Upper Shell 101-142-A Lower Shell Long Weld 101-142-B Lower Shell Long Weld 101-142-C Lower Shell Long Weld 101-124-A Interm Shell Long Weld 101-124-B Interm Shell Long Weld 101-124-C Interm Shell Long Weld 101-122-A Upper Shell Long Weld 101-122-B Upper Shell Long Weld 101-122-C Upper Shell Long Weld 101-151 Dome-Peel Seg 201-141 Bottom Head-Lower Shell 101-154-A Peel Seg-Peel Seg 101-154-B Peel Seg-Peel Seg 101-154-C Peel Seg-Peel Seg 101-154-D Peel Seg-Peel Seg 101-154-E Peel Seg-Peel Seg 101-154-F Peel Seg-Peel Seg 101-121 Shell-Flange

Code',
,',",'.
"',:."::.';.':.':":":,';Category'-,-";

B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B"A B-A B-A B"A

':Numb'er""-:-"'":

B1.40 Bl.ll Bl.ll B1.12 B1.12 B1.12 B1.12 Bl.12 Bl.12 Bl.12 Bl.12 Bl.12 Bl.21 Bl.21 Bl.22 Bl.22 B1.22 Bl.22 B1.22 Bl.22 B1.30 3rd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 1st and 2nd 1st 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 1st

& 3rd File RR-14.R10 Page 14 7

Examination B-A Continued NOTES Examinations performed in this Category will be in accordance with Section XI, Table IWB-2500-1, the St. Lucie ISI Program, and applicable USNRC approved Requests for Relief. All examinations on the Reactor Pressure Vessel shall be deferred tillthe end of the inspection interval with the exception of the welds associated with the closure head and the shell-to-flange weld, which will be moved to the 1st period.

1 Item will be examined during an earlier period.

19 Item will be examined during a later period 6 Item will be examined during the same period as first interval.

Examination Schedule:

RPV I of 5 Items Items Req'd 26 26 1st.

Period 2nd. Period 3rd. Period Items 8

Items 8

Items 8

16% 34'k 50%

678 1008 100'4 6

23't 0

23't 20 100%

File RR-14.R10 Page 14 8

)Code,"::i;;,':;,':;,",;";::.;-:::,

'
;".',Ca't'e'gory";".,".'.:1st.'"..'::,:I'nt'erv'al

':Schedulem::::,::;:::::;::::-'::,-;.'::g,::.:;

2nd"'.';,';Interval~~",'"
";
'".;=':"

SG-2A-101-254-B Meridional Weld SG-2A-101-251 Staybase-Primary Head SG-2A-202-271 Primary Ext. Ring-Head SG-2A-201-246 Primary Ext. Ring-Tubesheet SG-2A-101-244-B Ext. Ring Long Weld 501-671 Top Head-Upper Shell 101-622-A Upper Shell Long Weld 101-642-A Lower Shell Long Weld 304-671 Lower Shell-Lower Head B-B B-B B-B B-B B-B B-B B-B B-B B-B B2.32 B2.31 B2.31 B2.40 B2.32 B2.11 B2.12 B2.12 B2.11 1st 1st 1st 1st 1st 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 1st 1st 1st 1st Note: Steam Generators Examination Category B-B inspections performed on the primary side were performed on both steam generators during the first inspection interval, and were distributed between all three inspection periods.

Section XI allows performance of all examinations on one vessel among a group of vessels.

Pressurizer Examination Category B-B inspections performed on the pressurizer during the first inspection interval were distributed between the 2nd and 3rd inspection periods.

The pressurizer is contained within the pressurizer cubical with limited access around the vessel.

4 Item will be examined during an earlier period.

5 Item will be examined during a later period No Item will be examined during the same period as first interval.

Examination Schedule:

¹ of

¹ Items Items Req'd 1st.

Period 2nd. Period 3rd. Period Items 8

Items 8

Items

'5 16't 34'h 508 67%

100%

100'k SG Prz Total 30 5

6 4

36 9

0 0%

4 1008 5

100%

0 100%

0 1008 0

1008 4

44'h 5

100%

0 1008 File RR-14.R10 Page 14 9

II

~l

(

IC

XtemRI'dent'i ication~~!:-,-;:=::';4,"::4'~:"4'".:.:'~~i;"~g~""':;:c'.-"~@':::.'-'.-~i".:::."i"'-:':.Code-,'.:,",-',~~;::;:"'::

.'".,"code"~i.':=";;:,.-'-:,: ';;;.1st-;:'..-:Xiit'equal',:::;:::::.'.:~."~j.:::.::,.'.;2nd:;-'.-.:~Interval".;".::;,".,'..;::

,,"X.hem',".~;.,':.:;-',:...,'- ';:;Sche SG-2A-ON-IR-B Outlet Nozzle SG-2B-IN-IR Inlet Nozzle IRS SG-2B-ON-IR-A Outlet Nozzle IRS SG-2B-ON-IR-B Outlet Nozzle IRS 108-601-A Safety Valve Nozzle 108-601-B Relief Nozzle-Vessel 108-601-C-Safety Noz-Vessel 108-601-D Safety Noz-Vessel 105-651 Surge Noz-Vessel SVN-IR-A Safety Nozzle IRS RVN-IR Relief Nozzle IRS SVN-IR-B Safety Nozzle IRS SVN-IR-C Safety Nozzle IRS SRGN-IR Surge Nozzle IRS B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B3.140 B3.140 B3.140 B3.140 B3.110 B3.110 B3.110 B3.110 B3.110 B3.120 B3.120 B3.120 B3.120 B3.120 1st 3rd 3rd 3rd 2nd 2ND 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 2nd 1st 1ST 1st 1st 1st 1st 1st 1st 1st 1st NOTES Reactor Pressure Vessel Examination Category B-D nozzles and inner radius examinations are addressed in USNRC approved Request for Relief 17.

Steam Generators - Examination Category B-D examinations on the primary side were performed on both steam generators during the first inspection interval, and were distributed between all three inspection periods.

File RR-14.R10 Page 14 11

EXAMINATIONCATEGORY B-D Continued Notes:

Pressurizer Examination Category B-D examinations on the pressurizer during the first inspection interval were distributed between the 1st, 2nd and 3rd inspection periods.

The pressurizer is contained within the pressurizer cubical with limited access on both the top and bottom heads.

The pressurizer include such items as lifting lugs,

manways, safety, relief and spray nozzles (top head) and the surge and heater nozzles (bottom head),

which are in close proximity of each other that makes distributing them equally over the interval impractical.

Code required coverage and limitations associated with the nozzle examinations are included within the USNRC approved Request for Relief 3. In addition FPL feels that the nozzles on the top head should receive a refracted longitudinal examination during the 1st period as a direct result of the conversation between FPL and USNRC Staff during the pressurizer nozzle repair activity.

16 Item will be examined during an earlier period.

18 Item will be examined during a later period 2 Item will be examined during the same period as first interval.

Examination Schedule:

¹ of

¹ Items Items Req'd 1st.

Period 2nd. Period 3rd. Period Items 8

Items 8

Items 8

168 34%

50% 67'5 100%

1008 RPV PRZ SG 12 12 12 12 12 12 0

0'k 0

OS 12 100%

12 1008 0

1008 0

100%

0 0'k 12 100%

0 100%

Total 36 36 12 33'h 12 66'h 12 100%

File RR-14.R10 Page 14 12

':.:Xt'em!'I'dents fi cation'.".-;

':::P,,'=,'<;":;::'l '-':::;-:;:

Code".'",
:-:,.":;,'~::;..:,'j>>=': ':1'st:':,":::;."-;,':I'n'terva3,".'".:

"Schedul'e'.".':::.'.;.i'=,';:~~~'.

"'2nd"y,::Xnte'r'va'll>.-'"':'-.'-":,";.>.:;'C-115-1501-771-A Elbow-Safe End RC-121-1501-771-B Elbow-Safe End RC-121-901-771 Safe End-Pipe RC-112-1501-771-C Elbow-Safe End RC-301-771 Nozzle-Safe End RC-501-771 Nozzle-Safe End 503-671-B Safety Noz-Flange 503-671-C Safety Noz-Flange RC-514-671 Safe End-Nozzle RC-506-671 Nozzle-Safe End B-F B-F B-F B-F B-F B-F B-F B-F B5.130 B5.130 B5.130 B5.130 B5.130 B5.130 B5.40 B5.40 B5.40 B5.40 1st 1st 1st 1st 2nd 1st

,3rd 2ncl 2nd 3rd 2ncl 2nd 2nd 2nd 1st 2nd 1st 1st 1st 1st Note:

5 Item will be examined during an earlier period.

5 Item will be examined during a later period 21 Item will be examined during the same period as first interval.

Examination Schedule:

PRZ OTHER Total

¹ of ¹ Items Items Req'd 27 27 31 31 4

100%

6 22%

0 100'b 0

100%

ll 62%

10 100%

10 32'h ll 67'b 10 100%

1st.

Period 2nd. Period 3rd. Period Items 8

Items 8

Items 8

168 34%

508 67'k 100%

100'b File RR-14.R10 Page 14 13

401-128-A Outlet Nozzle-Ext.

401-128-B Outlet Nozzle-Ext.

RC-114-201-258 Nozzle Ext.

RC-115-401-258-B Nozzle-Nozzle Ext.

RC-115-1 Nozzle Ext-Elbow RC-115-103-742-LS-A Long Seam RC-115-103-742-LS-B Long Seam RC-112-401-258-A SG Nozzle-Nozzle Ext.

RC-114-1 Outlet Nozzle Ext.-Pipe RC-114-101-722-LS-A Pipe Long Seam RC-114-101-722-LS-B Pipe Long Seam RC-123-1 Nozzle Ext.-Pipe RC-101-FN-1 Safe end-Pipe RC-101-1-SW-13 Pipe-Tee RC-122-EW-1 Safe end-Pipe CH-147-SW-45 Pipe-Valve RC-148-SW-2 Valve-Pipe RC-148-EW-1 Pipe-Safe end

,':.'-Categ~ory-:N B-J B-J B-J B-J B"J B-J B-J B-J B-J B-J B-J B-J B-J B-J B"J B-J B-J Code""'N:4 v:.:.

Numb'er'.":-';-i':."":.';::

B9.11a B9.lla B9.11a B9.11a B9.11b B9.12 B9.12 B9.11a B9.lid B9.12 B9.12 B9.lid B9.lid B9.11d B9.21b B9.21a B9.21b B9.21c

-'1st~':;-::Xiiterv'al'-.":.::-;-';;

1st 1st 1st 2nd 2nd 2nd 2nd 1st 1st 1st 1st 1st 3rd 3rd 3rd 2nd 2nd 2nd

2nd';@<:I'rite'rva1"'m.':;";-;.,;;..-

.Sche'duleg~.4-:.:'"":4.;;'.'IF::i'-;;.

2nd 2nd 3rd 3rd 3rd 3rd 3rd 3rd 2nd 2nd 2nd 2nd 1st 1st 1st 3rd 3rd 3rd File RR-14.R10 Page 14 14

I I

C /

p 41

EXAMINATIONCATEGORY B-J Continued Note: There are 531 circumferential welds and 64 longitudinal welds within this Examination Category for a total of 595 items.

Minimum circumferential examinations required (531 x

.25

=

132.75) or (133 circumferential weld items required to be examined during this inspection interval).

There are 179 circumferential weld items scheduled for examination.

3 Items will be examined during an earlier period.

15 Items will be examined during a later period 197 Items will be examined during the same period as first interval.

Examination Schedule:

I of 5 Items Items Req'd 1st.

Period 2nd. Period 3rd. Period Items 8

Items 8

Items 8

168 34'h 50%

678 1008 100'h Circ Welds 531 179 Long Welds 64 36 56 31%

10 27%

65 67%

18 77%

58 100%

8 1008.

Totals 595 215 66 30%

83 69'h 66 100'h File RR-14.R10 Page 14 15

'Co'de:.g<<.;".:".:'.,:,".,p",;":.'...Code'~(+pi': 5'1s t':,: :;::Xntery'al;!'::",::,.': ",.:.:2nd"-;;,':; Xiii'cry'a1-g>';-;::~:;:

103-651 Support Skirt SG-2A-109-251 Support Skirt-Stay Base SG-2B-109-251 Support Skirt-Stay Base B-H B-H B-H B8.20 B8.30 B8.30 2nd Not Examined 3rd 1st 2nd Not Required Note:

(1)

Four welded pads were added to the steam space nozzle outside surfaces during the last outage.

In accordance with IWB-2420(b) these welded pads will be re-examined for the next 3 inspection periods, starting with the 2nd inspection period. Not included within the count, as normally these nozzles would be excluded from the volumetric and surface examination requirements of Table IWB-2500-1.

(2)

Steam Generator 2A's welded attachment will be substituted for Steam Generator 2B's welded attachment.

SG2A was not examined during the first inspection interval. Steam Generator 2B's welded attachment was examined in the 3rd period of the first inspection interval. In the case of multiply

vessels, the examination is limited to the attachment weld of one vessel.

(3)

Later Code Editions allows Categories with less than 3 items to be examined in any two inspection periods in lieu of the percentage requirements of Table IWB-2412-1.

1 Item will be examined during an earlier period.

No -Items will be examined during a later period No Item will be examined during the same period as first interval.

1 Item Steam Generator 2B will be substituted for Steam Generator 2A.

Examination Schedule:

Code Category

¹ of

¹ Items Items Req'd 1st..Period 2nd. Period 3rd. Period Items 8

Items

'h Items 8

16% 34%

50%

67$

1008 100'h PRZ (1)

SG A&B (2)

TOTAL 1

1 2

1 3

2 1

100%

0 0%

0 100%

1 100'k 0

100%

0 100%

1 50%

1 100$

0 100%

File RR-14.R10 Page 14 16

,Xt'em:,::I'de'nti'fi'cation'~~mWj <<j~'.':"j;""'-""'.':::..,";;--::::-";-":::,:,-.-";-';-.',"-:'-:;.';::':,,"-::

,::;Category,;: >~
Code;;;
,'.:jj';:":::;.".-:;:'.".-'::lst:-,'.::;::In't'e'rval:';:=.':;::.."::;-;".:,:.,

i:;Hi'uTw SG-2A-PMS-A Manway Studs SG-2A-PMN-A Manway Nuts SG-2A-PMS-B Manway Studs SG-2A-PMN-B Manway Studs SV-1200 Safety Valve-Flange SV-1201 Safety Valve-Flange SV-1202 Safety Valve-Flange MS-01 Manway Studs MN-01 Manway Nuts V-3258 Bolting V-3217 Bolting B-G-2 B-G-2 B-G-2 4

B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B7.30 B7.30 B7.30 B7. 30 B7. 50 B7.50 B7. 50 B7. 20 B7. 20 B7. 60 B7.70 1st 1st 1st 1st 3rd 3rd 3rd 3rd 3rd-3rd 2nd 3rd 3rd 3rd 3rd 1st 1st 1st 1st 1st 1st 1st Note: There are 4 groups of valves for which bolting is limited to components selected for examination under Category B-M-2, and only when disassembled or end of inspection interval, whichever comes first. These are not be added to the count.

The number of valves associated with each group are as follows:

Group 1

Group 2

Group 3

Group 4

4 valves 4 valves 5 valves 4 valves 1 Required 1 Required 1 Required 1 Required 7 Item will be examined during an earlier period.

4 Item will be examined during a later period 16 Item will be examined during the same period as first interval.

4 Items will be added when selected within the valve groups identified above.

File RR-14.R10 Page 14 17

I C

I'

~

Examination Schedule:

EXAMINATIONCATEGORY B-G-2 Continued g of g Items Items Req'd 1st.

Period 2nd. Period 3rd. Period Items

'h Items 8

Items 8

168 34%

508 67%

100%

100%

RPV PRZ SG PIPING VALVES 10 10 2

2 8

4 11 ll 17 4

2 20%

0 208 8

2 100%

0 100%

0 0

0%

4 100%

0 5

45%

4 81'h 2

To be added when selected 100%

100'h 100%

100%

under B-M-2 or end of interval TOTAL 48 31 9

29'h 8

54%

10 100%

File RR-14.R10 Page 14 18

I-tern'
.,I'den'ti'fication";
:',:j'";:.!."'.',-;'.:>>

';:.Category~

SG-2A-203-246 Ext. Ring-Tubesheet SG-2A-101-241 Ext.'ing-Lower Shell SG-2A-101-221 Cone-Upper Shell SG-2A-201-271 Top Head-Upper Shell SG-2A-106-201 Dome-Torus SG-2A-204-246 Stay-Tubesheet 1-2701 Flange-Body 1-2701 Body-Tubesheet C-A C-A C-A C-A C-A C-A C-A C-A C1.30 C1.10 C1.10 C1.20 C1.10 C1.30 C1.10 C1.30 1st 1st 3rd 3rd 3rd 3rd 3rd 3rd 2nd 2nd 2nd 2nd 2nd 2nd 1st 1st Note: Steam Generators Examination Category C-A, No examinations were conducted on the secondary side of steam generator 2B during the first inspection interval. All examinations were performed on steam generator 2A, and were distributed evenly between the three inspection periods.

Section XI allows performance of all examinations on one vessel among a group of vessels.

Where substitutions could be made (Shutdown Cooling Water Heat Exchanger, Regenerative Heat. Exchanger, etc.),

examination areas were adjusted to minimize the variation to the percentage requirements of Inspection Program B.

Shutdown Cooling Water Heat Exchanger Two items in the Shutdown Cooling Heat Exchanger were moved to the 1st inspection period, in order to minimize the variation in the percentages required by Inspection Program B.,

6 Items will be examined during an earlier period.

2 Items will be examined during a later period 1

Items will be examined during the same period as first interval.

6 Items added new during this interval File RR-14.R10 Page 14 19

1 Ji

Examination Schedule:

EXAMINATIONCATEGORY C-A Continued 5 of I Items Items Req'd 1st.

Period 2nd. Period 3rd. Period Items 8

Items 8

Items 8

16%

348 50'k 67%

1008

100%'G SCHx RGx 16 7

4 2

11 6

0 0%

2 100$

0 OS 7

100'h 0

1008 0

0'k 0

100%

0 1008 6

100'h TOTAL 31 15 2

13%

6 53%

7 100$

File RR-14.R10 Page 14 20

C pCt

='Category"-',"',
",Co'de~;~,'
-."'::;":,",::::;.;:1'st':."".Int'email:.;.':':;g'.;:.

I:;S'ch'edule"';'.:,"..-",,',,".,!',l~-:.'.;.,";

SG-2A-105-201 Steam Nozzle-Head SG-2A-105-201-1R Steam Nozzle Inner Radius 1-2741-1 Nozzle-Vessel 1-2742-1 Nozzle-Vessel 1-2742-2 Pad-Vessel 1-2742-3 Pad-Vessel 1-2741-3 Pad-Vessel 1-2741-2 Pad-Vessel C-B C-B C-B C-B C-B C-B C-B C-B C2.21 C2.22 C2.33 C2.33 C2.31 C2.31 C2.31 C2.31 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 2nd 2nd Each Period

  • Each Period
  • 3rd 3rd 3rd 3rd Note:

2 Item will be examined during an earlier period.

0 Item will be examined during a later period 6 Item will be examined during the same period as first interval.

2 Items require a VT-2 examination every period, these items are not included within the count.

Examination Schedule:

SG SCHx TOTAL I of I Items Items Req'd 8

4 12 4

20 8

0 08 0

OS 4

1008 0

OS 0

100%

4 100%

0 0'b 4

50%

4 100%

1st.

Period 2nd. Period 3rd. Period Items 8

Items 8

Items 8

16%

34%

50%

67%

100%

100'b File RR-14.R10 Page 14 21

0 V
,;Code'
:;::-..::;::::,':,.':-,':,:::-,':,".:,':

'a'kg'or'y::.":.-'."::

.co'de
;;",.-",::r;.,",;:::'..".'-'",j (1s t.-"';:.":;I'ntervaI;::-':;.:'",:::.:;". ';

'edule';.:."'=;,',"':

'w -:"PA k'.c'.,:R:.xe. <A4@<:,'..c.'.".,i:.'::g:,:.'::::Cciv. "

':2nd::",:

Xnterval:.,:;;",-':'G-2A-103-221-A Key Bracket SG-2A-104-221-A Clevis Bracket SG-2A-104-221-C Clevis Bracket SG-2A-104-221-D Clevis Bracket SG-2A-105-221-B Support Bracket BF-4007-6081 Welded Attachment BF-4006-6076 Welded Attachment SI-2413-352 Shear Lugs C-C C-C C-C C-C C-C C-C C-C C-C C3.10 C3.10 C3.10 C3.10 C3.10-C3.20 C3.20 C3.20 1st 1st 3rd 3rd 3rd 2nd 3rd Not Examined 2nd 2nd 2nd 2nd 2nd 1st 1st 1st Note:

5 1tems"will be examined during an earlier period.

2 Items will be examined during a later period 12 Items will be examined during the same period as first interval.

1 Items were added new during this interval Examination Schedule:

EXAMINATIONCATEGORY C-C Continued Code Category I of I Items Items Req'd 1st.

Period 2nd. Period 3rd. Period Items 8

Items 8

Items 8

16'k 34%

50% 67%

100'4 100%

SG PIPING CSP 16 8

23 9

6 3

0 0'k 8

100%

0 1008 6

66%

3 100%

0 100%

0 0%

0 0%

3 100%

TOTAL 45 20 6

30%

11 80%

3 100%

File RR-14.R10 Page 14 22

C

CATEGORY SUMMARIES EOR ST.

LUCIE UNIT 2 Table 14-11

Examen, o

Cate ory B-A B-B B-D e

o Componen s

Bein Exami'ne'd Ear'1 16 e

o Componen 8

Sch'eduled the Same a

theNFirs Interva N

er o Component s

Bein Examined Kite 19 18 B-E B-F B-G-1 B-G-2 B-H Examinations performed in this Category will be in accordance with Section XI, The St. Lucie ISI Program, and applicable relief requests 21 Examinations performed in this Category will be in accordance with Section XI, The St. Lucie ISI Program, and applicable relief requests 20 B-J 197 15 B-K-1 B"L-1 B-L-2 B-M-1 B-M-2 B-N-1 B-N-2 B-N-3 B-0 B-P B-Q Examinations performed in this Category will be in accordance with Section XI, The St. Lucie ISI Program, and applicable relief requests Examinations performed in this Category will be in accordance with Section XI, The St. Lucie ISI Program, and applicable relief requests File RR-14.R10 Page 14 23

CATEGORY SUMMARIES FOR ST.

LUCIE UNIT 2 Table 14-11 Continued xamxna o

.a ego C-A C-B C-C N'

of Componen s

Bei'ng xamine a

1, umbe o

o onen s Scheduled t e Same s

heeeFiP' o>