ML17209A178
| ML17209A178 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/04/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17209A175 | List: |
| References | |
| NUDOCS 8010030086 | |
| Download: ML17209A178 (3) | |
See also: IR 05000335/1980021
Text
~8 RE<0
D$
~0
+**++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
AUG -ztgso
In Reply Refer To:
'RII:WHM
50"335/80-21
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P,. 0. Box 529100
Miami, FX
33152
Gentlemen:
This refers to the inspection
conducted by W. H. Miller, Jr., of this office on
July 8-11,
1980, of activities authorized
by
NRC Operating License
No.
for the St. Lucie facility, and to the discussion
of our findings held with
C.
M. Wethy at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Five new unresolved
items resulted
from this inspection
and are discussed
in the
enclosed report.
These items willbe examined during subsequent
inspections.
During the inspection, it was found that certain activities under your license
appear
to be in noncompliance
with NRC requirements.
This item and references
to pertinent, requirements
are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.2Q1
of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Section 2.201- requires
you to submit to this office, within 20 days of your
receipt of this notice,
a written statement
or explanation in reply including:
(1) corrective steps
which have been taken by you and the results
achieved;
(2)
corrective steps
which will be taken to avoid further noncompliance;
and (3) the
date when full compliance, will be achieved.
During the inspection it was
found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item identified in the Notice of Deviation enclosed herewith as Appendix B.
Please
provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken,
corrective actions
which will be taken to avoid further deviations;
and
the date corrective actions were or willbe completed.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
'itle
10,
Code of Federal
Regulations,
a
copy of this letter and the enclosed
~
~
inspection report will be placed in the
NRC's Public Document
Room. If this
report
contains
any information that you (or your contractor)
believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
80 >003 0~Eh
Florida Power and Light Company
AUG -4 1980
application must include
a full statement
of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should'be
prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document. If we do not hear from you in this regard within
the specified period, the report willbe placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E. Murph , Chief
Reactor Construction
and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report No. 50-335/80-21
cc w/encl:
~
~
C.
M. Wethy, Plant Manager
Nat Weems, Assistant
QA Manager
0