Forwards SER Re Main Steam Line Break W/Continued Feedwater Addition.Analysis Acceptable
ML17213B014
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/17/1983
From: Clark R
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17213B015 List:
References
IEB-80-04, IEB-80-4, NUDOCS 8302010013
Download: ML17213B014 (3)


Text

Docket No. 50-335 Sincerely, 0" gtflaI st fled Robert A Cjark Robert A. Clark, Chief.

Operating Reactors Branch 83 Division of Licensing

\\

Encl osur e:

As. stated cc w/enclosure:

See next page DISTRIBUTION:

~~l2 1S83

~ocket File NRC PDR L PDR NSIC ORB83 Rdg DEisenhut JHeltemes OELD Dr. Robert E. Uhrig ELJordan Vice President JMTaylor Advanced Systems

& Technology ACRS-10 Florida Power &.Light Company RAClark P..O.

Box 529100 PMKreutzer-3 Miami, Florida 33152 DSel 1 s ETourigny

Dear Dr. Uhrig:

Gray File

~ e The staff and its consultant, Franklin Research

Center, have completed the review of your analysis of a.main steam line break with continued feedwater addition for the St. Lucie PlantUnit 1.

,Your.submittals dated Hay 8, 1980, July 23, 1981, October 20, 1981, and August 9, 1982 on this subject were in response to IE Bulletin 80-04 issued February 8, 1980 and requests for additional. information.

Based on our review, we conclude that your analysis is acceptable and no further action is required of you regarding.this subject.

In your Hetter of January 3, 1983 (L-83-4) you indicated that the analysis. of a Hain Steam. Line Break Upwith modigied system parameters will not be submitted. until about Hay.1, 1983.

The staff will consider this forthcoming submittal as a.separate plant specific licensing action when it is rgceived.

Our Safety Evaluation is enc'Iosed,

~ 83020iOOi3 830ii7 PDR ADOCK 05000335 P

PDR J

OFFICEI SURNAME/

DA7E $

ORB83 L

P zer 1 Q(83 OR D

DL 83 ORB1I3:D

..>//2/k>,........

~ ~ ~ ~ ~ ~

RA lark

~ ~I~ ~ 0 ~

~ ~

~

..1/.0 JB.3..

NRG FORM 318 (10-80) NRCM 0240 OffICIAL R ECOR D COPY VSOPO'981~r960

0 C

)

'rlorida Power 8 Light Company CC:

Harold F. Reis, Esquire Lowenstein,

Newman, Reis

& Alexrad 1025 Connecticut

Avenue, N.W.

Washington, D.

C.

20036 Norman A. Coll, Esquire McCarthy, Steel, Hector 8 Davis 14th Floor, First National Bank Building Miami Florida 33131 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida

. 32304 Resident Inspector c/o U.S.N.R.C.

7900 S.

A1A Jensen Beach, Florida 33457 Administrator Department of Environmental Regulation Power Plant Siting Section State of F.lorida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. L'ewis County Administrator St. Lucie County 2300.Virginia Avenue, Room 104 Fort Pierce, Florida 33450 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, N.E.

Atlanta, Georgia 30308 Mr. Charles B. Brinkman.

Manager' Washington Nuclear. Operations C-E Power Systems Combustion Engineering, Inc.

4853 Cordell Avenue, Suite A-1

Bethesda, Maryland 20014 State Planning and Devel pment Clearinghouse.

Office of Pl arming and Budgeting Executive Office of the Governor The Capitol Building Tal 1 ah as see, Florida 32301 Regional Administrator Nuclear Regulatory Commission, Region II Office of Executive Director for Operations 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 '