Forwards IE Insp Rept 50-335/81-32 on 811125-1210.No Noncompliance Noted
ML17212B357
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/18/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17212B358 List:
References
NUDOCS 8202050201
Download: ML17212B357 (3)


See also: IR 05000335/1981032

Text

0

JAN 1 Sl~

~HOZ~CPgt

Florida Power

and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced

Systems

and Technology

P'. 0.

Box 529100

thiami,

FL

33152

Gentlemen:

Subject:

Report

Ho.

0-335/81-32

50

~l@ 8f

- l7

47g%pg~

8p~ /

)

lw

This refers to the routine safety inspection

conducted

by Hr. S.

A. Elrod of

this office on November

25 - December

10,

1981, of activities authorized

by

NRC Operating

License

No.

DPR-67 for the St. Lucie facility.

Our preliminary

findings were discussed

with ter.

C. hi'. Wethy, Plant tlanager, at the conclusion

of the inspection.

Areas

examined

during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection

consisted of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspectors.

Within the

scope of this inspection,

no violations or deviations

were

disclosed.

We have

examined actions

you have taken with regard

to previously identified

enforcement matters

and unresolved

items.

The status of these

items is dis-

cussed

in the enclosed

report.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure will

be placed in the NRC's Public Document

Room unless

you notify this office, by

telephone,

within ten days of the date of this letter and submit written

application to withhold information contained

therein within thirty days of the

date of this letter.

Such application must

be consistent

with the requirements

of 2.790(b)(l).

Should you

have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

e

Enclosure:

Inspection

Report

No. 50-335/81-32

Paul J. Kellogg, Chief

Reactor Project

Branch

2

Division of Resident

and

Reactor Project Inspection

cc's

see

page

2

. 82020S020i 820ii8

PDR

ADOCK 05000335

~ 8

,

.

PDR

ME@>/ ~/

0 ~

0

'I I

0

Florida Power and Light Company

cc w/encl:

C.

M. Wethy, Plant Manager

N.

Weems, Assistant

gA

Construction

Manager

B. J.

Escue,

Plant

Manager

bcc w/encl:

NRC Resident

Inspector

Document

Management

Branch

Sta te of Flori da

R I

SE

od:dt

I/

/82

RI@I)y

KL ndis

I/>>/82

1/il /82

RII

PJK 1logg

I/, /82

(4-