ML17339B039
| ML17339B039 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 05/02/1979 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17208A601 | List: |
| References | |
| NUDOCS 8005200499 | |
| Download: ML17339B039 (26) | |
Text
~ g r
t AVERAGE DAILYUNITPOWER LE r.
8 OOSQ.O 4~~
DOCKET NO.
50 250 Turkey Point DATE COMpLETED IIY V. T. Chilson MONTH APRXL, 1979 DAY AVERAGEDAlLYPOWER LEVEL (MWe-Net) 2 DAY 'VERAGE DAlLYPOWER LEVEL
'MWe Net) 17 18 19 20 21 10 12 13 14
.15 16 INSTRUCTlONS 23 24 25 26 27 30 NOTE:
400 Average daily power level greater than 666 NWe due to cooler condenser cooling water.
On this format, list the average daily unit power level in Mme-Nct for caclt day in tlte reporting tnonth. Con>putc to the nearest whole megawat t.
(9I771
V
I OPERATING DATAREPORT OPERATING STATUS DOCKET NO.
DArE m~~79 COMPLETED BY ~~hi3.son TELEPHONE Q~~2-3824 Notes-Unit No. 3'perated at approximately 100% R.P.
fo11owing completion'f re-
.fueling outage on April 16, 1979 except for outages of April 16, 17-18, 19-23 and 29-30, 1979.
Turkey Point Unit No.
3
- 1. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thermal Power (MIVt):
- 4. Nameplate Rating (Gross MWc):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum De endable Ca tacit Net Mme:
760 00 666 p
I y(
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
- 9. Power Level To which Rcstrictcd, IfAny (Net hIWc):
- 10. Reasons For Restrictions, lfAny: ~
NONE
,Yr.-to-Date This Month 719.0 2 879.0 345.0 343.2 234. 7 236. 1 44 651 142 160 4038 142 335 127 916 122 641 32.6 8.2 8.2 32.6 6.4 26.7 25.7 6.1
- 32. 9 32.9 Type. Date, and Duration of Each):
I I. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (hIWH)
- 19. Unit Scrvicc Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net) 22.'Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (
None.
Cumulative 56 120.6 42 917.4 194. 6 41 413;4 97.3 82 217 306 26 176 765 24 769 818 73.8 74.0 66.9
'63. 7 2.8
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
N A Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMhtERCIAL OPERATION
('t/77)
'P
UNlTSHUTDOWNS ANDPOSER REDUCTlONS 'OCKETNO 50 - 250 Y~
it No.3 Page 1 of 3 Yo.
Date Licensee Event Report Vcw0 E~
V Cause &Corrcctivc Action to Prcvcnt Rccurrcncc 79-01-01 S
368.8 RC FUELXX Unit'No'.
3 was removed from service for scheduled refueling, maintenance, and inspections.
(Continued from previous'onth)
(Nuclear and non-nuclear systems)
Ca PUMPXZ
. (s)
Outage was extended to repair mechan-ical sealson'eactor coolant pumps.
(Nuclear system) 79-04-16 P
1.6 N/A PPiPXX (a)
. Unit was tripped due to loss of tur-bine system oil pressure.
Corrective actions included returning the turbine oil ejectors to service.
(Non-nuclear
'ystem)
F: Forced S: Scheduled Reason; A Equipment Failure (Explain) 8 Maintenance or Test C'.Refueling D.Regulatory Restriction E.Operator Training 0- License Exaniination F-Administrative G.Operational Error (Fxplaln)
H.Other (Explain) 3 Method:
lbianual '
2-i~ianual Scram, 3-Automatic Scram, 4.Other (Explain)
~ ~
Exhibit C ~ instructions for Preparation of Data Entry Shccts for Licensee Event Report (LER) File (NUREC.
OI61)
Exhibit l -. Satne Source
UNITSHUTDOWNS AYiDPOWER REDUCTIONS REPORTMONTH APRIL, 1979 Page 2 of 3 it No.3 Yo.
Date Liccnscc Event Report
~w Co ~
2 ~
CJ Cause E Corrective
~
Action to Prevent Recurrence 79-04-16 4.8 B,
4 N/A HA GENERA Unit was removed from service to balance the generator exciter.
(Non-nuclear system) 79-04-16 8.0 B
N/A HA GENERA Unit was removed. from service to balance the generatoi exciter.
(Non-nuclear system) 79-04-17 13 7
.B 4
N/A GENERA Unit was removed from service to balance the generator exciter.
(Non-nuclear system) 6 79-04-19 84.9 B
N/A HA GENERA Unit was removed from service due to high temper'ature in gene'rator st:ator.
Corrective actions'ncluded changes
.to hydrogen orifices to provide proper hydrogen flow distribution.
(Non-nuclear system) l F: Forced S: Scheduled Reason:
A Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Rcstrktion E-Operator Training A Liccnsc Exan:ination F-Administrative G.Operational Error (Explain)
H.Other (Explain) 3 Method:
I -Manual 2-Manual Scram.
3-Automatic Scratn.
4.Other (Explain)
Exhibit G ~ Instructions for Preparation of Data Entry Sheets ior Liecnsec Event Rcport (LER) File (NUREG-OI6j) 5 Exhibit I - Satne Source
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO 50 250 COMPLETED BY it No.3 Page 3 of 3 No.
Date PI Vl Cp rr, I
r Vl
~c Liccnscc Even't Repo. t..
cw
() Q E~
Co Cause &, Corrective Action to
'Prevent Rccurrcnce 79-04-29 2.6 N/A VALVEX (c)
Unit was tripped by steam generator level protection system.
Corrective actions included isolating and re-pairing condensate pump No.
3C discharge check valve.
(Non-nuclear system)
F: Forced S: Scheduled (9/77)
Reason:
A-Equipmcnt Failure (Explain)
B-Maintenance oi Test C'-Refueling D-Regulatory Restriction E-Operator Training i% Lice>>sc Examination F-Administrative G-Operational Error (Explain)
H Other (Explain)
Method:
I-Manual 2-Manual Scram, 3-Auton;atic Scram..
4.Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Shccts for Llccnsce Event Rcport (LER) Fiic (NVREG-OI6I)
Exhibit I - San>c Source
AVERAGE DAILYVNITPOWER LE L
DOCKET NO. Turkey Point UNIT U~~a DATB Bc' 19 79 M.axx, 1979 DAY AVERAGEDAILYPOWER LEVEL (MWc-Net) 612 DAY AVERAGE DAII.YPOWER LEVEL (MWe-Nct) 17 IS 19 20 21 22 23 IQ 12 13 I4 15 16 25 26 27 2S 29 30 INSTRUCTIONS
\\
On this format, list the average daily unit power level in Mme.Nct for>>ach day in th>> reporting inonth. Compute to thc nearest whole megawat t.
(9(77)
OPERATING STATUS OPERATING DATAREPORT DOCKET NO ~0- 251 DATE Za~~79 COMPLETED BY ~~bolson TELEPHONE 0~552-3824 Notes-Unit No.
4 operated at pproximat:ely 95% R.P. until unit. was removed from'service for scheduled refueling, main
- tenance, and inspections ex-ept for out'age of April 4-5.
979.
Turke Point Unit: No.
4 I. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thcnnal Power (MWt):
- 4. Nameplate Rating (Gross Mme):
- 5. Design Electrical Rating (Net MWc):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. maximum De endablc Ca tacit Net MWe:
2200 693 700 666 p
I y(
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. *Power Level To tVhich Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr..to-Date Cumulative 2 879.0 96.0 2 188.3.. 96.0 2 182.0 4 077 101 1 267 100 210 158 62 145 1 192 739 56 989 75.8 13.3 75.8
- 13. 3 62.. 2 11.9 59.8 11.4 1.4 4 ~ 4 Date. and Duration of Each):
llLQ
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (hIWH)
- 17. Gross Electrical Energy Generated (hIWH)
- 18. Nct Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
. 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity I'actor (Using DER Nct)
- 23. Unit Forced Outage Rate.
- 24. Shutdowns Scheduled Over Next 6 hionths (Type, 49'48.0 36 535.9 138. 8 35 001.0 72 216 968 23 102 825 21 877 444
- 70. 2 70.2 66.3
'63.3 2.7
- 25. IfShut Down At Eml Of Report Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
Forecast Acil le vcd INITIAL CRITICALITY INITIAL ELECTRICITY COMhIERCIAL OPERATION
('t/77 )
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50 251 COMPLETED BY it No 4 Xo Date c'
VI CPrr Cr,
~
J PJ
~(A $
Licensee Event Report CP CP'a Vl cn 6 C
~@1 CP.
CP rC +
PJ Cause I, Corrcctivc Action to Prevent Recurrence 79-04-04 H
N/A ZZ ZZZZZZ Unit was tripped by turbine-generator protection system due to system load conditions.
(Non-nuclear system)
.79-04-05 618.6 C
N/A RC FUELXX Unit No.
4 out of service for scheduled refueling, maintenance, and inspections.
(Nuclear and non-nuclear systems)
F: Forced S: Scheduled
(')/77)
Reason:
A-Equipmcnt Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Trair:ing A Liccnsc Examination F-Administrative G-Operational Error (Expla!n)
H.Otncr {Explain) 3 Method:
I-Manual 2-Manual Scram.
3-Autotnatic Scram.
4.Other (Explain)
Exhibit G - Inst ruetions I'r Preparation of Data Entry Shccts for Licensee Event Rcport (LER) File (NUREG-016I) 5 Exhibit I - Same Source
AVEIIAGE DAILYUNITPOWER LEVEL DOCKET NO.
5O 335 St. Lucia DATE Hay~~79 COMPLETFD By U. T. Chi 1SO>
TELEPHONE gQQ!~5~ 82 4 MONTH APRXL' DAY AVERAGE DAILYPOWER LEVEL (MWe.Nct) 10 12 13 14 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net.}
17 18 19 20 21 22 23 24 25 26 27 28 29 30 INS'I'RUCTIONS Qn this format, list the average daily unit power level in MEYe-Net I'or each day in thc reporting month. Compute to the nearest vvholc ntcgawatt; (9l771
OPERATING DATAREPORT OPERATING STATUS DOCKET NO.
50 335 DATE ~~~79 COMPLETED BY D~~bilson TELEPHONE ~~2 3824 Notes Unit was removed from
'ervice on April 1, 1979, fo'r scheduled refueling, maintenance, and'nspec-tions.
St. Lucie Unit No.
1
- 1. Unit Name
- 2. Reporting Period:
- 3. Licensed Thermal Power (hi Wt):
- 4. Namcplatc Rating (Gross Mme):
- 5. Design Electrical Rating (Nct hkWe):
- 6. Maximum Dependable Capacity (Gross MWc):
7 maximum Dc icndablc Ca acit Net MWe:
2560 850 822'77 p
y(
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To IVliichRestricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, lfAny:
NONE
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Ho<us I G. Gross Thermal Energy Ge'nerated (hIWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (hIWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using hIDC Net)
- 22. Unit Capacity Factor (Using DER Nct)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, This Month 719.0 0.1 0
0.1 889 0.0 0.0 0.0 0.0 0.0 Yr:to.Date 2 879.0 2 009.5 '
991.7 5 038 847 1 635 500 1 543 302 69.2 69.2 70.0 66.8 7.8 I
Date, and Duration of Each):
Cumulative "20'63.0 16 797.1 118.5 16 350;9 21.0 9 256 995 12 742 450 ll'86 140 79.1
- 79. 2
- 74. 7
'72. 3
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
June 4, 1979 Forecast
'chieved INITIALCRITICALITY INITIALELECTRICITY COMhIERCIAL OPERATION
('>/77 )
UNITSHUTDOWNS AND POKER REDUCTIONS DOCKET NO. >0 UNITNAME St. Lucie Unit No.1 REPORT MONTH A~R>L No.
Date gr, I
~ t/7 $
Liccnscc Event Repvrt Cause 2 Correct!ve Action to Prcvcnt Recurrence 79-04-01 S
718.9 N/A RC FUELZX Unit was removed from service for scheduled refueling, maintenance, and inspections.
(nuclear and non-. nuclear systems)
F: Forced S: Scheduled
(')/77)
Reason:
A-Equipmcnt Failure (Explain)
B.Maintenance or Test C-Refueling D.Regulatory Restriction E.Operator Training k. Lice!!sc Examination F-Administrative G.Operational Error (Explain)
H.Other (Explain)
Method:
I-Manual 2.Manual Scram.
3.Automatic Scram.
4-Otncr (Explain)
Exhibit G - Instructions for Preparation of Data Entry Shccts for Liccnsce Event Rcport (LER) File (NUREG-016l)
Exhibit I ~ San!c Source
0
P.O. BOX 529100, Allhi411. PL 03152 FLORIDA PO4V5R d LIGHT CO41PANY May 2, 1979 Office of Management, Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555.
Gentlemen:
Attached are the April, 1979, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l..
Very truly yours, CgXQ4 A. D. Schmidt Vice President
'ower Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire
S 1ARY Ol" OPERATING EXPERIHh POCKET NO.
50 250 Turkey Point Unit No.
3 DATE Ma 2,
1979 COMPLETED BY '.
T. Chilson REPORT MONTH APRIL, 19 79 TELEPHONE (305) 552-3824 Unit operated at approximately 100-o R.P. after the unit was returned to service following completion of scheduled refueling, maintenance, inspections, and tests, except for the outages of April 16, 17-18, 19-23 and 29-30, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the April, 1979, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the'onth included:
\\
Completed repairs to mechanical seals on reactor coolant pumps.
S RY OF OPERATING EXPERIE POCKET NO-50 251 Turkey Point, UNIT Unit, No.
4 DATE Ma 2
1979 COMPLETED BY '.
T. Chilson REPORT MONTH APRIL, 1979 TELEPHONE (305) 552-3824 Unit operated at.approximately 100% R.P. until unit was removed from service for scheduled refueling, maintenance, and inspections except
~ for outage of April 4-5, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the April, 1979, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:'ompleted the Steam Generator Tube Inspection Program.
~.
r I
S.
RY OF OPERATING EXPHRIEh DOCKET NO-50 335 UNIT St. Lucie N
1 DATE a
2 1979
'COMPLETED BY TELEPHONE V. T. Chilson 305 552-3824 REPORT MONTH.
APRIL 19 79 Unit was removed from service on April 1, 1979, for scheduled refueling, maintenance,
.and inspection.
Refer to "Unit Shutdowns and Power Re-ductions" section of the April, 1979, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Installed 68 new fuel assemblies.
Completed modifications to steam generator tube support.
plates.
Started modification of charging pump suction piping.
)