Text
4 REGULATORY
<<IFORMATION DISTRIBUTION S EM. (RIDS)
ACCESSION NBRe8401240415>>
DOC ~ DATE: 84/01/19 NOTARIZED:
NO
,FACILa50 335"'St-,""Lucie Plantr Uni<<t ip Florida Power 8 Light>> Co, AUTH~ NAME'.
AUTHOR AFFILIATION HILLIAMSgJoN.. -Florida <<Power.I<<'ight Co, HEC'IP ~ NAME RECIPIENT. AFFILIATION EISENHUTrD ~ G ~
=Division of Licensing
SUBJECT:
Fonwar ds "addi info->>r<<e'fire'r otection "in r.esponse>><<to 831'027
'concerns;Co'Id shutdown can be,'chieved wi,thin 72 h w/,loss of offsi te: power,Plant>> operators
<>COPIES RECEIVED:LTR.- ENCL.,- SIZE:- iT?TLEc OR 'Submit>>teal". Fir e <<Protection NOTES! DOCKET< 0 05000335 REC IP IENT~ ID CODE/NAME, NRA ORB3;<<BC; 01, INTERNALS ELD/HDS2' E/NHIrTNEYr L i NRR WAMBACH ,NRA/DL DIR RGA2 <<COPIES" LT<> r3r>>3 1 0 .i 0 i 1 i RECIPIENT ID CODE/NAME IE( FILE:. 06 'NRR. FIORAVANT07 CEB 09 04 <<COPIES'.TTR"ENCL" 2 2 2J 2I 1 1 <<EXTERNALS 'CRS NRC,PDR NT 1'S 11>> 02! LPDR NSIC 03 05 1 1 1 1 iTOTAL NUMBER,.OF COPIES REQUIRED!. LTTR 21 ENCL. 19 a ~ ~Ck Ck1'c g f ic 4c~ 'll f 'I I II'l 'lc'ci ice'I k~l f 'k." f Ic ti i I,',,I f k I c i ) <<r ~4k>> l'> ~~r '1',k ci i l ['chic If 'll c')>f ) 40 <<<ifc'r>t Ic, i,ii ]if f c~g' ee c + )f, III ~ k i P 'I l.l< ~ ck~ ~ a"'g f "<< "i l.'I r',I/I'," i f f g'II ~ z-cI [ c keg )'II'II W I~ ic'I g g i', i l ~I'1r'lcq'1 i il lIIgtciIg fi c I "i' 'lc i i i i, Ic II,, c,f/.IIcc c fc"~ 8~c'kick') IIII'A i c, A( IIlkbg I 'I F'c <kit i IIill sl.y II cl'I )c < I~ cia i IVQC It )1g c i I jf )kl /I lg~+ fc'gcccg , III It~i I 3 5 I 'kI ', 'f'll 'rcl c,gk' i...,, I I c'k jlI 3I',illk'etc'$ s f'i c",Q T'l c 4, < ,.lg",g A<X )I I! 'll i 'II il 'r,kI T1 k-c! 'S i ilk< c 4' ",,'c,kIQWJ I kk [pl '1 'I II I ccc c BOX 14000, JUNO BEACH, FL 33408 FLORIDAPOWER 8( LIGHT COMPANY January 19, 1984 L-84-12 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Eisenhut:
Re:
St. Lucie Unit No.
I Docket No. 50-335 Fire Protection - Additional Information The attached additional information is in response to concerns identified during a telecon with members of your staff on October 27, I 983.
Very truly yours, J. W. Williams; Jr.
Vice President Nuclear Energy JW W/RJS/cab Attachment PO06 84012404i5 840ii9 PDR ADOCK 05000335 F
PDR'.
PEOPLE... SERVING PEOPLE
t
Fire Protection - Additional Information NRC Concern No. I:
~FPL R NRC Concern No. 2:
~FPL R NRC Concern No. 3:
~FPL ~
Can St. Lucie Unit I achieve cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with loss of offsite power?
St. Lucie Unit I can achieve cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with loss of offsite power.
ls the Refueling Water Storage Tank (RWST) indication included on the alternate shutdown panel?
RWST level indication is not included on the alternate shutdown panel.
The RWST level is a
Technical Specification requirement, and unless there is a system failure (pipebreak) concurrent with the fire, there is much more than adequate water to achieve cold shutdown.
Furthermore, within the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> cold shutdown requirement, operators can verify RWST tank level at the local instrumentation for the tank.
Therefore RWST level indication is not necessary on the alternate shutdown panel.
Are fuses pulled to close the-PORV's, steam generator dump valves, and the'main steam isolation valves?
Fuses are not pulled to close the PORV's steam generator dump valves, or the main steam isolation valves.
NRC Concern No. 4:
~FL NRC Concern No. 5:
~FP L ~
NRC Concern No. 6:
~FP L ~
Are the control cables for the "C" auxiliary,feedwater pump separated from the "A" and 'B" pumps such that they meet the requirements of Appendix R, III.G.2?
The control cables for the auxiliary feedwater pumps meet the requirements of Appendix R, lll.G.2.
Is the loss of pressurizer heaters precluded or emergency procedures prepared for the appropriate operator action?
Loss-of pressurizer heaters is an event that the plant operators are trained and qualified for.
Emergency procedures are not prepared for specific equipment
- failures, such as loss of pressurizer heaters.
Is sufficent manpRowei available to fight a fire and safety shutdown the plant?
The Draft procedure submitted in our Alternate Shutdown submittal (FPL letter L-83-5 I 4 dated October 7,
I 983) indicated that personnel are available simultaneously to man the 5 man fire brigade and accomplish alternate shutdown.
NRC Concern No. 7:
~FPL R Regarding associated
- circuits, is circuit coordination an on-going program?
Circuit breaker and fuse coordination is a
generic design consideration for all plant modifications that affect electrical equipment or circuits.