e <<<<-

DOCKET 0

05000389 NOTES; REGULATOR Y I RMATION DISTRIBUTION SYS (RIDS)

AOCBSSION NBR:8302180460 OOC ~ DATE'3/02/1'5 NOTARIZED:

NO FAGIL:50~389 St, Lucie Planti Uniit Zr Florida Power 4 Light Co ~

AUTH~ NAME AUTHOR AFFILIATION UHRIGr R ~ Es

,Flor ida.Power 8 Light Co,

<<RECIP ~ NAME RECIPIENT AFFILIATION

<<EI'SENHUTiDi G ~

Divisi on of Licensing

SUBJECT:

Forwards."Const/Startup iProgress Rept for Jan 19830,"

,DISTRISUTION CODE:

SOOIS iCOPIES RECEIVED<<LTR. ~ ENCL.J SIZE:.~ g+<<

TlTLE:'icensing Submi t;tal:

PSAR/FSAR Amdts 8, Related Cor respond~nc~

RECIPIENT, IO CODE/NAME A/0 LICENSNG LIC BR A3 LA INTERNAL~

El D/HDS2 IE/DEP EPOS "35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB

<<30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/OHFS/HFEBOO NRR/DL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRH/DSI/METB 12.

XJ 8

Zi?-

G 0$

RM/DOAMI/MI8

<<EXTEiRNAL~

ACRS Qf<<

DMB/DSS (AMDTS)

LPDR 03-NSIC 05

<<COPIES CTTR ENCL" 1

0 0

1 0

1 1

1 0

2 2

i 1

1 1

1 1-

~ 1 1

'0 1

1 1

1 1

1 0

6

-6 1

1 1

RECIPIENT ID 'CODE/NAME LIC BR 03 BC NERSESr0

~

01 IE FILE IE/OEP/EPLB 36 NRR/DE/CEB il NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DS I/ICSB 16 NRR/DSI/PSB 19 NRR/OS I'/RSB 23 RGNZ BNL(AMDTS ONLY)

FEMA>>REP DIV 39 NRC PDR 02'TIS COPIES LTTR ENCL 1

0 1

1 1

1 3

3 1

2 2

1 1

1 1

1 1

,1 1

1 1

1 1

1 1

1 1

1

<<3 1

1 1

1 1

1 TOTAl NUMBER OF COPIES REQUIRED:

LTTR 52 ENCL 45

il Ji U>>-

$ >>y 'Ig "I< g>>

g

<,J U>><g U

)

i 'I UI el

<~l,il ~

11 j e yij 'I '

, )

yU 'Il) ~ 7, j ghj Ij >J JUU i, U'UU> IJ<,$ 4q'>>

1 J't "1l

~ I'ljJU i

I Ij j

~

j

< >'UJ,J'Jj,y>>g<

<U 1

4 0

llj)U)'f<.,'l,U sir, f>>U I,y,,'!, <<

"<L., Ijh j <,', fy War UU 'jraa yet ),"3 ll'I jj,f 9f)

J

.)

$ j 11

P.

'3X 14000, JUNO BEACH, FL 3340B FLORIDA POWER & LIGHT COMPANY February 15, 1983 L-83-77 Office of Nuclear Reactor Regulation Attention:

)1r. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Nr. Eisenhut:

Re:

St. Lucie Unit No.

2 Docket No. 50-389 Construction/Start-u Pro ress U date Attached is the report of the construction/start-up progress for St. Lucie Unit No.

2 for January 1983.

If you have any questions regarding the at-tached information, or would like additional information from Florida Power and Light Company (FPL), please feel free to call me or W. B. Derrickson, the St. Lucie Unit No.

2 Project General Manager, at (305)863-3044.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/RJS/njb Attachment cc:

William H. Lovelace, Office t1anagement 8 Program Analysis U. S. Nuclear Regulatory Commission J.

P. O'Reilly, Regional Administrator, Region II Harold F. Reis, Esquire 8302i80460 8302i5 PDR *DOCK 05000380 PDR PEOPLE... SERVING PEOPLE

RIDA POWER 6 LIGHT COMPANY ST.

LUCIE UNIT 2 CONSTRUCTION/START-1.

MONTHLY STATUS REPORT CURRENT PERIOD:

SCHEDULE STATUS:

JANUARY 1983 OVERALL PROJECT CONSTRUCTION/START-UP CRITICAL PATH VARIANCE TARGET FUEL LOAD DATE Percent complete not applicable at this stage of project 21.0 10/28/82 (Original Schedule)

A re-evaluation of the project schedule, completed December 1982, places the current. fuel load date at March 23, 1983 ACTUAL 01/03/83 01/04/83 N/A SCHEDULED 01/01/83 02/01/83 N/A N/A

~

N/A AVERAGE MONTHLY INST.

RATE C

(QTY/MO) 10%-90%

10/28 TO DATE FORECASTED

'OTAL QTY QTY PERCENT CURRENT INSTALLED COMPLETE MONTH TO DATE TO DATE MAJOR WORK HIGHLIGHTS:

1.

Begin construction of Radiation Control Access Bldg.

2.

Complete interior painting of Dry Storage Warehouse 3.

Work"on eleven (11) PTO's and ten '(10) CTO's, in support of core load, was:. completed and turned over to FPaL this period.

Systems included were the re-fueling machine, communications and security.

4.

The Diesel Generator Building and the Component Cooling Building were turned over to aslant-Operations 'this period.

'ULK QUANTITY STATUS:

(Quantities include items equired after Core Load)

Concrete (cy)

Large Bore Piping (lf)

Small Bore Piping (lf)

Instrument Tubing (lf)

Large Bore Hangers (ea)

>>hippirg Restraints Cable Tray (lf)

Conduit (Exp.,Emb.,U/D)(lf)

Lighting Conduit Power Cable Pull (lf)

Control Cable Pull (Inc.

Comm. ) (1f)

Signal Cable Pull (lf)

Terms Pwr Hi (ea)

Terms - Pwr Zo (ea)

Terms Control (ea)

Terms - Signal (ea) 141, 045 79,985 92,465 116,004 4,160 548 40,058 417, 120 117, 174 537,784 2,167,862 1,277,848 483 12,302 58,998 32,593 99.8 99.6 96.4 94.9 94.5 95.1 99.0 96.3 98.1 97.7 97.3 95,9 97.8 95.4 90.7 95.9 217 60 50 205 42 9

130 6,988 3,666 14,623 63,578 68,451 216 2,301 3,904 ESSENTIALLY ESSENTIALLY ESSENTIALLY ESSENTIALLY ESSENTIALLY ESSENTIALLY ESSENTIALLY ESSENTIALLY ESSENTIALLY'SSENTIALLY COl1PLETE COMPLETE COMPLETE COMPLETE COMPLETE COMPLETE COMPLETE COMPLETE COMPLETE COMPLETE ESSENTIALLY COMPLETE ESSENTIALLY COMPLETE ESSENTIALLY COMPLETE ESSENTIALLY COMPLETE ESSENTIALLY COMPLETE ESSENTIALLY COMPLETE SCHEDULED TO DATE System Turnover (PTO) 323 System Turnover (CTO) 162 Preoperational Test Procedures 229 Pr'eoperational Test Performed 229 COMPLETED TO DATE 323 145 228 76 SCHEDULED PER MONTH, 27 28 1

154 CURRENT MONTH 12*

12*

0 17/87**

TOTAL RE UIRED 327 167 229 229 INOTE:

  • NOTE:
    • NOTE INFORMATION CURRENT AS OF PROJECT SCHEDULE DATED Ol/31/83 INCLUDES PACKAGES IN SIGN-OFF CIRCUIT INCLUDES PREOPERATZONAL TESTS IN PROGRESS, 125 PREOPERATIONAL TESTS WERE PERFORMED DURING THE HOT OPS MILESTONE.

SOME OF THESE ARE WAITING ON CLEARING UP EXCEPTIONS TO TOTALLY CLOSE OUT THE PREOP.

SPECIAL TEAM ASSIGNED TO START-UP TO CLEAR UP EXCEPTIONS TO CLOSE OUT THE PRE-OPS BY CORE LOAD.

", r