ML17207A897

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. No Written Response Required
ML17207A897
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/08/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8003180058
Download: ML17207A897 (4)


Text

~S AE0I (4

~o A

r 0

+0

+0

++*++

In Reply Refer To:

RII:JPO

-389 UNITED STATES NUCLEAR R EG ULATORY COMMISSION REGION II 101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 FF.B 8 1980 Hls Florida Power and Light Company Attn:

R. E. Uhrig, Vice President Advanced Systems and Technology P. 0. Box 529100 Miami, FL 33152 Gentlemen:

The enclosed IE Bulletin No. 80-.04, is forwarded to you for information.

No written response is required.

If you desire additional information regard-ing this matter, please contact this office.

Sincerely, James P.

0 Re lly Director

~ rr

Enclosures:

1.

IE Bulletin No. 80-04 2.

Most Recently Issued IE Bulletins

~

~

4 Soo.sx Booing

r

FEB 8 1%9 Florida Power and Light Company cc w/encl:

C.

M. Wethy, Plant Manager Post Office Box 128 Ft. Pierce, Florida 33450 Nat Weems, Assistant gA Manager Post Office Box 128 Ft. Pierce, Florida 33450