Forwards IE Insp Repts 50-335/79-34 & 50-389/79-21 on 791127-30.No Noncompliance Noted
ML17207A796
Person / Time
Site: Saint Lucie  
Issue date: 12/19/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A797 List:
References
NUDOCS 8002110158
Download: ML17207A796 (4)


See also: IR 05000335/1979034

Text

~IIRfgy

~o

ty

nO

++*++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

Ogc ] 9 1S79

In Reply Refer To:

RII:PKV

50-335/79-34

50"389/79-21

I

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President,

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection

conducted

by P. K. VanDoorn of this office on

November 27-30,

1979, of activities authorized by NRC Operating License

No.

DPR-67

and Construction Permit No.

CPPR-144 for the St. Lucie facility, and to

the discussion of our findings held with B. J.

Escue at the conclusion of the

inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

I

h

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have examined actions

you have taken with regard to previously identified

enforcement matters

and unresolved

items.

The status of these

items is

discussed

in the enclosed report.

One new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement

of the reasons

on the basis of which

it-is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

'

Florida Power and Light

Company

-2"

DEC 19 1979

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Reactor Construction

and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-335/79-34

and 50-389/79"21

cc w/encl:

C.

M. Wethy, Plant Manager

P. 0.

Box 128

Ft. Pierce,

FL

33450

Nat Weems, Assistant

QA Manager

~

~

~

P. 0.

Box 128

Ft. Pierce,

FL

33450

2(

0

F

r