L-95-310, Submits SG Tube Plugging Rept,Including Number of Tubes Plugged During Fall St Lucie Unit 2 Refueling Outage,Per St Lucie Unit 2 TS 4.4.5.5.a

From kanterella
(Redirected from L-95-310)
Jump to navigation Jump to search
Submits SG Tube Plugging Rept,Including Number of Tubes Plugged During Fall St Lucie Unit 2 Refueling Outage,Per St Lucie Unit 2 TS 4.4.5.5.a
ML17228B329
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/20/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-310, NUDOCS 9511280234
Download: ML17228B329 (3)


Text

F'R.IC) R.I EY' ACCELERATED RIDS PROCESSING)

"REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) a%

ACCESSION NBR: 9511280234 DOC. DATE: 95/11/20 NOTARIZED: NO FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.

AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

I

SUBJECT:

Provides info re St Lucie Unit 2 TS 4.4.5.5.a

& SG Tube Plugging Rept.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

DOCKET 05000389 RECIPIENT ID CODE/NAME PD2-1 LA NORRIS,J INTERNAL: ACRS NRR/DE/EMCB NRR/DS SA/S PLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-1 PD CENTER NRR/DRC HICB NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTI-IEDOCUMENTCONTROL DESK, ROOM Pl 37 (EXT. 504 2083 ) TO ELlikII.PATE YOUR NAME PRO il DISTRIBUTIONLISTS I'OR DOCL'MENTS YOU DON I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL 17

Florida Power &Light Company, P.O. Box128, Fort Pierce, FL34854-0128 November 20, 1995 L-95-310 10 CFR 50.36 10 CFR 50.4 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re:

St. Lucie Unit 2 Docket No. 50-389 Special Report Steam Generator Tube Plu in Re ort This letter is being sent pursuant to St. Lucie Unit 2 Technical Specification 4.4.5.5.a.

The following number of tubes were plugged during the Fall Unit 2 refueling outage:

Steam Generator 2A 5

Steam Generator 2B 11 Should you have any questions on this information, please contact us

~

Very truly yours, AALU D. A.

a er Vice sident St. Lucie Plant DAS/GRM cc:

.Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant p jAgn,~

9511280234 951 1'20

'DR ADOCK 05000389 i'e~M~lt'DR-an FPL Group company

P II