APPENDIX B NOTICE OF DEVIATION Florida Power and Light Company St. Iucie
. License No. DPR-67
-'.Based on the results of the NRC inspection conducted on July 8-11, 1980 certain of your activities appear to deviate from the commitments to the Commission as indicated below:
Florida Power and Light (FPSrL)
Company's letter L-78-280 from R. E. Uhrig to V. Stello, NRR dated August 28, 1978 provided a specific list of the FPRL fire protection procedures which did not adhere to the NRC guidelines entitled "Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls, and Quality Assurance" dated June 14, 1977 and provided a justification for these deviations.
Contrary to the
- above, the following additional fire protection administrative control procedures do not meet the NRC guidelines and no exception to these guidelines were identified in FPSL's letter of August 28, 1978:
1.
Procedure are not provided for the control of open flame and other possible ignition sources other than welding and cutting operations as required by Paragraph 1 of Attachment 4 of the NRC guidelines.
2.
Procedures do not require the concurrence by a qualified member of the plant's management or Quality Control inspector when supervisor determines that a fire watch is not required for a welding, cutting or other "hot work" operation as required by Paragraph 2.c of Attachment
- 4 to the NRC guidelines.
3.
Procedures do not require oxyacetylene equipment to be checked for leaks before being moved into the work area as required by Paragraph 2.b.(4) of Attachment 4 to the NRC guidelines.
8 010 03 Ou'fA