ML17223A634
| ML17223A634 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/03/1990 |
| From: | Norris J Office of Nuclear Reactor Regulation |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| References | |
| GL-88-20, TAC-74473, TAC-74474, NUDOCS 9005070393 | |
| Download: ML17223A634 (3) | |
Text
V Docket Nos.
50-335 and 50-389 Mr. J.
H. Goldberg Executive Vice President Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420
Dear Mr. Goldberg:
May 3, 1990 DISTRIBUTION Docket File NRC 8
LPDRs PD22 Rdg File SVarga 14/E/4 GLainas 14/H/3 DMiller JNorris OGC EJordan MNBB-3302 ACRS(10)
MSinkule RII HBerkow MBoy le 13/H/3 JFlack NLS-324
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUALPLANT EXAMINATIONS (IPE) - TAC NOS.
74473 AND 74474 - ST.
LUCIE I AND 2 Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder:
(I) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This informa'tion was to be submitted to the NRC within 60 days of issuance of Supplement I of the generic letter.
We have reviewed your letter dated October 31, 1989, submitted in response to the reporting requirements of the generic letter.
We conclude that your IPE
- approach, methodology and schedule are acceptable.
We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Program, will not have any adverse effect on your schedule.
However, if your schedule should
- change, please notify the NRC of the proposed change and the reason for the change.
Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, RES at (301) 492-3979.
Sincerely, Original signed by 9005070393 900503 PDR ADOCK 05000335 P
PDC cc:
See next page Jan A. Norris, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation OFC:LA:PDII-2:PM' I 2:D:PDII-2 W
W NAME
- J o
is jkd:H er W
/DATE
- 05/
/90
- 05/ 5/90
- 05/
/90 0 FICIAL RECORD COPY Document Name:
GL 8820/ST.
LUCIE
I II ~
P
~,
't
'I 4
R
'I II e
W I
I
'ff J
1 I ~
I I
I
'I
~ I
~'
II I
I
'I 2 p
I' I
I
')
I lit W e',
SI.5,II II c
1' e
a
(
il I II
Mr. J.
H. Goldberg Florida Power
& Light Company St.
Luc~e Plant CC:
Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.
Hwy AIA Jensen Beach, Florida 33457 State Planning
& Development Clearinghouse Office of Planning
& Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.
Newman
& Holtzinger 1615 L Street, N.W.
Washington, DC 20036 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St. Lucie County 2300 Yirginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockv i 1 1 e, Mary land 20852 Mr. Jacob Oaniel
- Nash, Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Ta 1 1ahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323