ML17209A955
| ML17209A955 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/11/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17209A953 | List: |
| References | |
| NUDOCS 8104200450 | |
| Download: ML17209A955 (3) | |
See also: IR 05000335/1980038
Text
gP,8 RECI
P
+
0
~y
Ip
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
Power and ~ight Company
EB l 1981
FEB 11
ATTN:
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P.
O. Box 529100
Miami, FI,
33152
Gentlemen:
Subject:
Report No. 50-335/80-38
This refers
to the routine safety inspection
conducted
by S. A. Elrod of this
office on December
1-31,
1980, of activities authorized
by NRC Operating Iicense
No.
DPR-67 for the St. Iucie facility.
Our preliminary findings were discussed
with C.
M. Wethy at the conclusion of the inspection.
Areas
examined
during the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspe'ction
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was
found that certain activities under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response
are delineated in Appendix A.
We have
examined
actions
you have
taken with regard
to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
Three
new unresolved
items are identified in the enclosed
inspection report.
These items will be examined during subsequent
inspections.
In accordance
with Section 2.790 of the
NRC "Rules of Practice," Part 2, Title
10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspec-
tion report will be placed in the
NRC Public Document
Room. If this report
contains
any 'information that you believe to be proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold
such information from public disclosure.
Any such application must include the
basis
for claiming that
the
information is proprietary
and
the proprietary
information should
be contained in a separate
part of the
document.
If we do
not hear from you in this regard within the specified period,
the report will be
placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
810,.420 0 /$0
Zc.
R.
C.
wis, Acting Chief
Reactor Operations
and Nuclear
Support Branch
Enclosure:
(See
Page
2)
0
Florida Power and Light Company
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report. No. 50-335/80-38
cc w/encl:
CD
M. Wethy, Plant Manager
Nat Weems, Assistant
Construction
Manager
rs