CNL-17-104, Response to Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)

From kanterella
(Redirected from ML17219A517)
Jump to navigation Jump to search

Response to Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)
ML17219A517
Person / Time
Site: Sequoyah  
Issue date: 08/07/2017
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
References
CAC MF9398, CAC MF9399, CNL-17-104, TS-SQN-16-04
Download: ML17219A517 (93)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-17-104 August 7, 2017 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 328

Subject:

Response to Request For Additional Information regarding Sequoyah Nuclear Plant, Units 1 and 2, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) (MF9398 and MF9399)

References:

1. TVA letter to NRC, CNL-16-051,"Sequoyah Nuclear Plant, Units 1 and 2, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04),"

dated March 13, 2017 (ML17073A018)

2. NRC Electronic Mail to TVA, Sequoyah Nuclear Station, Unit 1 & 2 - Request For Additional Information Related to LAR for Technical Specification 3.8.1.17 Note modification (CAC NOS. MF9398 AND MF9399) dated July 6, 2017 (ML17191A206)

By the Reference 1 letter, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) proposing changes to Sequoyah Nuclear Plant (SQN), Units 1 and 2, Surveillance Requirement (SR) 3.8.1.17 of Technical Specification (TS) 3.8.1, AC Sources -

Operating to delete the modifying note to allow the performance of the SR in Modes 1 through 4 when the associated load is out of service for maintenance or testing. In Reference 2, the NRC provided a Request for Additional Information (RAI) related to the proposed change to TS 3.8.1. The enclosure to this letter provides the response to the RAI included in the Reference 2 email.

U.S. Nuclear Regulatory Commission CNL-17-104 Page 2 August?, 2017 TVA has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in the Reference 1 letter. The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the supplemental information in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed license amendment.

There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Mr. Edward D. Schrull at (423) 751-3850.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 7th day of August 2017.

tfully, l,_.;~

tie a resident, Nuclear Licensing

Enclosure:

Response to NRC Request for Additional Information cc: (w/ Enclosure)

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC SQN Project Manager

Enclosure CNL-17-104 Page E-1 of 2 Response to NRC Request for Additional Information Request for Additional Information (RAI)

Tennessee Valley Authority Sequoyah Nuclear Plant Units 1 and 2 License Amendment Request SQN-TS-16-04 Docket Numbers 50-327 and 50-328 (CAC Nos. MF9398 and MF9399)

Request for Additional Information (RAI) No. 1 In the LAR on Page E-2, the licensee stated that SQN does not have a single load sequence timer to apply loads to the diesel generator (DG) under accident and loss of offsite power conditions. SQN uses discrete timers that sequentially apply the individual loads to the DG to respond to an accident or loss of offsite power condition.

Please provide the following additional information regarding the load sequencer:

a) The physical location of the discrete timers that sequentially apply the individual loads to the DG to respond to an accident or loss of offsite power condition.

b) How the discrete timers distinguish between an accident or loss of offsite power condition.

c) A typical example (including a schematic diagram etc.) showing the application of discrete timer(s) to a safety-related load.

TVA Response to RAI 1:

a) Each shutdown board is comprised of a line-up of ITE/ABB HK switchgear. Each shutdown board has an associated logic panel located adjacent to the shutdown board.

Relays implementing the load sequence scheme are distributed through the switchgear control compartments and the adjacent logic panel. All components are located in the Auxiliary Building 6.9 kV shutdown board rooms at floor elevation 734. The general arrangement for A train equipment is found on drawing 45N326 (Attachment 1) and B train equipment is depicted on drawing 45N328 (Attachment 2).

b) In the event of an accident signal without a loss of offsite power, the discrete load sequence timer circuit is not activated. Discrete Blackout (BO) relays (redundant components denoted by suffix -X and -Y) associated with each sequenced load are configured in parallel start circuits for each load. BO relays are latching control relays that change state when loss of voltage is detected. The BO relays enable either an instantaneous start signal if offsite power is available or the discrete load sequence timer for the associated load when connected to onsite AC.

c) For each of the two possible scenarios below, centrifugal charging pump (CCP) 1A-A schematic 1,2-45N765-16 is provided with highlighted dynamic portions of the feeder breaker close control circuit for illustration (See Attachments 3 and 4). Additionally, for

Enclosure CNL-17-104 Page E-2 of 2 scenarios 1 and 2, Auxiliary Power Schematic 1,2-45N765-3 is provided with highlighted dynamic portions of the BO relay circuitry applicable to the CCP 1A-A.

Scenario 1:

A safety injection signal with offsite power available causes CCP 1A-A to start by completing the breaker close circuit through CP BOX-1A and CP BOY-1A contacts which are closed when loss of offsite power has not been detected. (See Attachment 3)

Scenario 2:

Loss of offsite power with no safety injection signal present starts discrete load sequence timer CP ST-1A due to CP BOX-1A and CP BOY-1A changing state. CCP 1A-A starts after the time delay has elapsed by completing the breaker close circuit through CP ST-1A. (See Attachment 4)

RAI 2

In the LAR on Page E-3, the licensee stated as follows:

Calibration of the time delay relays, associated with automatic load sequence timers, may defeat certain functions in the downstream equipment energized by the timer, which may require entry into LCO Actions for the associated function. However, the time required to perform the calibration is typically a small fraction of the LCO Completion Time.

Maintenance and testing of the associated functions typically require periodic entry into these same LCO Actions. Coupling the calibrations with existing maintenance or testing does not increase the unavailability of the equipment.

Please provide following additional information regarding the above statements:

a) Whether the SR 3.8.1.17 is performed on a load sequencer timer which impacts only one safety-related load or one DG at any given time.

b) The approximate amount of time typically taken to perform SR 3.8.1.17. Also, provide the currently established frequency of performance of this surveillance.

TVA Response to RAI-2:

a) As shown in the attached surveillance instruction (SI) associated with SR 3.8.1.17 (Attachment 5), each safety system component has a dedicated load sequence timer relay. Note that Attachment 5 is representative of four SIs associated with implementation of SR 3.8.1.17. During the performance of the SI, testing of a relay only affects the specific safety system component associated with that relay. The relay testing does not affect the associated diesel generator since the testing is performed with the end device out of service and tagged under a hold order.

b) Performance of relay testing for SR 3.8.1.17 typically requires 2 to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />..

In accordance with the Surveillance Frequency Control Program, SR 3.8.1.17 is performed every 36 months.

CNL-17-104

CNL-17-104

CNL-17-104 Scenario 1 Diagrams

~

t.:u*

1-'1-2'01-C,16-9 TABLE 83 fllil( OllAY "ClA.Y IBOA.H)

CO-I A80VC I

I S l.&.YN BUS UV ktl.A'f rOR 01($(1,. StAAT

" nsax 1(57 iiii~=

$~ii~'

oc f.t.ILUltC lt(L Af AOU/N CHA/IC£

( TYi' All 8ACKC/RCl£SJ sec oc1 UJ I

I

,o,: :!:.

~

' 1-_..""---.....--~~*-.-~--.

2'$l(l

'~...

~Ii

~ ~ ~:

1' !' !, r l°i' **

f, f. f, f. l.f,,

802 1

I I

I I

I I

I I

I I

t--'"""""'-~~' o>:,

0 I


~

. :r 1($1 CRCU" A I

I L---* _.

~ !; ':

__ o_ 8-;:

- r,..

o _ -

~ = i

  • ~~:>~

kff

-- w Ii

~ k

~fi, r i 0i' i'.... " f i' !' r £ 0!'

0

.. f, f.T. l.U, ""',. f, f, f.f. I.L UVT S Ar(TY JNJ(CTIOH Pl.MP IA-A

( 4!1Jl1U*Ht lLBYI Al I...

r---

1 j'

< 8 UV>'


1 IJVY 0

0 lt01Ui Rtr£R[ '°'[ ORA'U NCS:

  • SH1'5 * *
  • 6.UV SCH'.[11 OlAC t5N11t * *
  • 46-0'1 SCI-UM 01AC
!l
:: i~lt~~c: ;~8~~u 061~c

'$Yi.$)!.$

t --- 6 11tV Si1U T00't"' 8CI

.f: --* 6 !(V \\i.Hll C0--1 90 IH li4'li (;()'loll lttil

{ *-- CH Ollt h[Alt LOC C()t.11 $,,

1 uvx. uvr. 90X........, 901 Jll[lAYS $HOU! All( '°" ' tKV S'MU100.W 90Alt0 \\OC IC,.. wrt IA-A 1Ulo\\1'S roit ' AHHS 18* 8. 7A* * *NO 1~

8,";~vs~\\~.~

xc~~lo 'toc"Yb '~H *: 1 :iHr~'~l~" SMC;~~l~'~I.-~ 5 15 Sll. 2A*'- IS $7A a..w 11f*8 IS S?t 1

' tltV SHUTDQ.11-..J LCX:tC *ELAl',.... Cl 1$ wrn lt(LA.l[D rOlt

)"°JVIDU'-l (O!Jl~lril sec 0:.l(Sl'OHOINC SOl[tMlJC

,.,.. [l5 U*4. a. 24*A Aft( TltAlH A. '"-"-Cl 5 lf*9

  • 1'*1.-It( Thlllli 8.

l roit Atl"'l<JATJCW LotAfJOJii'S ""'° 1 U:( ~..... lltS SU *~~,~-'~

~\\.11Clt POl"'t rQllt 'A.'Ll 18*1 IS YIOOU>

t()lll l(lt'Wtvt lONS SC( OlllH l..C

  • U.61)*0

)

LOCI(: llt{\\U CONTACtS ~"i °' C.OOfSf'OtlOl.C SQ<(WAtlCS '-'f(

Wfll{O ro lllOIOJC rttt,.,.JtOl'""IAI( lOCIC: "tlAT " " 'C.l I r:~2!ill~

1~c~:.J.:iN~~(~t'i'tC:.U~*~J.'ft~l~T 5"UT00H 90AJtO llXJC PJ._-.(L

  • ' 1-~~~~"~~~*=-~--+---~--~-.-~------1---1--~~~~~-.-~-------1-~--------+

1 sec: * ).I05)*' r0t 11$1A OCAll5

  • I SU * "<rtJ0- 1 '°" c;oiU*l *l*ts QOUf' I l(Sf "[LAfS A

I r..

I :u r

r

!~,

~*

) l-~2~1:S!T"-~..--~~+:-'r-'-)~1'14~T'-.,

r I

I

~ --~}'---~--

VVYO

"°'

OT 4

I I

I BOTS I

I I 5 HSlC.~I Ut.*I ur

  • )1olf(T)

Tm lllTI ttll COOi.

~tSTtw

""" c-s ( * )fril17t*21 (LOCIC,,_.,._LS IA*A

a. 21*1 or.I.YI SU.ff
  • ~

R.A. WI TTHAU[R CAO MAINTAINED DRAWING 10 lOUt,-WC.i\\I lOCAltO ()ii lO:.tC hN(L O'CC'1 *S t<ITCO II

~O!:fc'"i'l~tA~lOWS Tto.C fOLLOWINC ICM ltOO 51-<<,ltOCU 9Q.1~ IR[lAT

  • 11m.

0hmmr*..!~

0c~l:i'6'< A<>I~ ~,

~

0cl"lk~.n f H! 1,1,;Jo SH0Ul0 9C PLACl~ UNOfllNf_UH~fr.t ~A8[l f)~SC*fl*rJO..

l~

l~SJ&.r~~~ l rl IOM A~ IJN:05 O't lACl'I (l'-l' l IC:, AH[l SMU1001N 80d0 IA*A. LIX:IC R(LU PAN(l S0H*1*Pl'l0*202*SA*A PfUTOOf N BOA~ 18*8 LOCIC R"tlU PAh(l 50--*l*PNlQ-202*50*9 5HU100WN BOARO 2A*" LOCIC lf(LAY """'tl llON*7*P,.~A-Xn - sc -A SHUTOO-lil BOAl'tO 28-8 LOCIC tt[L4Y PANtL M)oi;.7.p,.~e-102-s.o-e

a. ¥:1J's~~~~rtF.'fcl;?.1.~.llc\\"g~o. ti<( ucs SHCIU\\o et

~O CA.t(

SCAl[

t.Cli'(

CXCCPI AS H!>f£0 AUX ILIARY BUllOINC UN ITS 1 a 2 WIRING DIAGRAMS CATEGORY 1 6900 VOLT SHUTDOWN AUX POWER SCHEMATIC DIAGRAM SH-3 SEQUOYAH NUCLEAR PLANT T£NNESS£[ VALL[Y AUTHORITY CU.ltN 0-11 tu o.ceq11:

tO ISM Pf*

'I/ r 8"'Ullit

  • I CA<rtl[._5 CCD 'fC:OCll 1* 110.. HU
  • ------- -------* M>a;D *L~t C'tn l<w.<<

C<Sl"'lf!

"1.Vl(ttlt

  • cc;::),..,_, AC*lt.a ~-tl1

~/A II, S(lt"...ZS 1.,. S(Ol,.li(: ot

)

flfA~I"[

CCO NO: 1. 2*'45N765-3 m

~JMj),)ij I

A H

I I

~

2r11

~ -"*

!"I

~"

t cu 0001 S>-"JTDO'I" 90 l8*8 I

I I

I I

I I

I I

l TO l#JX l A2 rr,,

( 4]9616-6>

' (UHl T ~ 1 1"02002

'f 0A611*C )

I IVl'l!f 21

\\0

~~Hl~6!8~VJgE~Q l A- ~ HPANY I

I xs~~~-io a l XS

  • 6 2 *10~ t

--.:0.- 6 1

~ S>l&C) c

'~I.... l f~! _+ ___ ---.,

l~ltX 2

f 1 M1 1 ~

XS-62-10S t

-;:u-x- ¢1'6 t-11'NU i -'<:

,.;-l--!LJk---'":::::::':-,~-=

,u~2~

-*72~

- *7 o*~:--*,----t-----------------------_J I


1-ru2-u-1C-*o\\-9

irS-62-"0* - t X5*62*H)* - t

~.,

cc*

I I

I l}J I

I I

I I ~ I I

I I I I I

I 119 I

I I

I I

I 11 I

1 2 I

I I

I I

I I

I I

I I

I

~---, --o * -~

I rOR 01<111 HUI" I 1CllT. SH 1

CtrA!L A I

1( 45M765 *1)

I

.. __,.so.. _.. _~

t,,

1.o-.-~ IHP CXf

~

_!*0-HO-~ Al - 100

~

JMX

~~ lOh' ll:CSt l

~ lOX'l[LA"t

~i-o.!..!.

~ SU-HLO 2.2.o-...o!-- 1 X PCL 4l'

~

TOICCO)

~ IX

.t. JCtl(LA'r

~

H')L_ r~~;:l;?~,

-.!9o..~

6 c l ST lt(LAY s c :

~ llCLAY

~~

JOX

~~ *HllE

l. IG-'"l r

~

~~

" ")j avrF F1. 1 rn... 1 "liMAt-7

(

  • 5NS51 -20 1

~

M "lil...l~

~.-o--ll

~

~

~

~

~ sT.. -rc11tcu1r JOX

~~111-HTCLT

~M 'l.l$X

~~~r" surr MTi.$1~

~~~.. i~?~20J

'<)rES

~..o-W

~

~;~~

~~ ~~LA~

~~i~~:t

~M>"'--

~.-o-2-- ~T~H

~.._,..,_L!O*x

~ l>(I.

1 S£( *SN7'S*1 TOR CtH(Ro\\L JrilOt(S

..l....o-i~ rRn*

~t<r

~...o-LJ~. 100

~

2 CtlrltRl'UCAI. tH' *"NC l"U\\#$,P(V I OiJ~Y $1--0*lil Cff * ~N1H*S sr..ao1.s 11' * * ***-- liMll I CCl'HROI. OCA;iO t ******- UOOv S*CJt

{ --- ---- tOCA. :;ONT#OI. Sr>.tl~

e- ******* &,OCV SO l<X; IC llHU 1't.t.

f> -*** * * *.. SSS ~.-.Cl( IH.o\\UIC IVSllt RV 9 ******* OSI. C[H (X)<IT 90 I,....CR

,.......** *:sov s*c=t SC1<L r-.:ONE Cl1CC<.£R cxcr~r AS NOT(O AUX!llARY BUllO!NG UNITS 1 &. 2 CA tECCRY 1 WIRING DIAGRAMS 6900V SHUTDOWN AUX POWER SCHEMATIC DIAGRAM SHEE T-16 SEQUOYAH NUCLEAR PLANT TENNESSEE VALLEY AUTHORITY C"Arft*

c.. rc,t:*

1t' rssvr " ~

M A C¢)(

JlH

  • CM.II Cd tttxlltATJOlo !.'<HT 1-',,-',-',G-',""',.=-'+','-',,'-,-",,'-',,"-"'-l;';~CD~~~- ~;:.~ A C'".0

'I*

1it1

  • S::itJCCS 2 v ti SCO-~.o.Gto.

"'Cl(lh()l?ll*

CCO NO: 1. 2-45N765-16 Rl2 I

I

u.. ci;,.,

J. B HOSMER I

I j

4 I

I l 5 I I

' I 7' ' j I I I I I

j I 3 I

i I

I I

I I

2 6

8 9

CAO MAINTAINEO ORAWING Note: If offsite power remains available, Safety injection signal starts loads with no delay (time delay relay bypassed).

CNL-17-104 Scenario 2 Diagrams

G-H I

I 21$V OET A3

~

t.:u*

DET D3 00Alt0 I A*A

°""

' HV !.:> 80 U!'llO i-;,-=' ** :;.---1:~:~:;~;:~~:::

1-'1-101*C01'-,t.

29.. 9 l * '1*101-Ct1&*8 TABLE 83 fl"'I'. OUAT' ll:(lA1 (ROAN)

I I

I I 1 I

I I

Sii 110 (lN$f)

QOut I f[S1 lt(t lr.YS r -*

I I

I...

I 11S 21S8k 80-SI T(S1 fl Bit

!l!!,CXJ cJose.S Utu INX CS.CC Oct Al) set oc1 SJ>

I 11(6011(

1 l7SX1 I All usu 80*S1 r.. *--1i.S1 ___ _ _

I I

er 801 RX

~'~~ ~!~.

~~1

, 1----""'.'"--.---l-'-.---.

nsn OO*SI 1($1 CUHIUf UC.AL tHA~I NC

,l.M,,........

C4)"'7U*10 901 I

I IJOXA USl~A ccs...

vvx SI*

UV><

sir Wf SA1C1Y l lriJ(CllOlil PUM!" "'" "

( 4 )11/76)*1 * )

IUXt

---~ ;'

1 1

I 1

1 1

I

... ___ ~
a* 1-----~

.,.,,""-"--1--1-------....---------1--1-------.---------1--1--------1 1AYI 11SIT TL61'

  • JWl (T}

(IC'*..

VVT JJSlf' IOI 0

  • .ue

.nr; tSS "'

U 1tll

~.l*A C * ~~1U*1)1 I I 4

llOYS 1CSt ~I lSS h

  • COOL o.t(llt h)-.. 10.. nJ CQ#CCQ.

'SJ51(W Pi.J# C*S C * ~""71'*2 (LOCJC '.a~U IA*"-

&. 1'1*8 ()iilf'J

~,,

I I

I I Jt I

1 2 I

1 t

I I

~

~


~

I I. :r I --------------- --i

~

I J o

  • 1 I

I I

I I

1'

.J t

8

$UT, C:C5C VVT 0

~...

,... ; 8 ~

1 -

~ ~ § ~

I u u

  • g
  • **: !' i' i' r !' r*

f,f,f.f.U.

l)VT 0

CAO MA INTAINED DRAWI NG

~ CQilii:IJ'1.1(0 CROVP,. rcsr *h. A1S AHU1NC£ O't.UIHCS 4!1"76S *** 6.,ICV S0.[M 014.C 451\\77! ** * *IOV SCH( W OIAC 45"1647..... l Ull:flO C(N AU )( SCH( M OIAC

' ) "'6'4 *** r*,\\MP 4 TVR8 $Clof(l.I OIAC STWflOC.,S:

t *** 6 t KV SHIJT()Q'U SJ

      • 6 t tCV UflilT COtn DO l!oi ~ CCNI ll:W

{

      • ON Ollt 111[.&JI: LOC CC)fll1 Sh, 1
  • !('/ SHiJlOO:ti.,. uxac l(lAf,AA[l IS $AfUT RClAtCO rOR llCllVIOC:-..i. [OUll'UC!lr.T sec COit* lsroNOINC ~cwn c P 0 1(l$

IA* I. 4 21.*A I.It{ TIU.IN 4.. ""~[LS '8*1 A 18*1.alt( t*Allii I J

r(llt.t.l\\lri.l'<J-'.lJ(lf.. l0CA1'10SS A'O IJR( h\\M)(R'$ SU *)"10*1)

CXM'UTU ro1~* r(lllt f'>!i!l 18*1 IS flOOIO. 1()111: l(lt\\oll'tAflOMS

!a.([ OlltA* Jfllll;

  • 7.a.1)*0

)

lOCIC HlAf' CO-TACJS s;a.-.. O!llo CO.qSl'Ol()J.-C S(lol(WAtll';$ A.R(

5'61 l:llO 10 l!C>ICAlC IK[...,,.lllQll'fU AI( \\OC:IC lttlAt ' ' 'Cl.

  • 1<1b~mo~

1~~~~-~~ci.W-J.U~*~t~CO:';~*

SHUIOC-lt 804.ltD \\Q;IC. f'A.."i(L 1

$(( * )KTU*' rOllt USI A OC1Atl5 5[( * )lri1U* I rOR c;(HU*l ll(J;*cs 10 (()JJN(l-.'I lOC*HO CW lOCIC ' ""'CL tliCCl"J * $ 1'0l[0

~ctfc"'i!!~c:~lO.. S rnc rOl.LOt'OC ro1t 000 ~ I OQo IOAllKI ttCLAY A

ll~[L oc~~lrn.8'.'s,~""c~*IJlSc.c ~I~ mv, ~o;*rc ~'f'..

'"! V~I~ ~l.0 ~(,1..... cl'6 u~:>t*">:'"ttt:il 1.A8h 48tcsc* 1 ~~lOM.

!~ t ~;Df&~&~R l f'I JON AJ() UHUIS Oft (AC" IULAl' l IC fl'A.N[ L SMU100WN 80AllO U *A l.OCIC RCL " l' '""'(l SO"l*l*,lil0*102*SA*A 9'U100r N B0Aft0 18*8 lOCIC RU.Al' 'A.N(L S~*l*'-"1D*102* SO*O SHU10010 ( 90.-,RQ 1A* " lOCIC lt[LU ' ""'Cl 5Dff*2.. P"IL8*102* SC* A SHUlDOOl BOARD 2&*8 LOCIC <<:[LU hN(L

~0"!*2*' 111 L0*102*SD*O e Y~l1s~~~~,{f1E\\~l~1~*:0~°" tttt hes St<>Ul.O ec OC

.OWi* Otf.WU TO cotlCCJ OHW S'nieC:llS

  • 14:tM.Cit( eotltUP1l0 OUltl<C, llt cowUS10N. CRH CCD MYS ti '"° lt )

AUX ILIARY BUllOINC UNITS 1 a 2 WIRING DIAGRAMS CATCCOllY 1 6900 VOLT SHUTDOWN AUX POWER SCHEMATIC DIAGRAM SH-3 SEQUOYAH NUCLEAR PLANT TENNESSEE VALLEY AUTHORITY ClSIC.

OU.I U~

OICC'l--llt

~ ISM '1111:

V'..,..._,

I" I OAllllClS CC) -C:toi<U.l* llOlo PCU

  • ------- -------* 11111) 0::0*~1 CA** I.,._--.:.(

OUI'""-*

ltl\\'l(rU

  • CCI 10J <AC*ll * ~ U7 w r SCJt-JIX'S

' "t $.(Q."tlll' J

1111.. ~1'11(

CCD N0:1,2-45N765-3 DV contacts close when shutdown board is de-energized due to loss of offsite power. Contacts open when shutdown board is energized from EDGs.

I I

E 9l-S9LNS ?- Z' l I I I

I

,-,---,---~---::::::::::::.,1 l

I Tivlr..C :

II *c1*cu:l r-"*

II" sc-

~

I CAi(

~


J

'"LS(

f.,

l'S*U-IC.!A,. *

--,-.- -1" t,..

!DC

~. ::-1 H "'~:~~~:!~flA J

'?' '°'.,

    • -o-t><;> I Low\\

>o..

t 01'1 1l 10 ;I..

fe~~-,* -

);**

_w1~l

-~'

~1.r1,1;41.t,.*t1*

..L.,,,--.Ynll-_-' __

==--.,..,,.,,.v,=-*"'"~."*'""c-.a.--------------C-E-N-T-R-I-f-U-C-A-l-C-H-A-R-G-l-N-C-P-U-M-P-1-8---8----'

\\'oQr(

TOP U'lll 2 r~c U... 10 01.t,~(

1.. 1r OtStC~AT!;J"'I I

I I

I

\\

~

5 I

I I

I I

I I

I 2

I I

I I

I 3

I I

I I

I 4

1 I

6 JD l

., t.

t Cl"lll I

r

' I I

I I

12 I

ta

~' c::.:~!ooo,. *, *.

  • !>'0<>>*~ ~~.1 ~-0 1 YCltAX>J

~c*.. 1.1c;...iT

~*.t* le*JCLn

~~ ~:;~:;;?:,

~~

~

.... ;.!o.ool~-.c;.,~! ~i..... 1* s1 IC:Ol _..,,,.

t * ~'lJt*ltl

~ Cl"**, S<Al.I~

.?:11

~~

... 11c:... :~..,

@~

1 s*... r

  • ~~

$1

      • ~
    • p

>1 µ-

SC*

~

1-~g

~

~

..o--!-;-,........,, '*' :, **

VTWA* ~

~'!~~;::H

~~

~

,............., --o * -~

1r01r 91(11 HUil 1 1C<T. SH 1

OtH.ll '

I

( t ~!.170-1 )

~--- io

.................J t.,

.l.o.t-~ ll:llC:tT

~

.io-4~A2'*100

.!o...o2-

~:.

i;**

"'-10 l

lt-**

c*u-h

~~,

... t!Sll c :., "'"

..!....oit+ol..)Q1; *(tA1

..!.tcM~

~,............

~..o!..*a f[\\AT 1

r~ 1 Sl*U *1'

..!....oit+oL

~~

r::,ftz~,.

~~

~.oil-

~

'W"t

  • 1*U*IC*

t

~"

t-1w1r

~

~

~

~

5 T.lU tl~U I T lOX

~-~ *~!lC:.T

~v*VJ.:

+fLo.,~~~ ~~~

"TV3 '~

(.. !,f.~1-10, MOHS 2-o-t ~

~

~ ~!

!l...o.. n-ol.!.. ~ ~ L u

~-O*H*O*-;- ;~~( T

.!....o-. ~ ~'r~H

~..............1! 0"(

~ t[L 1 sec..,.,'le~-1 r~ ecHtlh.1. ~res

~-~~~ ~,

~

~~j~*IOO

~

1 CCNHt!rUC> ~ CrfdC l1'G 1"'-'t.l'S l" ~[VI OU'SLY SHO'IH ON ~ ~"116)*,

S1'!.t8:1LS:

  • ** - ----,.Mil I CONTP:°'- &eAlltt) t *------ UOOV S*Dt

{........ ~OCA. :!l)o,O*:X STAllO~

~ ******* UOC'" SJ lOCJC lt(l4Y '"°*

e *******.,SSS ltAQ( [M 4\\JX J'"'SJP ""'

~ ******* cs~ CtN coo,r ~ JN..c.1t

.. ----**-.,o:.., s-c~

1111:

A.CMIH tl'IHCl "Cllt "116. l!U ' *C*') 004 1+HS JC5a.VlS PC*

&~1U1

  • cv SC".L£ AUXILIARY BUILOl~C UNITS 1 a. 2 WIRING DIAGRAMS CATECOllY I 6900V SHUTDOWN AUX POWER SCHEMATIC DIAGRAM SHEET-16 SEQUOYAH NUCLEAR PLANT TENNESSEE VALLEY AUTHORllY l'.... 1-'c.'..cc.'..c* '"-""*'-* "'"*'-'-' *--"' I-'-'*-* *c_'_* '"-* '-""'lt.='*c.* *--1
  • -~.. t 1:1' /U'l't-ll

'I/'

", st*J(;CS.

CCO NO: l.2-45N765-16 I

I I

I I

!Sl'JIO If J.B.HOSMCR CAD MAINTAINED DRA'NJNG

-D

-F Load sequence timer activated by detection of loss of offsite power.

CNL-17-104 1-SI-EDC-202-220-A Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers

Sequoyah Nuclear Plant Unit 1 Surveillance Instruction 1-SI-EDC-202-220.A Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers Revision 0018 Quality Related Level of Use: Continuous Use Effective Date: 04-05-2016 Responsible Organization:

MEG, Electrical Maintenance Prepared By:

Danny D. Roark Approved By:

Arden D. Seaborn

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 2 of 78 Revision Log Revision or Change Number Effective Date Affected Page Numbers Description of Revision/Change 6

03/19/1999 N/A This is an intent revision. Revised to incorporate Tech. Spec. change 98-06 to change emergency generator load sequence timer performance modes.

7 07/10/2001 N/A This is an non-intent revision. Revised appendix B connection hookup based upon craft feedback. Deleted reference to deficiency log and data package cover sheet which are no longer used.

8 10/03/2002 N/A This is an Intent revision. Revised procedure to change all wire lands from concurrent to independent verification. Updated tables and other formatting. Changed TS 3.7.7 to 3.7.15 for relay CR-ST.

9 01/08/2008 N/A Minor Editorial Changes. Revised to incorporate minor enhancements.

10 01/11/2012 ALL This procedure has been converted from Word 95 to the TVA Technical Template. Technical changes were not made.

11 01/13/2012 Various Revised to provide specific clearance requirements, Ref. PER 450804. Included additional information within each calibration section as to the specific equipment which relay served, Ref. PER 317419. Changed Appendix B, timer hookup figure by removal of figure B-1 which is not used by this SI, also changed figure B-2 as to how to connect timer stop trigger. Added torque values which were provided from previous performance, MMTP-104 data sheet. Other minor editorial changes. PCL-R26.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 3 of 78 Revision Log Revision or Change Number Effective Date Affected Page Numbers Description of Revision/Change 12 04/11/2012 13, 23, 28, 33, 38, 39 41, 42, 44, 50, 56, 61, 67, 72, 73 Revised to change conductor numbers related to CCS ST-1A relay, Component Cooling System Pump 1A-A due to changes made by DCN 22542, Stage 3, PIC 22777. Removed Foreman, replacing with FLS. Cleaned up TOC, Added Torque Wrench to M&TE list, removed OR MARK from wire labeling. PCL-R26 13 09/13/2012 Various Revised to remove reference to Unit 2 also added steps to five relay sections to clarify intent. Made minor Editorial changes.

(PCL-R26) 14 11/10/2012 38, 41 Revised to remove jumper from Section 6.7.3, Steps [2] E. and [12] E for relay CCS ST-1A, Component Cooling System Pump Motor 1A-A, No revision bars exist due to removal of steps only. Reference DCA 22542-238. PCL-R26 15 10/01/2013 Various Revised to change CVs to Peer Checks where appropriate. Other minor editorial changes.

PCL-R29 16 04/01/2014 Various Revised to address changes required for Improved Tech Specs (ITS) implementation using dual annotation.

17 12/08/2014 Various Revised to remove places for Shift Manager to sign per shop and Shift Manager request (ref. PER 899473). Update reference of NPG-SPP-10.3 to NPG-SPP-22-206. Updated Action Verbs per Writers Manual. PCL-R30

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 4 of 78 Revision Log Revision or Change Number Effective Date Affected Page Numbers Description of Revision/Change 18 04/05/2016 Various Revised to change Frequency to agree with revision to TS, Ref. 1128529-002. Also remove references to CTS. Improved Technical Specifications are now in affect but will not be identified with (ITS). Updated format per new version of Templates. Removed torque requirements for terminals as MMTP-104 revision 007 removed the requirement to torque Electrical Fasteners which are below 1/4.

Revised timing device and relay connections along with providing information on Programma, TM200 timer setup, Attachment 2 & 3. Added Calculation Number ETR to references. Also added 0-TI-SFCP-000-004.0, Surveillance Test Interval Control to Developmental References.

PCL-R34

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 5 of 78 Table of Contents

1.0 INTRODUCTION

.......................................................................................................... 8 1.1 Purpose........................................................................................................................ 8 1.2 Scope............................................................................................................................ 8 1.3 Surveillance Requirements........................................................................................... 9

2.0 REFERENCES

........................................................................................................... 10 2.1 Performance References............................................................................................ 10 2.2 Developmental References......................................................................................... 10 2.3 Commitments.............................................................................................................. 10 3.0 PRECAUTIONS AND LIMITATIONS......................................................................... 11 3.1 Precautions................................................................................................................. 11 3.2 Limitations................................................................................................................... 11 4.0 PREREQUISITE ACTIONS........................................................................................ 11 4.1 Preliminary Actions..................................................................................................... 11 4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies.......................... 12 4.3 Approvals and Notifications........................................................................................ 12 4.4 Field Preparations....................................................................................................... 12 5.0 ACCEPTANCE CRITERIA......................................................................................... 12 6.0 PERFORMANCE........................................................................................................ 13 6.1 Pre-work Instructions.................................................................................................. 13 6.2 CP ST-1A Relay for Centrifugal Charging Pump 1A-A............................................... 13 6.2.1 Clearances and M&TE.................................................................................. 13 6.2.2 Approvals and Notifications.......................................................................... 13 6.2.3 CP ST-1A Relay Setup and Calibration........................................................ 14 6.3 SIP ST-1A Relay for Safety Injection Pump 1A-A....................................................... 19 6.3.1 Clearances and M&TE.................................................................................. 19 6.3.2 Approvals and Notifications.......................................................................... 19 6.3.3 SIP ST-1A Relay Setup and Calibration....................................................... 20 6.4 RHR ST-1A Relay for Residual Heat Removal Pump 1A-A........................................ 24 6.4.1 Clearances and M&TE.................................................................................. 24 6.4.2 Approvals and Notifications.......................................................................... 24

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 6 of 78 Table of Contents (continued) 6.4.3 RHR ST-1A Relay Setup and Calibration..................................................... 25 6.5 ERCW A ST-1A Relay for Essential Raw Cooling Water Pump JA............................ 29 6.5.1 Clearances and M&TE.................................................................................. 29 6.5.2 Approvals and Notifications.......................................................................... 29 6.5.3 ERCW A ST-1A Relay Setup and Calibration............................................... 30 6.6 ERCW B ST-1A Relay for Essential Raw Cooling Water Pump QA........................... 34 6.6.1 Clearances and M&TE.................................................................................. 34 6.6.2 Approvals and Notifications.......................................................................... 34 6.6.3 ERCW B ST-1A Relay Setup and Calibration............................................... 35 6.7 CCS ST-1A Relay For Component Cooling System Pump 1A-A................................ 39 6.7.1 Clearances and M&TE.................................................................................. 39 6.7.2 Approvals and Notifications.......................................................................... 39 6.7.3 CCS ST-1A Relay Setup and Calibration...................................................... 40 6.8 CCS ST-CS Relay for Component Cooling System Pump C-S.................................. 45 6.8.1 Clearances and M&TE.................................................................................. 45 6.8.2 Approvals and Notifications.......................................................................... 45 6.8.3 CCS ST-CS Relay Setup and Calibration..................................................... 46 6.9 AFW ST-1A Relay for Auxiliary Feedwater Pump 1A-A.............................................. 51 6.9.1 Clearances and M&TE.................................................................................. 51 6.9.2 Approvals and Notifications.......................................................................... 51 6.9.3 AFW ST-1A Relay Setup and Calibration..................................................... 52 6.10 CSP ST-1A Relay for Containment Spray Pump 1A-A............................................... 57 6.10.1 Clearances and M&TE.................................................................................. 57 6.10.2 Approvals and Notifications.......................................................................... 57 6.10.3 CSP ST-1A Relay Setup and Calibration...................................................... 58 6.11 PHBA ST-1A Relay for Pressurizer Heater Backup 1A-A........................................... 62 6.11.1 Clearances and M&TE.................................................................................. 62 6.11.2 Approvals and Notifications.......................................................................... 62 6.11.3 PHBA ST-1A Relay Setup and Calibration................................................... 63

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 7 of 78 Table of Contents (continued) 6.12 [NRC/C] CR-ST Relay for Main Control Room Air Handling Unit A-A

[NCO 910032004]....................................................................................................... 68 6.12.1 Clearances and M&TE.................................................................................. 68 6.12.2 Approvals and Notifications.......................................................................... 68 6.12.3 CR-ST Relay Setup and Calibration............................................................. 69 7.0 POST PERFORMANCE ACTIVITY............................................................................ 74 7.1 Testing........................................................................................................................ 74 7.2 Restoration................................................................................................................. 74 7.3 Summarizing Results.................................................................................................. 74 8.0 RECORDS.................................................................................................................. 74 : Remarks.................................................................................................... 75 : Test Equipment Connection.................................................................... 76 : Programma, TM200 Timer Setup............................................................. 77

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 8 of 78

1.0 INTRODUCTION

1.1 Purpose This SI is performed to verify operability of the following automatic load sequence timers associated with the emergency diesel generators.

1.2 Scope

[NRC/C] This Instruction shall apply to the following relays which are isolated during testing to prevent inadvertent actuation of safety systems: [NCO 870128001]

RELAY DEVICE CONTROLLED LOGIC RELAY PANEL CP ST-1A Centrifugal Charging Pump 1A-A PANEL 2 LEFT 6900V SDBD 1A-A SIP ST-1A Safety Injection Pump 1A-A PANEL 1 RIGHT 6900V SDBD 1A-A RHR ST-1A Residual Heat Removal Pump 1A-A PANEL 1 RIGHT 6900V SDBD 1A-A ERCW A ST-1A Essential Raw Cooling Water Pump JA PANEL 1 LEFT 6900V SDBD 1A-A ERCW B ST-1A Essential Raw Cooling Water Pump QA PANEL 1 LEFT 6900V SDBD 1A-A CCS ST-1A Component Cooling System Pump 1A-A PANEL 2 LEFT 6900V SDBD 1A-A CCS ST-CS Component Cooling System Pump CS PANEL 1 RIGHT 6900V SDBD 1A-A AFW ST-1A Auxiliary Feedwater Pump 1A-A PANEL 2 RIGHT 6900V SDBD 1A-A CSP ST-1A Containment Spray Pump 1A-A PANEL 2 RIGHT 6900V SDBD 1A-A PHBA ST-1A Pressurizer Heater Backup 1A-A PANEL 2 LEFT 6900V SDBD 1A-A CR-ST Main Control Room Air Handling Unit A-A PANEL 1 LEFT 6900V SDBD 1A-A

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 9 of 78 1.3 Surveillance Requirements T.S. SECTION APPLICABLE MODE(S)

PERFORMANCE MODES(S)

FREQUENCY (TS.3.8.1)

SR 3.8.1.17 1,2,3,4

[*1,2,3,&4];5,6 & defuel 36 months, in accordance with the Surveillance Frequency Control Program This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4.

However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 10 of 78

2.0 REFERENCES

2.1 Performance References None 2.2 Developmental References A.

SQN Technical Specifications Unit 1:

TS. 3.8.1.1 TS. 3.8.1.2 SR. 4.8.1.1.2.d.10 SR. 4.8.1.2 B.

Drawings:

CONTRACT# 83403 CO-31704-MKE-E2 CO-31704-MKE-E4 45N657-7 45N765-6 45N765-7 45N1688-2 45N765-10 45N765-13 45N765-14 45N779-7 45N765-15 45N765-16 45N779-2 C.

Commitment NCO 87-0128-001 RIMS# S53870416811 D.

[NRC/C] NPG-SPP-22-206, Verification Program. [NCO 920015006]

E.

NPG-SPP-10.2, Clearance Procedure to Safely Control Energy.

F.

MMTP-104, Guidelines and Methodology for Assembling and Tensioning Threaded Connections.

G. Calculation # ETR, Cal

Title:

Demonstrated Accuracy Calculation ETR, RIMS No B25880317300, for Rev. 0 and RIMS B87 160321 004 for Rev. 2 H.

0-TI-SFCP-000-004.0, Surveillance Test Interval Control 2.3 Commitments A.

NCO 870128001, S53870416811 commitment to adequately isolate relays being tested to prevent inadvertent actuation of safety systems.

B.

NCO 910032004, S10910214808 commitment to add the CR-ST relay to the Load Sequence Surveillance instruction.

C.

NCO 920015006, Clarify verification requirements.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 11 of 78 Date ________

3.0 PRECAUTIONS AND LIMITATIONS 3.1 Precautions A.

All standard safety practices shall be observed while working on or near energized equipment.

B.

To prevent inadvertent equipment actuation, lifted leads shall NOT be allowed to make contact with each other or ground.

3.2 Limitations A.

Restraints and requirements of T.S.3.8.1, T.S.3.8.9, T.S.3.8.2, T.S.3.8.10 applies during performance.

B.

If replacement of relay is required, testing of that relay shall be performed "AFTER" permanent installation.

C.

Relay Calibration Sections 6.2 through 6.12 may be performed out of sequence.

4.0 PREREQUISITE ACTIONS 4.1 Preliminary Actions

[1]

OBTAIN clearances on equipment as specified by section under work.

[2]

DOCUMENT "Reason for Test" of Surveillance Instruction in Remarks section (Attachment 1).

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 12 of 78 Date ________

4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies

[1]

OBTAIN the following M&TE:

A.

Model 325 Power-System Polymeter, TM-2/200 or equivalent time response meter (TRM).

B.

125 VDC Power Supply (as needed)

[2]

OBTAIN the following equipment, tools, and supplies as required:

A.

Single pole single throw switch and test leads B.

Wire markers C.

Scotch 33 Electrical Tape D.

Digital Multimeter (VOM)

E.

6900 Logic Relay Panel Keys (as required) 4.3 Approvals and Notifications The approvals and notifications will be obtained for each relay as they are performed in Section 6.0.

4.4 Field Preparations None 5.0 ACCEPTANCE CRITERIA A.

Allowable tolerance for each timer shall be +/- 5% of the applicable set point.

B.

CR/WO shall be initiated for repair/replacement of defective components.

All CR/WOs initiated shall be documented under remarks (Attachment 1).

C.

US and First Line Supervisor (FLS) must be informed of all deficiencies or if acceptance criteria is NOT met.

D.

All identified deficiencies in test acceptance criteria shall be documented in the Remarks Section (Attachment 1) and evaluated for a CR.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 13 of 78 Date ________

6.0 PERFORMANCE 6.1 Pre-work Instructions

[1]

ENSURE Precautions and Limitations in Section 3.0 have been reviewed.

[2]

ENSURE Prerequisites in Section 4.0 are met.

[3]

PROCEED to Section required for Relay under test.

6.2 CP ST-1A Relay for Centrifugal Charging Pump 1A-A 6.2.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N765-16.

Clearance No:_______________

NOTE Relay CP ST-1A is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 2, left side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.2.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Centrifugal Charging Pump 1A-A, Relay CP ST-1A. US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2, and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from relay CP ST-1A, and TRs 8.1.2, 8.1.1, and LCOs 3.5.2, 3.5.3 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 14 of 78 Date ________

6.2.3 CP ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from Relay CP ST-1A as designated below:

A.

Relay terminal point T4 wire # SA18C9 PC B.

Relay terminal point M4 wire # SA18C11 PC C.

Relay terminal point M4 wire # SA18C11 PC D.

Relay terminal point B1 wire # SA18C16 PC E.

Relay terminal point B1 wire # SA18C16 PC F.

Relay terminal point B4 wire # SA18CN PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 15 of 78 Date ________

6.2.3 CP ST-1A Relay Setup and Calibration (continued)

[3]

CONNECT Timing Device to relay CP ST-1A as designated below: (refer to Attachment 2)

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M4 and T4

[4]

MEASURE and RECORD "As Found" CP ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 2.0 sec (1.9 sec to 2.1 sec)

PC

[5]

IF "As Found" is outside the acceptance criteria range, THEN

[5.1]

NOTIFY Supervision and US.

[5.2]

RECORD failure in work document prior to proceeding with step 6.2.3[6].

[6]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 16 of 78 Date ________

6.2.3 CP ST-1A Relay Setup and Calibration (continued)

[7]

IF relay CP ST-1A will NOT adjust within specified tolerance, THEN

[7.1]

INITIATE and RECORD CR/WO for repair/replacement.

CR/WO#:__________________

[7.2]

DOCUMENT failure under Remarks (Attachment 1).

[8]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "As Left" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 2.0 sec (1.9 sec to 2.1 sec)

PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 17 of 78 Date ________

6.2.3 CP ST-1A Relay Setup and Calibration (continued)

[9]

DISCONNECT Timing Device from relay.

[10]

CONNECT leads lifted in Step 6.2.3[2] to CP ST-1A as designated below:

A.

Relay terminal point T4 wire # SA18C9 IV B.

Relay terminal point M4 wire # SA18C11 IV C.

Relay terminal point M4 wire # SA18C11 IV D.

Relay terminal point B1 wire # SA18C16 IV E.

Relay terminal point B1 wire # SA18C16 IV F.

Relay terminal point B4 wire # SA18CN IV

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 18 of 78 Date ________

6.2.3 CP ST-1A Relay Setup and Calibration (continued)

[11]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point T4 B.

Relay, Terminal point M4 C.

Relay, Terminal point B1 D.

Relay, Terminal point B4

[12]

ENSURE all test equipment used is removed.

PC

[13]

IF temporary wire markers were installed, THEN REMOVE markers.

[14]

NOTIFY Operations of relay test completion on Centrifugal Charging Pump.

[15]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 19 of 78 Date ________

6.3 SIP ST-1A Relay for Safety Injection Pump 1A-A 6.3.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N765-14.

Clearance No:_______________

NOTE Relay SIP ST-1A located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0',

Auxiliary Building; Panel 1 right side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.3.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Safety Injection Pump 1A-A, relay SIP ST-1A. US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2, and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from relay SIP ST-1A, and LCOs 3.5.2 and 3.5.3 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 20 of 78 Date ________

6.3.3 SIP ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from Relay SIP ST-1A as designated below:

A.

Relay terminal point T3 wire # SA15C3 PC B.

Relay terminal point T3 wire # SA15C3 PC C.

Relay terminal point M3 wire # SA15CST PC D.

Jumper terminal point M3 wire # SA15CST PC E.

Relay terminal point B4 wire # SA15CN PC

[3]

CONNECT Timing Device to relay SIP ST-1A as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M3 and T3

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 21 of 78 Date ________

6.3.3 SIP ST-1A Relay Setup and Calibration (continued)

[4]

MEASURE and RECORD "As Found" SIP ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 5.0 sec (4.75 sec to 5.25 sec)

PC

[5]

IF "As Found" is outside the acceptance criteria range, THEN

[5.1]

NOTIFY Supervision and US.

[5.2]

RECORD failure in work document prior to proceeding with step 6.3.3[6].

[6]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

[7]

IF relay SIP ST-1A will NOT adjust within specified tolerance THEN

[7.1]

INITIATE and RECORD CR/WO for repair/replacement.

CR/WO#:__________________

[7.2]

DOCUMENT failure under Remarks (Attachment 1).

[8]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "As Left" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 5.0 sec (4.75 sec to 5.25 sec)

PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 22 of 78 Date ________

6.3.3 SIP ST-1A Relay Setup and Calibration (continued)

[9]

DISCONNECT Timing Device from relay.

[10]

CONNECT leads lifted in Step 6.3.3[2] to SIP ST-1A as designated below:

A.

Relay terminal point T3 wire # SA15C3 IV B.

Relay terminal point T3 wire # SA15C3 IV C.

Relay terminal point M3 wire # SA15CST IV D.

Jumper terminal point M3 wire # SA15CST IV E.

Relay terminal point B4 wire # SA15CN IV

[11]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point T3 B.

Relay, Terminal point M3 C.

Relay, Terminal point B4

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 23 of 78 Date ________

6.3.3 SIP ST-1A Relay Setup and Calibration (continued)

[12]

ENSURE all test equipment used is removed.

PC

[13]

IF temporary wire markers were installed, THEN REMOVE markers.

[14]

NOTIFY Operations of relay test completion on Safety Injection Pump 1A-A

[15]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 24 of 78 Date ________

6.4 RHR ST-1A Relay for Residual Heat Removal Pump 1A-A 6.4.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N765-13.

Clearance No:_______________

NOTE Relay RHR ST-1A is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 1 right side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.4.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Residual Heat Removal Pump 1A-A, Relay RHR ST-1A.

US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2, and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from relay RHR ST-1A, and LCOs 3.6.6, 3.4.7, 3.4.8, 3.5.2, 3.4.6, 3.5.3, 3.9.5, and 3.9.6 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 25 of 78 Date ________

6.4.3 RHR ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from relay RHR ST-1A as designated below:

A.

Relay terminal point T3 wire # SA14C3 PC B.

Relay terminal point T3 wire # SA14C3 PC C.

Relay terminal point M3 wire # SA14CST PC D.

Jumper terminal point M3 wire # SA14CST PC E.

Relay terminal point B4 wire # SA14CN PC

[3]

CONNECT Timing Device to Relay RHR ST-1A as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M3 and T3

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 26 of 78 Date ________

6.4.3 RHR ST-1A Relay Setup and Calibration (continued)

[4]

MEASURE and RECORD "As Found" RHR ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 10.0 sec (9.50 sec to 10.5 sec)

PC

[5]

IF "As Found" is outside the acceptance criteria range, THEN

[5.1]

NOTIFY Supervision and US

[5.2]

RECORD failure in work document prior to proceeding with step 6.4.3[6].

[6]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

[7]

IF relay RHR ST-1A will NOT adjust within specified tolerance, THEN

[7.1]

INITIATE and RECORD CR/WO for repair/replacement CR/WO#:__________________

[7.2]

DOCUMENT failure under Remarks (Attachment 1).

[8]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "As Left" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 10.0 sec (9.50 sec to 10.5 sec)

PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 27 of 78 Date ________

6.4.3 RHR ST-1A Relay Setup and Calibration (continued)

[9]

DISCONNECT Timing Device from relay.

[10]

CONNECT leads lifted in Step 6.4.3[2] to RHR ST-1A as designated below:

A.

Relay terminal point T3 wire # SA14C3 IV B.

Relay terminal point T3 wire # SA14C3 IV C.

Relay terminal point M3 wire # SA14CST IV D.

Jumper terminal point M3 wire # SA14CST IV E.

Relay terminal point B4 wire # SA14CN IV

[11]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point T3 B.

Relay, Terminal point M3 C.

Relay, Terminal point B4

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 28 of 78 Date ________

6.4.3 RHR ST-1A Relay Setup and Calibration (continued)

[12]

ENSURE all test equipment used is removed.

PC

[13]

IF temporary wire markers were installed, THEN REMOVE markers.

[14]

NOTIFY Operations of relay test completion on Residual Heat Removal Pump 1A-A

[15]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 29 of 78 Date ________

6.5 ERCW A ST-1A Relay for Essential Raw Cooling Water Pump JA 6.5.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N765-15.

Clearance No:_______________

NOTE Relay ERCW A ST-1A is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 1 left side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.5.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Essential Raw Cooling Water Pump JA, relay ERCW A ST-1A.

US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2, and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from Relay ERCW A ST-1A, and LCO 3.7.8 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 30 of 78 Date ________

6.5.3 ERCW A ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from Relay ERCW A ST-1A as designated below:

A.

Relay terminal point B1 wire # S1A8ST PC B.

Relay terminal point T4 wire # S1A8C4 PC C.

Relay terminal point M4 wire # S1A8C5 PC D.

Relay terminal point B4 wire # S1A8ST1 PC

[3]

CONNECT Timing Device to relay ERCW A ST-1A as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M4 and T4

[4]

MEASURE and RECORD "As Found" ERCW A ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 15.0 sec (14.25 sec to 15.75 sec)

PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 31 of 78 Date ________

6.5.3 ERCW A ST-1A Relay Setup and Calibration (continued)

[5]

IF "As Found" is outside the acceptance criteria range, THEN

[5.1]

NOTIFY Supervision and US.

[5.2]

RECORD failure in work document prior to proceeding with step 6.5.3[6].

[6]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

[7]

IF relay ERCW A ST-1A will NOT adjust within specified tolerance, THEN

[7.1]

INITIATE and RECORD CR/WO for repair/replacement.

CR/WO#:__________________

[7.2]

DOCUMENT failure under Remarks (Attachment 1).

[8]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "As Left" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 15.0 sec (14.25 sec to 15.75 sec)

PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 32 of 78 Date ________

6.5.3 ERCW A ST-1A Relay Setup and Calibration (continued)

[9]

DISCONNECT Timing Device from relay.

[10]

CONNECT leads lifted in Step 6.5.3[2] to ERCW A ST-1A as designated below:

A.

Relay terminal point B1 wire # S1A8ST IV B.

Relay terminal point T4 wire # S1A8C4 IV C.

Relay terminal point M4 wire # S1A8C5 IV D.

Relay terminal point B4 wire # S1A8ST1 IV

[11]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point B1 B.

Relay, Terminal point T4 C.

Relay, Terminal point M4 D.

Relay, Terminal point B4

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 33 of 78 Date ________

6.5.3 ERCW A ST-1A Relay Setup and Calibration (continued)

[12]

ENSURE all test equipment used is removed.

PC

[13]

IF temporary wire markers were installed, THEN REMOVE markers.

[14]

NOTIFY Operations of relay test completion on Essential Raw Cooling Water Pump JA.

[15]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 34 of 78 Date ________

6.6 ERCW B ST-1A Relay for Essential Raw Cooling Water Pump QA 6.6.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N765-15.

Clearance No:_______________

NOTE Relay ERCW B ST-1A is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' AUXILIARY BUILDING; PANEL 1, left side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.6.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Essential Raw Cooling Water Pump QA, relay ERCW B ST-1A. US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2, and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from relay ERCW B ST-1A, and LCO 3.7.8 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 35 of 78 Date ________

6.6.3 ERCW B ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from relay ERCW B ST-1A as designated below:

A.

Relay terminal point B1 wire # S1A9ST PC B.

Relay terminal point T4 wire # S1A9C4 PC C.

Relay terminal point M4 wire # S1A9C5 PC D.

Relay terminal point B4 wire # S1A9ST1 PC

[3]

CONNECT Timing Device to relay ERCW B ST-1A as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M4 and T4

[4]

MEASURE and RECORD "As Found" ERCW B ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 15.0 sec (14.25 sec to 15.75 sec)

PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 36 of 78 Date ________

6.6.3 ERCW B ST-1A Relay Setup and Calibration (continued)

[5]

IF "As Found" is outside the acceptance criteria range, THEN

[5.1]

NOTIFY Supervision and US.

[5.2]

RECORD failure in work document prior to proceeding with step 6.6.3[6].

[6]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

[7]

IF relay ERCW B ST-1A will NOT adjust within specified tolerance, THEN

[7.1]

INITIATE and RECORD CR/WO for repair/replacement CR/WO#:__________________

[7.2]

DOCUMENT failure under Remarks (Attachment 1).

[8]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "As Left" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 15.0 sec (14.25 sec to 15.75 sec)

PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 37 of 78 Date ________

6.6.3 ERCW B ST-1A Relay Setup and Calibration (continued)

[9]

DISCONNECT Timing Device from relay.

[10]

CONNECT leads lifted in Step 6.6.3[2] to ERCW B ST-1A as designated below:

A.

Relay terminal point B1 wire # S1A9ST IV B.

Relay terminal point T4 wire # S1A9C4 IV C.

Relay terminal point M4 wire # S1A9C5 IV D.

Relay terminal point B4 wire # S1A9ST1 IV

[11]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point B1 B.

Relay, Terminal point T4 C.

Relay, Terminal point M4 D.

Relay, Terminal point B4

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 38 of 78 Date ________

6.6.3 ERCW B ST-1A Relay Setup and Calibration (continued)

[12]

ENSURE all test equipment used is removed.

PC

[13]

IF temporary wire markers were installed, THEN REMOVE markers.

[14]

NOTIFY Operations of relay test completion on Essential Raw Cooling Water Pump.

[15]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 39 of 78 Date ________

6.7 CCS ST-1A Relay For Component Cooling System Pump 1A-A 6.7.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N779-2.

Clearance No:_______________

NOTE Relay CCS ST-1A is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 2, left side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.7.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Component Cooling System Pump 1A-A, Relay CCS ST-1A.

US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2, and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from relay CCS ST-1A, and LCO 3.7.7 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 40 of 78 Date ________

6.7.3 CCS ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from Relay CCS ST-1A as designated below:

A.

Relay terminal point B1 wire # A14BS1 PC B.

Relay terminal point B1 wire # A14BS1 PC C.

Relay terminal point T4 wire # A14BS5 PC D.

Relay terminal point M3 wire # A14BS6 PC E.

Relay terminal point B4 wire # A14BCN PC F.

Relay terminal point B4 wire # A14BCN PC G. Relay terminal point T3 wire # A14BC5 PC H.

Relay terminal point T3 wire # A14BC5 PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 41 of 78 Date ________

6.7.3 CCS ST-1A Relay Setup and Calibration (continued)

[3]

CONFIRM deenergized contact configuration, using VOM:

Contact M3 to T3: OPEN

[4]

CONNECT Timing Device to relay CCS ST-1A as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M4 and T4

[5]

MEASURE and RECORD "As Found" CCS ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 30.0 sec (28.50 sec to 31.50 sec)

PC

[6]

CONFIRM energized contact configuration, using VOM:

Contact M3 to T3: CLOSED

[7]

IF "As Found" is outside the acceptance criteria range, THEN

[7.1]

NOTIFY Supervision and US.

[7.2]

RECORD failure in work document prior to proceeding with step6.7.3[8].

[8]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 42 of 78 Date ________

6.7.3 CCS ST-1A Relay Setup and Calibration (continued)

[9]

IF relay CCS ST-1A will NOT adjust within specified tolerance, THEN

[9.1]

INITIATE and RECORD CR/WO for repair/replacement.

CR/WO#:__________________

[9.2]

DOCUMENT failure under Remarks (Attachment 1).

[10]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "AS LEFT" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 30.0 sec (28.50 sec to 31.50 sec)

PC

[11]

DISCONNECT Timing Device from relay.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 43 of 78 Date ________

6.7.3 CCS ST-1A Relay Setup and Calibration (continued)

[12]

CONNECT leads lifted in Step 6.7.3[2] to CCS ST-1A as designated below:

A.

Relay terminal point B1 wire # A14BS1 IV B.

Relay terminal point B1 wire # A14BS1 IV C.

Relay terminal point T4 wire # A14BS5 IV D.

Relay terminal point M3 wire # A14BS6 IV E.

Relay terminal point B4 wire # A14BCN IV F.

Relay terminal point B4 wire # A14BCN IV G. Relay terminal point T3 wire # A14BC5 IV H.

Relay terminal point T3 wire # A14BC5 IV

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 44 of 78 Date ________

6.7.3 CCS ST-1A Relay Setup and Calibration (continued)

[13]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point B1 B.

Relay, Terminal point T4 C.

Relay, Terminal point M3 D.

Relay, Terminal point B4 E.

Relay, Terminal point T3

[14]

ENSURE test equipment used is removed.

PC

[15]

IF temporary wire markers were installed, THEN REMOVE markers.

[16]

NOTIFY Operations of Relay Test completion on Component Cooling System Pump 1A-A.

[17]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 45 of 78 Date ________

6.8 CCS ST-CS Relay for Component Cooling System Pump C-S 6.8.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N779-2.

Clearance No:_______________

NOTE Relay CCS ST-CS is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 1, right side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.8.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Component Cooling System Pump C-S, relay CCS ST-CS.

US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2 and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from relay CCS ST-CS, and LCO 3.7.7 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 46 of 78 Date ________

6.8.3 CCS ST-CS Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from relay CCS ST-CS as designated below:

A.

Relay terminal point B1 wire # A24CS1 PC B.

Relay terminal point B1 wire # A24CS1 PC C.

Relay terminal point T4 wire # A24CS5 PC D.

Relay terminal point M4 wire # A24CC2 PC E.

Jumper terminal point M4 wire # A24CC2 PC F.

Relay terminal point B4 wire # A24CCN PC G. Relay terminal point B4 wire # A24CCN PC H.

Relay terminal point T3 wire # A24CS6 PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 47 of 78 Date ________

6.8.3 CCS ST-CS Relay Setup and Calibration (continued)

[3]

CONFIRM deenergized contact configuration, using VOM:

Contact M3 to T3: OPEN

[4]

CONNECT Timing Device to relay CCS ST-CS as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M4 and T4

[5]

MEASURE and RECORD "As Found" CCS ST-CS time delay value.

AS FOUND:________sec.

Acceptance Criteria: 30.0 sec (28.50 sec to 31.50 sec)

PC

[6]

CONFIRM energized contact configuration, using VOM:

Contact M3 to T3: CLOSED

[7]

IF "As Found" is outside the acceptance criteria range, THEN

[7.1]

NOTIFY Supervision and US

[7.2]

RECORD failure in work document prior to proceeding with step 6.8.3[8].

[8]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 48 of 78 Date ________

6.8.3 CCS ST-CS Relay Setup and Calibration (continued)

[9]

IF relay CCS ST-CS will NOT adjust within specified tolerance, THEN

[9.1]

INITIATE and RECORD CR/WO for repair/replacement.

CR/WO#:__________________

[9.2]

DOCUMENT failure under Remarks (Attachment 1).

[10]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "AS LEFT" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 30.0 sec (28.50 sec to 31.50 sec)

PC

[11]

DISCONNECT Timing Device from relay.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 49 of 78 Date ________

6.8.3 CCS ST-CS Relay Setup and Calibration (continued)

[12]

CONNECT leads lifted in Step 6.8.3[2] to CCS ST-CS as designated below:

A.

Relay terminal point B1 wire # A24CS1 IV B.

Relay terminal point B1 wire # A24CS1 IV C.

Relay terminal point T4 wire # A24CS5 IV D.

Relay terminal point M4 wire # A24CC2 IV E.

Jumper terminal point M4 wire # A24CC2 IV F.

Relay terminal point B4 wire # A24CCN IV G. Relay terminal point B4 wire # A24CCN IV H.

Relay terminal point T3 wire # A24CS6 IV

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 50 of 78 Date ________

6.8.3 CCS ST-CS Relay Setup and Calibration (continued)

[13]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point B1 B.

Relay, Terminal point T4 C.

Relay, Terminal point M4 D.

Relay, Terminal point B4 E.

Relay, Terminal point T3

[14]

ENSURE test equipment used is removed.

PC

[15]

IF temporary wire markers were installed, THEN REMOVE markers.

[16]

NOTIFY Operations of Relay Test completion on Component Cooling System Pump C-S.

[17]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 51 of 78 Date ________

6.9 AFW ST-1A Relay for Auxiliary Feedwater Pump 1A-A 6.9.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N765-6 Clearance No:_______________

NOTE Relay AFW ST-1A is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 2 right side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.9.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Auxiliary Feedwater Pump 1A-A, relay AFW ST-1A. US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2 and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from Relay AFW ST-1A, and LCO 3.7.5 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 52 of 78 Date ________

6.9.3 AFW ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from Relay AFW ST-1A as designated below:

A.

Relay terminal point B1 wire # SA10CST PC B.

Relay terminal point M3 wire # SA10C4 PC C.

Relay terminal point T4 wire # SA10C2 PC D.

Relay terminal point T4 wire # SA10C2 PC E.

Relay terminal point T3 wire # SA10A1 PC F.

Relay terminal point B4 wire # SA10CN PC G. Relay terminal point M4 wire # SA10C3 PC H.

Relay terminal point M4 wire # SA10C3 PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 53 of 78 Date ________

6.9.3 AFW ST-1A Relay Setup and Calibration (continued)

[3]

CONFIRM deenergized relay contact configuration as follows using VOM:

Contact M3 to T3: OPEN

[4]

CONNECT Timing Device to relay AFW ST-1A as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M4 and T4

[5]

MEASURE and RECORD "As Found" AFW ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 20.0 sec (19.0 sec to 21.0 sec)

PC

[6]

CONFIRM Energized relay contact configuration as follows using VOM:

Contact M3 to T3: CLOSED

[7]

IF "As Found" is outside the acceptance criteria range, THEN

[7.1]

NOTIFY Supervision and US.

[7.2]

RECORD failure in work document prior to proceeding with step 6.9.3[8].

[8]

IF time delay value exceeds specified tolerance, OR adjustment of relay is desired, THEN ADJUST relay as required.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 54 of 78 Date ________

6.9.3 AFW ST-1A Relay Setup and Calibration (continued)

[9]

IF relay AFW ST-1A will NOT adjust within specified tolerance, THEN

[9.1]

INITIATE and RECORD CR/WO for repair/replacement.

CR/WO#:__________________

[9.2]

DOCUMENT failure under Remarks (Attachment 1).

[10]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "As Left" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 20.0 sec (19.0 sec to 21.0 sec)

PC

[11]

DISCONNECT Timing Device from relay.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 55 of 78 Date ________

6.9.3 AFW ST-1A Relay Setup and Calibration (continued)

[12]

CONNECT leads lifted in Step 6.9.3[2] to AFW ST-1A as designated below:

A.

Relay terminal point B1 wire # SA10CST IV B.

Relay terminal point M3 wire # SA10C4 IV C.

Relay terminal point T4 wire # SA10C2 IV D.

Relay terminal point T4 wire # SA10C2 IV E.

Relay terminal point T3 wire # SA10A1 IV F.

Relay terminal point B4 wire # SA10CN IV G. Relay terminal point M4 wire # SA10C3 IV H.

Relay terminal point M4 wire # SA10C3 IV

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 56 of 78 Date ________

6.9.3 AFW ST-1A Relay Setup and Calibration (continued)

[13]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point B1 B.

Relay, Terminal point M3 C.

Relay, Terminal point T4 D.

Relay, Terminal point T3 E.

Relay, Terminal point B4 F.

Relay, Terminal point M4

[14]

ENSURE test equipment used is removed.

PC

[15]

IF temporary wire markers were installed, THEN REMOVE markers.

[16]

NOTIFY Operations of relay test completion on Auxiliary Feedwater Pump 1A-A.

[17]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 57 of 78 Date ________

6.10 CSP ST-1A Relay for Containment Spray Pump 1A-A 6.10.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N765-7.

Clearance No:_______________

NOTE Relay CSP ST-1A is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 2 right side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.10.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Containment Spray Pump 1A-A, Relay CSP ST-1A. US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2, and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from Relay CSP ST-1A, and LCO 3.6.6 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 58 of 78 Date ________

6.10.3 CSP ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from Relay CSP ST-1A as designated below:

A.

Relay terminal point B1 wire # SA13ST PC B.

Relay terminal point B1 wire # SA13ST PC C.

Relay terminal point T1 wire # SA13C3 PC D.

Relay terminal point M1 wire # SA13C6 PC E.

Relay terminal point M1 wire # SA13C6 PC F.

Relay terminal point B4 wire # SA13CN PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 59 of 78 Date ________

6.10.3 CSP ST-1A Relay Setup and Calibration (continued)

[3]

CONNECT Timing Device to relay CSP ST-1A as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M1 and T1

[4]

MEASURE and RECORD "As Found" CSP ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 180.0 sec (171.0 sec to 189.0 sec)

PC

[5]

IF "As Found" is outside the acceptance criteria range, THEN

[5.1]

NOTIFY Supervision and US.

[5.2]

RECORD failure in work document prior to proceeding with step 6.10.3[6].

[6]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

[7]

IF relay CSP ST-1A will NOT adjust within specified tolerance, THEN

[7.1]

INITIATE and RECORD CR/WO for repair/replacement.

CR/WO#:__________________

[7.2]

DOCUMENT failure under Remarks (Attachment 1).

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 60 of 78 Date ________

6.10.3 CSP ST-1A Relay Setup and Calibration (continued)

[8]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "As Left" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 180.0 sec (171.0 sec to 189.0 sec)

PC

[9]

DISCONNECT Timing Device from relay.

[10]

CONNECT leads lifted in Step 6.10.3[2] to CSP ST-1A:

A.

Relay terminal point B1 wire # SA13ST IV B.

Relay terminal point B1 wire # SA13ST IV C.

Relay terminal point T1 wire # SA13C3 IV D.

Relay terminal point M1 wire # SA13C6 IV E.

Relay terminal point M1 wire # SA13C6 IV F.

Relay terminal point B4 wire # SA13CN IV

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 61 of 78 Date ________

6.10.3 CSP ST-1A Relay Setup and Calibration (continued)

[11]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point B1 B.

Relay, Terminal point T1 C.

Relay, Terminal point M1 D.

Relay, Terminal point B4

[12]

ENSURE all test equipment used is removed.

PC

[13]

IF temporary wire markers were installed, THEN REMOVE markers.

[14]

NOTIFY Operations of relay test completion on Containment Spray Pump 1A-A.

[15]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 62 of 78 Date ________

6.11 PHBA ST-1A Relay for Pressurizer Heater Backup 1A-A 6.11.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N765-10.

Clearance No:_______________

NOTE Relay PHBA ST-1A is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 2 left side.

WARNING Extreme care should be taken since circuits may be energized.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.11.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Pressurizer Heater Backup 1A-A, relay PHBA ST-1A. US/SM shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2, and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from relay PHBA ST-1A, and LCO 3.4.9 shall be evaluated.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 63 of 78 Date ________

6.11.3 PHBA ST-1A Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE following leads from Relay PHBA ST-1A:

A.

Relay terminal point B1 wire # SA20CST PC B.

Relay terminal point T4 wire # SA20CR PC C.

Relay terminal point M4 wire # SA20CN PC D.

Jumper terminal point M4 wire # SA20CN PC E.

Relay terminal point M3 wire # SA20C8 PC F.

Relay terminal point M3 wire # SA20C8 PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 64 of 78 Date ________

6.11.3 PHBA ST-1A Relay Setup and Calibration (continued)

G. Relay terminal point B4 wire # SA20CN PC H.

Relay terminal point T3 wire # SA20C7 PC I.

Relay terminal point T3 wire # SA20C7 PC

[3]

CONFIRM deenergized relay contact configuration as follows using VOM:

Contact M3 to T3: OPEN

[4]

CONNECT Timing Device to relay PHBA ST-1A as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-).

B.

STOP leads to terminals M4 and T4.

[5]

MEASURE and RECORD "As Found" PHBA ST-1A time delay value.

AS FOUND:________sec.

Acceptance Criteria: 90.0 sec (85.5 sec to 94.5 sec)

PC

[6]

CONFIRM Energized relay contact configuration as follows using VOM:

Contact M3 to T3: CLOSED

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 65 of 78 Date ________

6.11.3 PHBA ST-1A Relay Setup and Calibration (continued)

[7]

IF "As Found" is outside the acceptance criteria range, THEN

[7.1]

NOTIFY Supervision and US

[7.2]

RECORD failure in work document prior to proceeding with step 6.11.3[8].

[8]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

[9]

IF relay PHBA ST-1A will NOT adjust within specified tolerance, THEN

[9.1]

INITIATE and RECORD CR/WO for repair/replacement.

CR/WO#:__________________

[9.2]

DOCUMENT failure under Remarks (Attachment 1).

[10]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "AS LEFT" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 90.0 sec (85.5 sec to 94.5 sec)

PC

[11]

DISCONNECT Timing Device from relay.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 66 of 78 Date ________

6.11.3 PHBA ST-1A Relay Setup and Calibration (continued)

[12]

CONNECT leads lifted in Step 6.11.3[2] to PHBA ST-1A:

A.

Relay terminal point B1 wire # SA20CST IV B.

Relay terminal point T4 wire # SA20CR IV C.

Relay terminal point M4 wire # SA20CN IV D.

Jumper terminal point M4 wire # SA20CN IV E.

Relay terminal point M3 wire # SA20C8 IV F.

Relay terminal point M3 wire # SA20C8 IV G. Relay terminal point B4 wire # SA20CN IV

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 67 of 78 Date ________

6.11.3 PHBA ST-1A Relay Setup and Calibration (continued)

H.

Relay terminal point T3 wire # SA20C7 IV I.

Relay terminal point T3 wire # SA20C7 IV

[13]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point B1 B.

Relay, Terminal point T4 C.

Relay, Terminal point M4 D.

Relay, Terminal point M3 E.

Relay, Terminal point B4 F.

Relay, Terminal point T3

[14]

ENSURE test equipment used is removed.

PC

[15]

IF temporary wire markers were installed, THEN REMOVE markers.

[16]

NOTIFY Operations of relay test completion on Pressurizer Heater Backup 1A.

[17]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 68 of 78 Date ________

6.12

[NRC/C] CR-ST Relay for Main Control Room Air Handling Unit A-A

[NCO 910032004]

6.12.1 Clearances and M&TE

[1]

OBTAIN clearance on Power and Control circuits of equipment under Calibration, Referencing drawing 45N779-7.

Clearance No:_______________

NOTE Relay CR-ST is located in SHUTDOWN BOARD 1A-A LOGIC RELAY PANEL EL 734.0' Auxiliary Building; Panel 1 left side.

[2]

RECORD the following M&TE:

M&TE DESCRIPTION TVA ID #

CAL DUE Timing Device 125 VDC Power Supply Digital Multimeter (VOM) 6.12.2 Approvals and Notifications

[1]

OBTAIN the following approvals prior to beginning work on Main Control Room Air Handling Unit A-A, relay CR-ST.

US/SRO shall evaluate limiting conditions and restraints imposed by Technical Specification 3.8.1, 3.8.9, 3.8.2 and 3.8.10.

/

Unit 1 US (SRO)

Date

[2]

NOTIFY US that leads will be lifted from Relay CR-ST, and LCO 3.7.11 may be applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 69 of 78 Date ________

6.12.3 CR-ST Relay Setup and Calibration

[1]

ENSURE relay wiring is identified as required to ensure correct reconnection.

[2]

LIFT and TAPE leads from Relay CR-ST as designated below:

A.

Relay terminal point T1 wire # A12BCP PC B.

Relay terminal point M1 wire # A12BC4 PC C.

Relay terminal point M1 wire # A12BC4 PC D.

Relay terminal point M2 wire # A12BT2 PC E.

Relay terminal point R2 wire # A12BT3 PC F.

Relay terminal point B1 wire # A12BC6 PC G. Relay terminal point B4 wire # A12BCN PC H.

Relay terminal point B4 wire # A12BCN PC

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 70 of 78 Date ________

6.12.3 CR-ST Relay Setup and Calibration (continued)

[3]

CONFIRM deenergized contact configuration, using VOM:

Contact M2 to R2: CLOSED

[4]

CONNECT Timing Device to Relay CR-ST as designated below (refer to Attachment 2):

A.

START leads to terminals B1 (+) and B4 (-)

B.

STOP leads to terminals M1 and T1

[5]

MEASURE and RECORD "As Found" CR-ST time delay value.

AS FOUND:________sec.

Acceptance Criteria: 220.0 sec (209.0 sec to 231.0 sec)

PC

[6]

CONFIRM energized contact configuration, using VOM:

Contact M2 to R2: OPEN

[7]

IF "As Found" is outside the acceptance criteria range, THEN

[7.1]

NOTIFY Supervision and US.

[7.2]

RECORD failure in work document prior to proceeding with step 6.12.3[8].

[8]

IF time delay value exceeds specified tolerance, or adjustment of relay is desired, THEN ADJUST relay as required.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 71 of 78 Date ________

6.12.3 CR-ST Relay Setup and Calibration (continued)

[9]

IF Relay CR-ST will NOT adjust within specified tolerance, THEN

[9.1]

INITIATE and RECORD CR/WO for repair/replacement CR/WO#:__________________

[9.2]

DOCUMENT failure under Remarks (Attachment 1).

[10]

IF relay was adjusted or replaced, THEN MEASURE and RECORD "AS LEFT" time delay value.

AS LEFT:________sec.

Acceptance Criteria: 220.0 sec (209.0 sec to 231.0 sec)

PC

[11]

DISCONNECT Timing Device from relay.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 72 of 78 Date ________

6.12.3 CR-ST Relay Setup and Calibration (continued)

[12]

CONNECT leads lifted in Step 6.12.3[2] to CR-ST:

A.

Relay terminal point T1 wire # A12BCP IV B.

Relay terminal point M1 wire # A12BC4 IV C.

Relay terminal point M1 wire # A12BC4 IV D.

Relay terminal point M2 wire # A12BT2 IV E.

Relay terminal point R2 wire # A12BT3 IV F.

Relay terminal point B1 wire # A12BC6 IV G. Relay terminal point B4 wire # A12BCN IV H.

Relay terminal point B4 wire # A12BCN IV

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 73 of 78 Date ________

6.12.3 CR-ST Relay Setup and Calibration (continued)

[13]

TIGHTEN the following termination points per Mechanics Feel. [MMTP-104]

A.

Relay, Terminal point T1 B.

Relay, Terminal point M1 C.

Relay, Terminal point M2 D.

Relay, Terminal point R2 E.

Relay, Terminal point B1 F.

Relay, Terminal point B4

[14]

ENSURE test equipment used is removed.

PC

[15]

IF temporary wire markers were installed, THEN REMOVE markers.

[16]

NOTIFY Operations of Relay Test completion on Main Control Room air Handling Unit A-A.

[17]

PROCEED to next relay under test or Section 7.0 as applicable.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 74 of 78 Date ________

7.0 POST PERFORMANCE ACTIVITY 7.1 Testing None 7.2 Restoration

[1]

RELEASE Clearances.

[2]

ENSURE work area is clean in accordance with site instructions.

[3]

ENSURE as-left conditions acceptance criteria are satisfactory, or deficiencies documented and CR/WO initiated.

FLS/Designee

[4]

NOTIFY Unit 1 US/SRO and SM that all work is complete on Relays.

FLS/Designee 7.3 Summarizing Results

[1]

REVIEW completed work in work document, AND CONFIRM Instruction satisfactorily completed.

FLS/Designee

[2]

IF an Adverse Condition was identified, THEN EVALUATE the need for a CR.

CR/etc.:___________________

8.0 RECORDS This completed package is considered a QA record.

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 75 of 78 (Page 1 of 1)

Remarks CR/WOs DESCRIPTION OR COMMENTS NAME DATE COMMENTS

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 76 of 78 (Page 1 of 1)

Test Equipment Connection NOTE Typical connection hookup for reference only, connect per Work Instructions. Reference for Programma timer Setup.

Agastat TDR Type ETR Contact Diagram To External Power Supply SPST Test Switch Start External Stop Trigger Stop trigger to points as specified by Work Inst.

M&TE Timing Device M1 R3 M3 T1 R1 B3 B1 M2 T3 T4 R4 B2 T2 R2 B4 M4 B3 B4 T3 T4 M3 M4 R1 R2 T2 M2 R4 R3 M1 B2 B1 T1 Front View of ETR type relay COIL

(-)

(+)

(-)

(+)

(+)

(-)

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 77 of 78 (Page 1 of 2)

Programma, TM200 Timer Setup Refer to Page 2 of Attachment for Start Setup Refer to Page 2 of Attachment for Stop Setup

SQN Unit 1 Setpoint Verification and Calibration for Time Delay Relays Associated With Automatic Load Sequence Timers 1-SI-EDC-202-220.A Rev. 0018 Page 78 of 78 (Page 2 of 2)