ML17212B254
| ML17212B254 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 10/16/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17212B252 | List: |
| References | |
| NUDOCS 8112230320 | |
| Download: ML17212B254 (4) | |
See also: IR 05000335/1981022
Text
OCT 1 6 ~88>
Florida Power
and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced
Systems
and Technology
P. 0.
Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report
Nos.
-335/81-22
d 50-389/81-18
This refers to the routine safety inspection
conducted
by Mr. S,
A. Elrod of this
office on August ll - September
10, 1981, of activities authorized
by
NRC
Operating
License
No.
DPR-67 and Construction
Permit
No.
CPPR-144 for the
St. Lucie
1 and
2 facility.
Our preliminary findings were discussed
with
Mr. C.
M. Wethy, Plant Manager, at the conclusion of the inspection.
Areas examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was found that certain activities under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as
Appendix A.
Elements
to
be included in your response
are delineated
in
Appendix A.
We have
examined actions
you have
taken with regard to previously identified
enforcement matters.
These
are discussed
in the enclosed
inspection report.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
report will be placed
in the
NRC's Public Document
Room.
If the report contains
any information that you believe to
be exempt
from
disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this
office by telephone within ten days
from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days
from the date of this letter
a written application to this office to
withhold such information.
If your receipt of this letter
has
been
delayed
such
that less
than
seven
days are available for your review, please notify this
office promptly so that
a
new due date
may
be established.
Consistent
with
section 2.790(b)(1),
such application must
be accompanied
by an affidavit
executed
by the owner of the information which identifies the document or part
thereof sought to
be withheld, and
a full statement
of the reasons
on the basis
of which it is claimed that the information should
be withheld from public
disclosure.
This section further requires
the statement
to address
with
specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall
be incorporated
as far as possible
into a separate
Sfi2230320 Sii2i5
i',
ADOCK 05000335li
6
1
'lP
I
e
Florida Power
8 Light Company
OCT) 6 '88
t
part of the affidavit. If we do not hear
from you in this regard within the
specified
periods
noted above,
the report will be placed
in the Public Document
Room.
Should you
have any questions
concerning this letter,
we wil.l be glad to discuss
them with you.
I'incerely,
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection
Report
Nos.
50-335/81-22
and 50-389/81-18
cc w/encl:
C. N. Wethy, Plant tanager
t
N.
Weems, Assistant
gA
Construction
Nanager
B. J.
Escue,
Plant tlanager
bcc w/encl:
NRC Resident
Inspector
Document
Management
Branch
State of Florida
Paul J. Kellogg, Chief
Projects
Branch 2, Division of
Resident
and Reactor Project
Inspection
RI I
SElro
dt
e &I</81
RII
HCDan
e
(g/ +81
RII
zB.
KLan is
~o Pli5 /81
RII
'J
ogg
P
~/81
li
n
I
C
H
u
I
lf
'4
II
~
>>
E
h
J