ML17208A600
| ML17208A600 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 05/02/1979 |
| From: | Schmidt A FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML17208A601 | List: |
| References | |
| NUDOCS 8005200492 | |
| Download: ML17208A600 (17) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS~
4CCESSION NBR:8005200492 DOC ~ DATE: 79 05/02 NOTARIZED:
NO DOCKET 0
FACIL:50 250 Turkey Point Plant~
Uni P Florida Power and Light C
05000250 50-251 Turkey Point Plant~
Unit 4P Florida Power and Light C
+50.
50 335 St ~ Lucie Planti Unit 1P Florida Power 8 Light Co.
%(8000335 AUTH ~ IVAME AUTHOR AFFILIATION SCHMIDTPA.D, Florida Power 8 Light Co, RECIP,NAME RECIPIENT AFFILIATION Of f i ce of Management and Progr am Anal ysi s
SUBJECT:
Forwards monthly ooerating reots fof Apr 1979 '
DI sTRI OUT IO u coDE:
Aooss cgplEs REGEIYED:LTR Q ERDL g slzE:
+
TITLE> Annual, Semi Annual S ttenthlv Omar at i ng Reperts (OL Stag NOTES:
RECIPIENT ID CODE/NAME ACTION:
0 I
INTERhAL: 01 ~~K 11 I 8E 16 DIR DOR 19 RFAC SAFT BR 21 EEB 23 EFFL TR SYS EXTERNAL: 03 LPDR 24 NATL LAB 26 ACRS COPIES LTTR ENCL 6
6 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
15 15 RECIPIENT ID CODE/NAME 02 NRC PDR 14 MPA 18 ENGR BR 20 PLANT SYS BR 22 CORE PERF BR AEOD 04 NSIC 25 BROOKHAVEN COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 ENID C/O TOTAL NUtv'BE R OF COPIES REQUIRED:
L T TR ~
ENCL
8 OOOO,go 492
. BOX 5"91CO, >AIAMI,FL 3" 152 t
gX<g/p
':,:. tA~
FLORIO* PCVi=R 0, LIGHT CC.'.!RA;iY May 2, 1979 Office of Management information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 C~ntlemen:
Attached are the April, 1979, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. 1.
Very truly yours, Vice President Power Resouxces VTC/DDC cc:
Nr. James P. O'Reilly Robert Lowenstein, Esquire
AVERAGE DAILYUNITPOWER LEVEL 8 006/.OD 499 DOCKET NO.
50 250 Turkey Point CO>XIPLETED DY V. T. Chilson MONTH APRIL, 19 79 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net) 2 DAY AVERAGE DAILYPOWER LEVEL
'>%We Net) 17 18 10 12 13 14 15 19 20 21 22 23 24 25 26 27 28 30 0
400 78 INSTRUCTIONS NOTE:
Average daily power level greater than 666 MWe due to cooler condenser cooling water.
On this format, list the average daily unit P>>wer level in Mme Net for each day in tl>e rcI>orting >n>>nth. C>>>nputc to the nearest whole megawat t.
(<)1771
OPERATING DATAREPORT OPERATING STATUS Turkey Point Unit No.
3 760 693 00 666
- 1. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt.):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
DOCKET NO.
DATE 2~~~9.79 COMPLETED DY ~~bilson TELEPHONE M~~2-3824 Notes-Unit No.
3 operated at approximately 100% R.P.
following completion'f re-fueling outage on April 16, 1979 except for outages of April 16, 17-18, 19-23 and 29-30, 1979.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, lfAny: ~
NONE This Month Yr..to-Date Cumulative 2 879.0 345.0 236.1 4 0 358 142 335 122 641 8.2 8.2 6.4 6.1 32.9
- 11. Hours In Reporting Period 719.0
- 12. Number Of Hours Reactor Was Critical 343.2
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 234. 7
- 15. Unit Reserve Shutdown Hours l7. Gross Electrical Energy Generated (MWH) 142 160 18, Net Electrical Energy Generated (MWH) 127 916
- 19. Unit Service Factor 32.6
- 20. Unit AvailabilityFactor 32.6
- 21. Unit Capacity Factor (Using MDC Net)
.26.7
- 22. 'Unit Capacity Factor (Using DER Net)
- 25. 7
- 23. Unit Forced Outage Rate
- 32. 9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- None, 56'20.6 42 917.4 194.6 41 413.4 97.3 82 217 306 26 176 765 24 769 818 73.8 74.0 66.9
'63. 7 2.8
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
N A Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMhIERCIALOPERATION
UNlTSHUTDO'WNS AND PO)YER REDUCTlONS DOCKET NO I
it No.3
'age 1 of 3 Yo.
Date cI o
Ul rsO Llccnscc Event Rcport 4 El c tA o ~
Q U E p3 V
~
Cause A Corrcctlvc Action to Prcvcnt Rccurrcnrc 79-01-01 S
368.8 RC FUELXX Unit No'.
3 was removed from service for scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and non-nuclear ystems)
CB PUMPXX
. (B)
Outage was extended to repair mechan-ical sealson'eactor coolant pumps.
(Nuclear system) 79-04-16 F
1.6 H
3 N/A HA PRPXX (B)
Unit was tripped due to loss of tur-bine system oil pressure.
Corrective actions included returnisrg the turbine oil egectors to service.
(Non-nuclear system)
F: Forced S: Scheduled
<<)/77)
Reason; A Equipment Failure (Explain)
B.Maintenance or Test C'-Refueling D.Regulatory Rcstrlction E.Operator Training A Uccnsc Exanilnatlon F-hdrninistrativc G Operational Error (Explain) ll.Other (Explain) 3 Method:
1.Manual '
Manual Scram.
3.Autontatic Scram, 4.Other (Explain)
Exhibit G ~ instructions for Preparation of Data Entry Shccts for Licensee Event Rcport (LER) File (NVREC.
OI 6 I )
Exhibit l.- Same Source
UNITSHUTDOWNS ANDPOWER REDUCTIONS it No.3 REPORT MONTH Page 2 of 3 COMPLETED BY No.
Date Cl lA CJ ir, J
0 ~ ec
~ C/l Liccnscc Event Rcport C
o ~
Q C$
tJ Cause A, Corrective Action to Prcvcnt Rccurrcnce 79-04-16 F
4.8 B
N/A GENERA Unit was removed from service to balance the generator exciter.
(Non-nuclear sys tern) 79-04-16 F
8.0 B
4 N/A GENERA Unit was removed.from service to balance the generator exciter.
(Non-nuclear system) 79-04-17 F
13.7 B
N/A GENERA Unit was removed from service to balance the generator exciter.
(Non-nuclear system) 79-04-19 F
84.9 N/A GENERA Unit was removed from service due to high temper'ature in generator stator.
Corrective actions included changes
.to hydrogen orifices to provide proper hydrogen flow distribution.
(Non-nuclear s stem)
F: Forced S: Scheduled P)/77)
Reason:
A.Equipment Failure (Explain)
D.Maintenance or Test C.Refueling D.Regulatory Restriction E Operator Training c% Liccnsc Exan:ination F-Administrative G.Operational Error (Explain)
H-Other (Explain) 3 Method:
I.Manual 2.Manual Scram, 3.Automatic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Lieenscc Event Rcport (LEIO File (NUREG-OI6l )
Exhibit I - Satne Source
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO.
0 - 250 COMPLETED BY Page 3 of 3 No.
Date Liccnscc Event Report c~V E~
PJ Cause Er. Corrective Action to Prevent Recurrcncc 79-04-29 2.6 N/A HH VALVEX (c)
Unit was tripped by steam generator level protection system.
Corrective actions included isolating and re-pairing condensate pump No.
3C discharge check valve.
(Non-nuclear sys tern)
I F: Forced S: Scheduled Reason:
A-Equipmcnt Failure (Explain)
B Maintenance or Test C-Refueling D.Rc ulatory Restriction E.Operator Training i% Liccnsc Examination F-Administrative G.Operational Error (Explain)
H Other (Explain) 3 Method:
I-Manual 2-Manual Scram.
3 Automatic Scram.,
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Shccts ior L!ccnsce Event Rcport (LER) File (NUREG-OI6I) 5 Exhibit I - Sante Suttrcc
AVERAGE DAILYUiIITPOWER LEVEL DOCKET NO. Turkey Pox'<
UNIT ~~o DAN@ Bay MONTH APRIL, l9 79 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net) 612 DAY AVERAGE DAII.YPOWER LEVEL (MWe Net) 17 18 19 20 21 22 10 12 13 14 15 16 24 25 26 27 2S 29 30 31.
INSTRUCTIONS On this format, list the average daily onit power level in Mme Net for each day in the rcportiilg llloiltll.Ctillli)U(cto thc nearest wliole megawat t.
19/77)
OPERATING STATUS OPERATING DATAREPORT DOCKET NO
~50 2
2 DATE Z~~L979 COMPLETED BY 3L L bolson TELEPHONE ~0~552-3824 Notes-Unit No.
4 oPerated at pproximately 95% R.P. until.
nit was removed from service for scheduled refueling, main
- tenance, and inspections ex-ept for outage of April 4-5.
979.
Turke Point Unit No. 4 I. Unit Name.
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross M'iVe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum De endable Ca acit Net MWe:
2200 693 700 666 p
y(
)
- 8. IfChanges Qccur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr.-to-Date Cumulative 2 879.0 Il. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (hDVH)
I 7. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
. 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outa e Rate
- 24. Shutdowns Scheduled Over Next 6 Months 96.0 2 188.3 2 182.0.96.0 210 158 62 145 56 989 4 077 101 1 267 100 1 192 739 75.8 13.3 75.8 13.3 62..2 11.9 59.8 11.4 1.4 4.4 (Type, Dhte. and Duration of Each):
49'48.0 36 535.9 138.8 35 001.0 72 216 968 23 102 825 21 877 444 70.2 70.2 66.3
'63. 3 2.7
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
('t/77)
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50 COMPLETED DY it No.4 No.
Date rl Cl gr I
A J tl Q~ C/7 Licenscc Event Report ~
C V
QE~
Cause Ec Corrcctivc Action to Prevent Rccurrcnce 79-04-04 F
4.4 N/A ZZ ZZZZZZ Unit was tripped by turbine-generator pro tee tion sys tera due to sys tern load conditions.
(Non-nuclear system) 79-04-05 S
618.6 N/A RC FUELXX Unit No.
4 out of service for scheduled refueling, maintenance, and inspections.
(Nuclear and non-nuclear systems)
F: Forced S: Scheduled Reason:
A Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D.Regulatory Restriction E.Operator Training A Liccnsc Examination F-Administrative G.Operational Error (Explain)
H Other (Explain)
Method:
I.Manual 2.Manual Scram.
3-Autontatic Scram.
4 Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Shccts for Liccnscc Event Rcport (LER) File (NUREG-016l) 5 Exhibit I - Satnc Source
AVERAGE DAILYUNITPOWER LEVEL St. Lucia
~9 COMPLETED IIY V-T. ChilSOn TELEPHONE MONTH APRIL, 1979 DAY AVERAGEDAILYPOWER LEVEL (MWe Net)
DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) l7 IS I9 20 2l 23 IO l3 l4 IS I6 25 26 27 1S 29 30 INSTRUCTIONS On this format, list the averaSe daily unit I)ower level in MWe.Net for each day in the rcportinI; month. Compute to the nearest whole megawatt.
(t>/77 I
OPERATING DATAREPORT OPERATING STATUS 850
]. Unit Name St. Lucie Unit No.
1
- 2. Reporting Period:
- 3. Licensed Thermal Power (hlWt):
- 4. Namcplatc Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. hIaximum Dependable Ca'pacity (Gross MWe):
- 7. hiaximum Dependable Capacity (Net MWe):
822'77 DOCKET NO.
DATE Za~~79 COMPLETED BY Z '~~son TELEPHONE ~i52-3824 Notes - Unit was removed from
'ervice on April 1, 1979, for scheduled refueling, maintenance, and inspec-tions.
S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To IVhich Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, lf'Any:
NONE This Month 719.0 Yr.~to-Date 2 879.0 2 009.5 0.1 1 991.7 0.1 0884 1 635 500 1 543 302 889 69.2 0.0 69.2 0.0 70.0 0.0 66.8 0.0 7.8 0.0 Date. and Duration of Each):
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using hIDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.
Cumulative "20'63.0 16 797.1 118. 5 16 350.9 21.0 9 256 995 12 742 450 11'86 140 79.1 79.2
- 74. 7
'72. 3 6.6
- 5. IfShut Down At End Of Report Period, Estimated Date of Startup.'6.
Units In Test Status (Prior to Commercial Operation):
June 4, 1979 Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMhIERCIALOPERATION
('>/77)
UNITSHUTDOWNS AND POKER REDUCTIONS DOCKET NO. 50 UNIT NAME St. Lucie Unit No.1 COMPLETED BY No.
Date Licenscc Event Report CJ CP'nV'w g
Q Q
IE (J to Cause Ec Corrcctivc Action to Prcvcnt Recurrence 5
79-04-01 S
718.9 C
N/A RC HJELXX Unit was removed from service for scheduled refueling, maintenance, and inspections.
(nuclear and non-nuclear systems)
I F: Forced S: Schcdulcd
(')/77)
Reason:
A.Equipment Failure (Explain)
B-Maintenance or Test C.Rcfue1ing D.Regulatory Restriction E.Operator Trainingh License Examination F-Administrative G-Operational Error (Explain) ii Other (Explain) 3 Method:
14Ianual 2-Manual Scram, 3-Automat tc Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Shccts for Liccnsce Event Rcport (LER) File (NUREG-0161)
Exhibit I ~ Sante Source
. BOX 529100,
~111AIWII. rL ~3IS2 FLGAIOA PC'eVER h LIGI1T GG,'IPAi4Y May 2, 1979 Office of Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
- 20555, Gentlemen:
Attached are the April, 1979, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, A. D. Schmidt-Vice President Power Resources VTC/DDC cc:
Mr. James P. 0'eilly Robert Lowenstein, Esquire
SUHl1APY OF OPERATING EXPERIENCE DOCKET NO.
UNIT 50 250 Turkey Point Unit No.
3 DATE Ma 2,
1979 COMPLETED BY V. T. Chilson REPORT MONTH APRIL, 19 79 TELEPHONE (305) 552-3824 Unit operated at approximately 100% R.P. after the unit was returned to service following completion of scheduled refueling, maintenance, inspections, and tests, except for the outages of April 16, 17-18, 19-23 and 29-30, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the April, 1979, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the'onth included:
Completed repairs to mechanical seals on reactor coolant pumps.
SUllMARX OF OPERATING EXPERIENCE DOCKET NO.
50 251 Turkey Point Unit No.
4 DATE Ma 2
1979 COMPLETED BY V. T. Chilson REPORT MONTH APRIL, 1979 TELEPHONE (305) 552-3824 Unit operated at.Approximately 100% R.P. until unit was removed from service for scheduled refueling, maintenance, and inspections except for outage of April 4-5, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the April, 1979, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:'ompleted the Steam Generator Tube Inspection Program.
SUMMARY
OF OPERATING EXPERIENCE POCKET NO.
50 335 St. Lucie N
DATE 2
1979
'COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH ~
APRIL 1979 Unit was removed from service 'on April 1, 1979, for scheduled refueling, maintenance,
.and inspection.
Refer to "Unit Shutdowns and Power Re-ductions" section of the April, 1979, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Installed 68 new fuel assemblies.
Completed modifications to steam generator tube support plates.
Started modification of charging pump suction piping.