Forwards IE Insp Rept 50-335/80-36 on 801110-28.No Noncompliance Noted
ML17209A699
Person / Time
Site: Saint Lucie 
Issue date: 01/29/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17209A700 List:
References
NUDOCS 8103050417
Download: ML17209A699 (4)


See also: IR 05000335/1980036

Text

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N,W., SUITE 3100

ATLANTA,GEORGIA 30303

JAN39 ~se>

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FI

33152

Gentlemen:

gpss/////~

,cI

"

PI jg+,

1g8

sM~,~ la

k Ir

~Sf~

Subject:

Report No

0-335/80-36

This refers

to the inspection

conducted

by

S.

A. Elrod of this office

on

November 10-28,

1980 of activities

authorized

by

NRC Operating

License

No.

DPR-67 for the St. Lucie

1 facility, and to the discussion of our findings held

with J. H. Barrow at the conclusion of the inspection.

Areas

examined

during

the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within the scope of this inspection,

no items of noncompliance were disclosed.

We have

examined

actions

you have

taken with regard

to previously identified

enforcement matters

and unresolved

items.

The status of these items is discussed

in the enclosed report.

One

new unresolved

i.'tern resulted

from this inspection

and is discussed in the

enclosed report.

This item willbe examined during subsequent

inspections.

In accordance

with Section 2.790 of the

NRC's

"Rules

of Practice",

Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be. placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written -application within 20 days

to this office to withhold such information from public disclosure.

Any such

application

must include

a full s'tatement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should

be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document. If we do not hear from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

/

V

A

~

~

v

i,

IL

II

'N

g g

P

fl

))

./

Florida Power

& Light Company

JAN 29 ~ss.1

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

-C.

ichar

C. Lewis, Acting,Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-335/80-36

cc w/encl:

C.

M. Wethy, Plant Manager

Nat Weems, Assistant

QA

Construction

Manager

I

(