Forwards IE Insp Repts 50-335/81-30 & 50-389/81-30 on 811011-1124 & Notice of Violation
ML17212B445
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/08/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17212B442 List:
References
NUDOCS 8203170335
Download: ML17212B445 (4)


See also: IR 05000335/1981030

Text

JAN 08 1982

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0.

Box 529100

Niami,

FL

33152

Gentlemen:

Subject:

Report

No

50-335/81-30

and 50-389/81-30

This refers to the routine safety inspection

conducted

by tir. S.

A. Elrod of

this office on October

11 - November 24,

1981, of activities authorized

by

NRC

Operating

License

No.

DPR-67 for the St. Lucie Unit 1 facility.

Our preliminary

findings were discussed

with Hr.

C.

N. llethy, Plant tanager,

at the conclusion

of the inspection.

Areas examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

llithin these

areas,

the inspection

consisted of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

During the inspection, it was found that certain activities under your license

appear

to violate

NRC requirements.

This item and references

to pertinent

requirements

are listed in the Notice of Violation enclosed

herewith

as

Appendix A.

Elements

to

be included in your response

are delineated

in

Appendix A.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosures will

be placed in the

NRC's Public Document

Room unless

you notify this office, by

telephone,

within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must

be consistent with the requirements

of

2.790(b)(l).

The responses

directed

by this letter and the enclosures

are not subject to the

clearance

procedures

of the Office of Hanagement

and Budget as required

by the

Paperwork

Reduction Act of 1980,

PL 96-511.

Should you

have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosures:

(See

page

2)

Paul J. Kellogg, Chief

Reactor Projects

Branch

2

Division of Resident

and Reactor

Project Inspection

~~ M03170335 82aSi5

PDR

ADOCK 05000335

q"O',,

', PDR

I

l

lf

~

~

I

Florida Power and Light Company

JAN 08

1982

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection

Report

No. 50-335/81-30

, cc w/encls:

C. H. llethy, Plant Manager

N. lteems, Assistant

gA

Construction

Manager

B. J.

Escue,

Plant

Manager

bcc w/encls:

NRC Resident

Inspector

Document

Management

Branch

State of Florida

RII

KLandis:gr

I/5 /82

HCDance

1/~ /82

RII

PL'Ylo g

I/p /82

P

N

f

~ W

i(

P4<<.')

~.y

J

l'

I

U

r

I

\\

0