ML17207A772
| ML17207A772 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 12/05/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17207A773 | List: |
| References | |
| NUDOCS 8002010088 | |
| Download: ML17207A772 (4) | |
See also: IR 05000335/1979031
Text
~R REoo
+4
~o
Cy
A0
C
O
Vl
0v
Cy
+~ ++*++
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSlON
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
DEC 0 5 1979
In Reply Refer To:
RII:EJV
50-335/79-31
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen;
This refers
to the
inspection- conducted
by E. J. Vallish of this office on
November 14-16,
1979,
of activities
authorized
by
NRC Operating
License
No.
DPR-67 for the St. Iucie Nuclear Plant facility, and to the discussion of our
findings held with C.
M. Wethy at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title
l0, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold such
information from public disclosure.
Any such application
must
include
a full statement
of the reasons
on the basis of which it is claimed that
the information is proprietary,
and
should
be prepared
so that proprietary
information identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E.
Mu
hy, Chief
Reactor Constru
'
and Engineering
Support Branch
Enclosure:
See
Page
2
SOOSOIO OVS
DEC 0 5 1979
Florida Power and Light Company
"2-
Enclosure:
Inpsection Report No. 50-335/79-31
cc w/encl:
C.
M. Wethy, Plant Manager
P. 0. Box 128
Ft. Pierce,
FI
33450
Nat Weems, Assistant
QA Manager
P. 0. Box 128
Ft. Pierce,
FL
33450
I
0