ML17223A226
| ML17223A226 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/10/1989 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17223A227 | List: |
| References | |
| NUDOCS 8907210062 | |
| Download: ML17223A226 (4) | |
See also: IR 05000335/1989013
Text
AC CELEBRATED
DISTKBUTION
DEMO.iSTRAT10N
SYFI ZM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8907210062
DOC.DATE: 89/07/10
NOTARIZED: NO
FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie P3,ant, Unit 2, Florida Power
& Light Co.
AUTH.NAME
AUTHOR AFFILIATION
EBNETER,S.D.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
'OODY,C.O.
F1orida Power
& Light Co.
DOCKET g
05000335
05000389
R
I
SUBJECT:
Forwards
SALP Repts 50-335/89-13
& 50-389/89-13 for period
.
Nov 1987
Apr 1989.
DISTRIBUTION CODE:
IE40D
COPIES
RECEIVED:LTR J
ENCL J
SIZE:
TITLE:,Systematic Assessment, of-Licensee performance
(SALP) Report,
~ I'
~
4
y
~
NOTES:
D
.S
RECIPIENT
ID CODE/NAME
PD2-2 LA
NORRIS, J
INTERNAL: ACRS
AEOD/DSP/TPAB
DEDRO
NRR/DLPQ/HFB 10
NRR/DOEA/EAB 11
NRR/DREP/RPB
10
t
NRR/DRIS/SGB
9D
NRR/PMAS/ILRB1 2
OE-D
~WE
tJ
EXTERNAL: L ST LOBBY WARD
NRC PDR
COPIES
LTTR ENCL
'
0
1
1
2
2
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD2-2
AEOD/DOA
COMMISSION
NRR SHANKMAN,S
NRR/DLPQ/PEB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NRR/DRIS/SIB 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN2
FILE
01
LPDR
COPIES
LTTR ENCL
1
1
1
1
5
5
1
1
1
1
1
1
1
1
1
1
.
1
1
1
1
1
1
1
1
1
1
D
S
R
NOTE TO ALL t'RIDSn RECZPKEPIS
PIZASE HELP US TO REMCE %MTE!
CGtGRCI ~ DOCU'NEÃZ CONTROL DESK
RXN Pl-37
(EZT. 20079) I EL'iZMQQZB KUR NAME PKN DISTRIBVTICN
IZSTB KK DOCUMENTS VXJ DON'T NEEDf
AL NUMBER OF COPIES
REQUIRED:
LTTR
33
ENCL
32
D
S
Docket Nos. 50-335,
50-389
License
Nos.
JUL t 0 1989
Florida Power and Light Company
ATTN:
Mr. C. 0.
Woody, Acting
Senior Vice President
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT
NOS. 50-335/89-13
AND 50-389/89-13
The
NRC Systematic
Assessment
of Licensee
Performance
(SALP) has
been
completed
for your St.
Lucie facility.
The facility was
evaluated
for the
period
November I,
1987 through April 30,
1989.
The results of the evaluation
are
documented
in the enclosed
Interim
SALP Report.
This report will be discussed
with you at
a public meeting
to
be
held at the
St.
Lucie facility on
July 18,
1989, at 10:00 a.m.
The
performance
of your St.
Lucie facility was
evaluated
in the functional
areas
of Plant Operations,
Radiological
Controls,
Maintenance/Surveillance,
Emergency
Preparedness,
Security,
Engineering/Technical
Support,
and
Safety
Assessment/guality
Verification.
Although the
functional
areas
evaluated
during this
assessment
period
are
not identical
to those
in the previous
period,
a close correlation
can
be made for identifying changes
in. performance.
The ratings were essentially
unchanged
from the previous
assessment
period with
an improving trend noted in the area of Radiological Controls.
Overall
performance
of the
St. Lucie facility was
excellent
during this
assessment
period
and your staff should
be
commended for achieving this high
level of performance.
However, there is still room for improvement in several
of the rating categories
and
we encourage
you to pursue
these
with added
attention to detail.
Any comments
you
have
concerning
our evaluation
of the
performance
of your
St. Lucie facility should
be submitted to this office within 30 days following
the date of our meeting.
These
comments will be considered
in development of
the
Final
SALP Report.
, Your comments
and
a
summary of our meeting will be
issued
as
an appendix to the Final
SALP Report.
Should
you
have
any questions
concerning
this letter,
we will be
glad to
discuss
them with you.
Sincerely,
Original signed
by
39072i0062 3907io
ADOCK 05000 "35
Q
Enclosure:
(See
page
2)
Stewart
D. Ebneter
Regional Administrator
~go
Power
and Light Company
Enclosure:
Interim SALP Report - St. Lucie
cc w/encl:
D. A. Sager,
Vice President
St. Lucie Nuclear Plant
G. J. Boissy, Plant Manager
J.
B. Harper, Site
QA Superintendent
State of Florida
bcc w/encl:
i L.
W. 2ech,
Chairman
/ T.
M. Roberts,
Commissioner
K. M. Carr, Commissioner
/ K. C. Rogers,
Commissioner
/ J.
R. Curtiss,
Commissioner
/ R.
W. Borchardt,
/ J.
N. Taylor,
DEDR
, H. L. Thompson, Jr.,
DEDS
~ T.
E. Nurley,
.S.
Varga,
. H. Berkow,
Regional Administrators, RI, RIII
RIV, and
RV
R. Nease,
SALP Coordinator,
K. Clark, RII,
PAO
M. Sinkule,
R. Crlenjak,
S. Vias,
P.
Madden,
K. Landis, Chief,
J. Norris,
IMPELL
NRC Resident
Inspector
Document Control
Desk
JUL i 0
>98s
RII
'RII
WPoertner
SVias
07/7 /89
07/
/89
RII: A
nst
07/I /89
.RII-
('y I-)
JCrl enjak
07/')/89
MSi nkul e
07/) /89
RII
RII
RII
AGi
on
WCline
ehl
07
89
07/T /89
07/
/89