Text
~IIRfgy
~o
ty
nO
++*++
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
Ogc ] 9 1S79
In Reply Refer To:
RII:PKV
50-335/79-34
50"389/79-21
I
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President,
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
This refers to the inspection
conducted
by P. K. VanDoorn of this office on
November 27-30,
1979, of activities authorized by NRC Operating License
No.
and Construction Permit No.
CPPR-144 for the St. Lucie facility, and to
the discussion of our findings held with B. J.
Escue at the conclusion of the
inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
I
h
Within the scope of this inspection,
no items of noncompliance
were disclosed.
We have examined actions
you have taken with regard to previously identified
enforcement matters
and unresolved
items.
The status of these
items is
discussed
in the enclosed report.
One new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed report.
This item will be examined during subsequent
inspections.
In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement
of the reasons
on the basis of which
it-is claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document
Room.
'
Florida Power and Light
Company
-2"
DEC 19 1979
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Reactor Construction
and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-335/79-34
and 50-389/79"21
cc w/encl:
C.
M. Wethy, Plant Manager
P. 0.
Box 128
Ft. Pierce,
FL
33450
Nat Weems, Assistant
QA Manager
~
~
~
P. 0.
Box 128
Ft. Pierce,
FL
33450
2(
0
F
r