Forwards IE Insp Rept 50-335/80-21 on 800708-11,notice of Violation & Notice of Deviation
ML17209A178
Person / Time
Site: Saint Lucie 
Issue date: 08/04/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17209A175 List:
References
NUDOCS 8010030086
Download: ML17209A178 (3)


See also: IR 05000335/1980021

Text

~8 RE<0

D$

~0

+**++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

AUG -ztgso

In Reply Refer To:

'RII:WHM

50"335/80-21

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P,. 0. Box 529100

Miami, FX

33152

Gentlemen:

This refers to the inspection

conducted by W. H. Miller, Jr., of this office on

July 8-11,

1980, of activities authorized

by

NRC Operating License

No.

DPR-67

for the St. Lucie facility, and to the discussion

of our findings held with

C.

M. Wethy at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Five new unresolved

items resulted

from this inspection

and are discussed

in the

enclosed report.

These items willbe examined during subsequent

inspections.

During the inspection, it was found that certain activities under your license

appear

to be in noncompliance

with NRC requirements.

This item and references

to pertinent, requirements

are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.2Q1

of the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201- requires

you to submit to this office, within 20 days of your

receipt of this notice,

a written statement

or explanation in reply including:

(1) corrective steps

which have been taken by you and the results

achieved;

(2)

corrective steps

which will be taken to avoid further noncompliance;

and (3) the

date when full compliance, will be achieved.

During the inspection it was

found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

This item identified in the Notice of Deviation enclosed herewith as Appendix B.

Please

provide us in writing within 20 days of your receipt of this letter your

comments including a description of corrective actions that have been or will be

taken,

corrective actions

which will be taken to avoid further deviations;

and

the date corrective actions were or willbe completed.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

'itle

10,

Code of Federal

Regulations,

a

copy of this letter and the enclosed

~

~

inspection report will be placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

80 >003 0~Eh

Florida Power and Light Company

AUG -4 1980

application must include

a full statement

of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should'be

prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document. If we do not hear from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murph , Chief

Reactor Construction

and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report No. 50-335/80-21

cc w/encl:

~

~

C.

M. Wethy, Plant Manager

Nat Weems, Assistant

QA Manager

0

1