Text
DOCKET
05000335
05000389
SUBJECT:
Forwards insp repts
50-335/92-21
& 50-389/92-21
& notice of
violation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9301070280
DOC.DATE: 92/12/23
NOTARIZED: NO
CIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME
AUTHOR AFFILIATION
SINKULE,M.V.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
GOLDBERG,J.H.
Florida Power
& Light Co.
D
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: ACRS
AEOD/DEIB
AEOD/TTC
NRR MORISSEAUiD
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9H
NRR/PMAS/ILRB12
NUDOCS-ABSTRACT
OGC/HDS3
RGN2
FILE
01-
EXTERNAL: EG&G/BRYCEgJ.H.
COPIES
LTTR ENCL
1
1
2
'2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
NORRIS,J
AEOD/DSP/TPAB
DEDRO
NRR/DLPQ/LHFBPT
NRR/DOEA/OEAB
NRR/PMAS/ILPB
NRR/PMAS/PDTSB
OE DIR
~REGQ+~L
0 2
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
- 1
1
1
1
1
D
D
R
D
A
D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACI'FIE DOCUMENT CONTROL DESK,
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
D
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL,
25
'
DEC 23 l992
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
& Light Company
ATTN:
J.
H. Goldberg
President
- Nuclear Division
P. 0.
Box 14000
Juno
Beach,
33408-0420
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NOS. 50-335/92-21
AND 50-389/92-21)
This refers to the inspection
conducted
by S.
A. Elrod of this office on
October
20 - November 23,
1992.
The inspection, included
a review of
activities authorized for your St.
Lucie facility.
At the conclusion of the
inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed report.
'ontainment
vessel
integrity issues
were subsequently
discussed
with your
staff during
a telephone
conference
on December
1,
1992 between myself and Hr.
G. Boissy of your staff.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews wi.th personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violation is of concern
because it reflects your
misunderstanding
of your Technical. Specification requirements
in the area of
containment integrity.
In addition, the enclosed
Inspection
Report identifies
activities that violated
NRC requirements
that will not be subject to
enforcement
action
because
your efforts in identifying and/or correcting the
violation meet the criteria specified in Section VII.B of the Enforcement
Policy.
Your attention is invited to an unresolved
item identified in the inspection
report.
This matter will be pur'sued during future inspection.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements,
9301070280
921223
ADOCK 05000335
8
Z Eo!
Florida Power.
5. Light Company
2
DEC 23 SB2
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room,
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures'f
the. Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No.96-511.
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
rich,q: Stum N
Af"ViHV. 'SINÃQtE
Marvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosures:
2.
NRC Inspection
Report
cc w/encls:
D. A. Sager
Site Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
R.
E. Grazio, Director
Nuclear Licensing
Florida Power
and Light
Company'.
0.
Box 14000
Juno
Beach,
FL
33408-0420
G. J.
Boissy
Plant General
Manager
St.
Lucie Nuclear Plant
P. 0.
Box 128
.
Ft. Pierce,
FL
34954-0128
Harold F. Reis,
Esq.
Newman
L Holtzinger
1615
L Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector and Davis
400 Southeast
Financial
Center
Miami,
FL
33131-2398
cc w/encls cont'd:
See
page
3
'
Florida Power
5 Light Company
cc w/encls cont'd:
Jacob Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
2600 Blair Stone
Road
Tallahassee,
FL
32301
Jack Shreve
Public Counsel
c/o The Florida Legislature
111 West Nadison Avenue,
Room 812
Tallahassee,
FL
32399-1400
Robert
G. Nave, Director
Emergency
Management
- 2740 Centerview Drive
Tallahassee,
FL
32399-2100
James
V. Chisholm
County Administrator
St.
Lucie County
2300 Virginia Avenue
Fort Pierce,
FL
34982
Charles
B. Brinkman
Washington'Nuclear
Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Suite
330
Rockville,
HD
20852
bcc w/encls
K. Landis, RII
J. Norris,
Document Control
Desk
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
7585 South
Highway AIA
Jensen
Beach,
FL
33457
RI
KL
is
1 2/g/92
DEt: 23 tm