April 22, 1988 Dqck t Nos.

50-335 and 50-389 Mr.

W. F.

Conway Acting Group Vice President Nuclear Energy Florida Power and Light Company Post Office Box 14000 "Juno Beach, Florida 33408

Dear Mr. Conway:

DISTRIBUTION C6oc%e.t F)Te&

NRC 5 Local PDRs PDII-2 R/F SVarga GLainas DMi 1 'ler DLasher ETourigny OGC-WF EJordan JPartlow ACRS(10)

Gray File

SUBJECT:

RE(}VEST FOR ADDITIONAL INFORMATION - ATWS ITEM 2.2 (PART I)

OF GENERIC LETTER 83-28'OR ST.

LUCIE PLANT (TAG NOS.

53718 ANDi53719) t In conducting our review of, your November 8, 1983 and May 26, 1987 submittals relating to the above subject, we have determined that we will need additional information identified'n the enclosure to continue our review.

In order for us to maintain, our., review schedule, your response is requested within 45 days of the date of this letter.

If you cannot provide a full response within the r'equested time, please provide your full response schedule within 30 days of the'date of this letter.',

l.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Please contact me at (301) 492-1474 if your ha've any questions concerning this letter.

S incere ly, Original signed by

Enclosure:

Request for Additional Information cc w/enclosure:

See next page E.

G. Tourigny, Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation Db 04 $

68 P

rigny bd 04/pM8

PD 1-2 HBerkow 04~/88 8804290058 880422 PDR ADOCK 05000335 P

QPDR

fff

~

e l,

I I

II lu C

t I

Mr.

W. F.

Conway Florida Power 5 Light Company St. Lucie Plant CC:

Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.

NRC 7585 S.

Hwy A1A Jensen Beach, Florida 34957 State Planning 5 Development Clearinghouse Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.

Newman 5 Holtzinger 1615 L Street, N.W.

Washington, DC 20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington - Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue

Bethesda, Maryland 20814 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tal'Iahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Mariet ta Street N.W., Suite 2900 Atlanta, Georgia 30323

ENCLOSURE ST.

LUCIE PLANT, UNITS 1

& 2 DOCKET NOS. 50-335/389 REQUEST FOR ADDITIONAL INFORMATION FOR GENERIC LETTER 83-28, ITEM 2.2 (PART 1)

The licensee for the,St.

Lucie Plant, Units 1, 2 responded to Item 2.2 (Part

1) of Generic Letter 83-28 by submittals dated November 8, 1983 and May 26, 1987.

The staff has reviewed these responses and finds additional information is needed for some of the sub-items of Item 2.2 (Part 1).

The review guidelines used by the staff for this sub-item are listed below, followed by a brief evaluation of the licensee's submittal, and a listing of what the staff concludes is necessary to complete this item.

Item 2.2. 1.2 Information Handlin S stem Re vested Information The licensee should confirm that the program for classification of safety-related equipment includes an information handling system that is used to identify safety-'related components.

The response should confirm that this information handling system includes a listing of safety-related equipment and components and that procedures exist which govern its development, verification and validation.

Evaluation The licensee's response states that a master safety-related equipment list is not maintained but that safety-related components are identified in the

FSAR, PSI Diagrams, Valve Lists, and Instrument Lists.

.These lists and drawings were developed during plant design and construction and are now maintained as controlled documents.

The approval authority for revising specific technical,

fSAR, and PC/M items impacting the quality program is vested in the FPL engineering organization.

The licensee's program includes an information handling system which contains several lists that identify safety-related items.

The submittal does not make clear that these lists are complete to the component level, that they do not overlap or conflict, and that these lists are governed by identical criteria and procedures so that the listings are maintained and distributed to users as a complete, official, consistent and unambiguous source of classification information for all safety-related components.

Conclusion The licensee's response is not complete.

They should confirm that the lists are complete to the component level, they do not overlap or conflict, and these lists are governed by identical criteria and procedures so that the listings are maintained and distributed to users as a cofhplete, official, consistent and unambiguous source of classification information for all safety-related components.