Forwards IE Insp Repts 50-335/81-31 & 50-389/81-24 on 811123-25 & Notice of Violation
ML17212B363
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/14/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17212B361 List:
References
NUDOCS 8202050432
Download: ML17212B363 (4)


See also: IR 05000335/1981031

Text

DEC 14

19S1

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report Nos. 50-335/81-31

and 50-389/81-24

This refers

to

the

routine

safety

inspection

conducted

by

Mr. W.

P.

Ang of

this office on

November 23-25,

1981,

of activities authorized

by

NRC Operating

License

No.

DPR-67

and

Construction

Permit

No.

CPPR-144

for the

St.

Lucie

facilities.

Our

preliminary

findings

were

discussed

with

Mr. C.

M. Wethy,

Plant

Manager - St.

Lucie

1

and

Mr. B. J.

Escue,

Plant

Manager

St.

Lucie 2

at the conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings are'iscussed

in the

enclosed

inspection'eport.

Within these

areas,

the

inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

During the inspection, it was found that certain activities

under your license

appear

to violate

NRC requirements.

This

item

and

references

to pertinent

requirements

are

listed

in

the

Notice

of Violation enclosed

herewith

as

Appendix A.

Elements

to

be

included

in your

response

are

delineated

in

Appendix A.

We

have

examined

actions

you

have

taken

with regard

to previously

reported

unresolved items.

The status of these

items is discussed

in the enclosed report.

In accordance

with 10 CFR 2.790(a),

a copy of this letter

and the enclosures will

be placed in the

NRC's Public

Document

Room unless

you notify this office,

by

telephone,

within ten

days

of the

date

of this letter

and

submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application

must be consistent with the requirements

of 2.790(b)(1).

The responses

directed

by this letter and the enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork Reduction Act of 1980,

PL 96-511.

8202050432

820i27

PDR

ADGCK 05000335,)~

'K

~

e

~

\\

~

~

DEC l 4 lgal

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-335/81-31

and 50-389/81-24

cc w/encl:

C.

M. Wethy, Plant Manager

N. Weems, Assistant

QA

Construction Manager

B. J.

Escue,

Plant Manager

bcc w/encl:

NRC Resident Inspector

Document Management

Branch

State of Florida

Paul J. Kellogg, Chief

Reactor Projects

Branch

2

Division of Resident

and

Reactor Project Inspection

12/8'/81

12/g/81

RII

CEMurphy

12/g /81

RII+

KLandi s

12/ti/81

RI

logg

12/// /81

~

I

(

0

C