Text
i ACCESSION NBR FAC IL:
50-389'UTH.
NAME WOODY> C ~ O.
REC IP. NAME REQUL~RY INFORMATION DISTRIBUTI
. SYSTEM (RIDS) 8802170138 DOC. DATE: 88/02/10 NOTARIZED:
NO St.
Lucie Planti Unit 2I Florida PoUJer 5 Light Co.
AUTHOR AFFlLIATION Florida Poeer 5 Light Co.
RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 8 05000389
SUBJECT:
Requests addi ATWS rule implementation schedule delay until fifth outage in Fall 1990. Justification for request based on unanticipated delays in NRC reviee Sc approval Zc time requir ed for detailed engineering 5 procurement activities.
DISTRIBUTION CODE:
AOSSD COPIES RECEIVED: LTR t
ENCL Q SIZE:
TITLE: OR/Licensing Submittal:
Salem ATWS Events GL-83-28 NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA TOUR IGNYIE COPIES LTTR ENCL REC IP IENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 3
INTERNAL: ARM/DAF/LFMB NRR/DEST/ESB NRR/DEST/PSB NRR/DLPG/GAB MAS/ILRB FIL 01 EXTERNAL:
LPDR NSIC NRR LASHERi D NRR/DEST/ ICSB NRR/DEST/RSB NRR/DOEA/QCB OQC/HDS2 RES/DE/EIB NRC PDR TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL
P f
V I
Il I
1 P
>f h
4 a
)
l~
IP
P.
X 14000, JUNO BEACH, FL 33408 0420
~41I6'y, FEBRUARY. 1 0 1988 L-88-63 10CFR50.62 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Re:
St. Lucie Unit 2 Docket No. 50-389 ATWS Im lementation Schedule By letter dated March 16, 1987 (E.
G.
Tourigny to C.
0.
Woody),
the NRC forwarded information concerning revised implementation schedules for compliance with the requirements of the ATWS rule.
The revised schedule allows an implementation delay to no later than the third refueling outage after July 24, l984.
The staff also stated that requests for delay beyond the third refueling outage would be handled on a case-by-case basis if presented in a timely fashion and adequately justified.
By FPL letter L-87-220, dated May 19,
- 1987, FPL requested a delay for St. Lucie Unit 2 until the fourth outage after July 24, 1984.
By letter dated July 1, 1987 (E.
G. Tourigny to C.
O. Woody), the NRC granted the FPL request to delay ATWS rule implementation date until the fourth outage after July 24, 1984 (currently scheduled for January 1989).
By letter L-87-301, dated July 15, l987, Florida Power
& Light Company (FPL) submitted the St. Lucie plant-specific Anticipated Transient Without SCRAM (ATWS) evaluation information.
The purpose of this letter is to submit a
request and justification for an additional implementation delay for St.
Lucie Unit 2.
It is requested that the St.
Lucie Unit 2
ATWS rule implementation schedule be delayed until the fifth outage after July 24, 1984.
The justification for this request is based on unanticipated delays in the NRC review of the FPL submittal of July 15,
- 1987, the need for NRC review and approval of the proposed implementation
- plan, and the time required for detailed engineering and procurement activities following this approval.
FPL GRM2.AIS 8802i70i38 880210 t
PDR ADOCK 05000389 P
9 flq
U. 8. Nuclear Regulatory Commission L-88-63 Page Two believes it would be imprudent, to proceed with detailed engineering design and procurement until the NRC approves FPL s proposed system modifications.
The fifth outage is currently scheduled for Fall 1990.
If there should be any questions, please contact us.
Very truly yours, C. 0.
Woo Executi ice President COW/GRM/dh cc:
Dr. J.
Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant GRM2.AIS